Use Classes and Change of Use

Drinking establishment with expanded food provision

7 min readBy PlanScope Editorial Team

A drinking establishment and a drinking establishment with expanded food provision are two separate sui generis uses. Here is how councils tell them apart and why the description on your permission matters.

A pub that starts serving proper meals has probably moved from one sui generis use to another, because the Use Classes Order treats a drinking establishment and a drinking establishment with expanded food provision as two separate descriptions. Neither sits in a use class. Both were left outside Class E when the 2020 amendments reorganised the Order, so neither enjoys the flexibility that shops, cafes and offices now have. The practical question for an operator is whether the food side has grown far enough to need permission, and whether the permission they already hold describes what they are actually doing.

Get the description right at the application stage and a decade of operational flexibility follows. Get it wrong and every menu change is a planning question.

Two separate sui generis descriptions

Before 2020 pubs and wine bars sat in Class A4. An amendment in 2017 added the phrase "drinking establishments with expanded food provision" to that class, recognising that a substantial part of the trade in many pubs had become food.

The 2020 amendments revoked Class A4 and moved both descriptions into the sui generis list in article 3(6) of the Order. They are listed separately, which is the point that matters: a sui generis use can only change to another use with planning permission, and moving between two separately listed sui generis descriptions is a change of use.

Class E(b), the sale of food and drink for consumption on the premises, is a third position again. A restaurant is in Class E and can become a shop or an office without permission. A pub cannot become anything without permission, and that asymmetry is deliberate policy protection for public houses rather than an oversight.

Part 3 of Schedule 2 to the GPDO 2015 does contain a right allowing a drinking establishment to add expanded food provision, with a right to revert to the drinking establishment use. Part 3 has been amended repeatedly, so read the current text rather than a summary, and check whether an Article 4 direction has removed it locally.

How councils decide which one applies

There is no percentage in the Order, and the phrase "expanded food provision" is not defined. Officers assess it as a matter of fact and degree, looking at the character of the operation as a whole.

The features that come up in every assessment:

  • The proportion of turnover from food against wet sales.
  • Whether the kitchen is a commercial kitchen with a full menu or a microwave and a panini press.
  • Table service, bookings, covers laid for dining, and whether tables are reserved for diners.
  • Hours during which food is served relative to opening hours.
  • Marketing: whether the premises is promoted as a place to eat.
  • Layout: a dedicated dining area, distinct from drinking space.

A pub serving sandwiches at lunchtime is a drinking establishment. A pub with a chef, two sittings, bookings and 60 covers is a drinking establishment with expanded food provision, and if the drinking side has all but disappeared it may have become a restaurant in Class E(b) instead. The boundary between the two sui generis descriptions is softer than the boundary with Class E, and that softness is where disputes live.

Why the distinction changes the conditions

The label decides what the council can control. A permission for a drinking establishment with expanded food provision invites conditions on kitchen extraction, delivery times and waste storage that a plain drinking establishment permission would not carry.

It also changes the direction of travel on hours. A drink-led operation attracts conditions aimed at dispersal, external drinking areas and late night noise. A food-led operation attracts conditions aimed at extraction, odour and servicing. Where an operator holds a permission written for one and runs the other, the conditions on the file are the wrong ones, and that mismatch surfaces the first time a neighbour complains.

Issue Drinking establishment With expanded food provision
Typical condition focus Hours, dispersal, external areas Extraction, odour, deliveries, waste
Kitchen extraction Often not assessed Expected to be assessed
Licensing interaction Late hours, outdoor drinking Earlier closing, table service
Change to Class E(b) Needs permission Needs permission
Protection from change of use Strong, permission needed Strong, permission needed

Changing the balance of trade without permission

Operators rarely decide to change use. The kitchen gets busier, a chef is hired, the menu grows, and three years later the pub is a restaurant that also serves beer.

That drift is capable of amounting to a material change of use, and the risk sits with the operator rather than the landlord. Two things follow. Where the trading balance is shifting deliberately, apply before the change rather than afterwards, because a prospective application is decided on planning merits while a retrospective one is decided against a background of complaints. And where the shift has already happened, a Lawful Development Certificate for an existing use under section 191 of the Town and Country Planning Act 1990 is the way to establish the position.

Where food becomes a takeaway operation as well, a further line is crossed, since hot food for consumption off the premises is a separate sui generis use again. Hot food takeaway as a sui generis use sets out where that boundary falls and what the ancillary argument looks like.

Evidence of the existing operation

The evidence that settles these arguments is commercial rather than architectural. Keep it as you go.

  1. Annual turnover split between food and drink, from the accounts, for each of the last several years.
  2. Menus, dated, showing how the offer has developed.
  3. Booking records or covers served by day part.
  4. Staff rotas showing kitchen hours.
  5. A measured floor plan showing the dining and drinking areas with their areas annotated.
  6. Photographs of the interior at different dates.

That file does two jobs. It supports a certificate application if one becomes necessary, and it answers an officer who suspects a bigger change than has actually happened. Where the question is whether the food side is ancillary rather than a separate use in its own right, the reasoning in ancillary use and when it becomes a separate planning unit applies in the same way.

Extraction and noise as the practical consequences

Whatever the class label, the two technical issues that decide applications for pub kitchens are extraction and noise.

Extraction needs a flue, and the flue needs to terminate high enough and fast enough to disperse cooking odour away from windows above and around. A Ventilation and Extraction Statement should state the extraction rate, the filtration appropriate to the cooking type, the flue route and termination height, and the fan attenuation. On a listed building or in a conservation area the flue route is a design problem as much as a technical one, and it is the reason many kitchen proposals are refused.

Noise covers three sources that get confused with each other: plant noise from the extract fan and any refrigeration, which is assessed against background under BS 4142, amenity noise from customers in a beer garden or on the pavement, and music. A Noise Impact Assessment should deal with each separately, and councils expect a suitably qualified acoustician, with professional review strongly advised.

Deliveries and waste finish the list. A commercial kitchen generates daily food waste and takes early deliveries, and a condition restricting both to daytime hours is the usual outcome. Agree wording you can live with rather than accepting an officer's first draft.

Describing the use you actually want

The description of development on the application form becomes the permission, and the permission is what you live with. Think about it before submission rather than copying the description from the previous decision notice.

Where the intention is a food-led operation that still wants to serve drinkers, applying for a drinking establishment with expanded food provision keeps both sides available. Where the intention is a restaurant, Class E(b) gives far wider flexibility afterwards, because movement within Class E is not development, as covered in moving within Class E without a planning application. The trade-off is that a Class E permission surrenders the policy protection that pubs enjoy, and in some local plans that protection is worth keeping.

One honest uncertainty. Councils differ on whether they will grant a description covering both sui generis uses, and some will insist on choosing. Ask at pre-application, and if the answer is a single description, pick the one that matches the operation you expect to be running in five years rather than the one you are running this month.

You can draft the planning statement and the supporting technical narrative for a pub or restaurant application in PlanScope in minutes, then send it for professional review before submission. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Is a pub in a use class?

No. Drinking establishments and drinking establishments with expanded food provision are both sui generis, listed separately in article 3(6) of the Use Classes Order after the 2020 amendments revoked Class A4. That means a pub cannot change to any other use without planning permission, which is deliberate policy protection for public houses rather than an oversight.

How much food makes a pub a drinking establishment with expanded food provision?

There is no percentage in the Order and the phrase is undefined, so it is assessed as a matter of fact and degree. Officers weigh the turnover split between food and drink, whether there is a commercial kitchen and full menu, table service and bookings, the hours food is served, the marketing, and whether there is a dedicated dining area.

Do I need permission to start serving meals in my pub?

Possibly. Part 3 of Schedule 2 to the GPDO 2015 contains a right allowing a drinking establishment to add expanded food provision with a right to revert, but Part 3 has been amended repeatedly and an Article 4 direction can remove it locally. Read the current text and check with the council before relying on it.

Is it better to apply for Class E(b) instead?

It depends on what you want afterwards. A Class E(b) permission gives wide flexibility because movement within Class E is not development, so the premises could later become a shop or an office. The cost is surrendering the policy protection that public houses attract in many local plans, which is worth keeping where the site has value as a pub.

What technical evidence does a pub kitchen application need?

An extraction statement giving the extraction rate, filtration suited to the cooking type, flue route and termination height and fan attenuation. Plus a noise assessment dealing separately with plant noise against background under BS 4142, customer noise in outdoor areas, and music. Councils expect a suitably qualified acoustician for the noise work.

Sources and further reading

use classessui generispublic housechange of useextractionnoise

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use8 min read

Betting shops, payday lenders and amusement arcades

Betting offices, pay day loan shops and amusement arcades sit outside the use classes, so there is no permitted change into them and no fallback use to rely on.

Read article →
Use Classes and Change of Use6 min read

Padel and outdoor sport: consents and conditions

The use class is the easy part. How padel noise is assessed when there is no national method, what the lighting limits require, and when Sport England is consulted.

Read article →
Use Classes and Change of Use6 min read

Self-storage and the limits of Class B8

Self-storage sits within Class B8, but ancillary sales, trade counters and processing all test the edge of the class. Where the line falls and how it is conditioned.

Read article →
Use Classes and Change of Use7 min read

Dog day care and boarding: which consents you need

Day care and boarding sit outside the Use Classes Order, so the change of use always needs permission. Barking decides the case, and welfare licensing is a separate consent.

Read article →
Use Classes and Change of Use8 min read

Live-work units and how councils classify them

A live-work unit is a composite use, not a use class. That is why permission is needed, why the conditions are tight, and why councils worry about the work element disappearing.

Read article →
Use Classes and Change of Use7 min read

Merging two dwellings and the loss of a unit

Combining two dwellings into one is not automatically a change of use. Whether permission is needed turns on local housing retention policy and the evidence you bring.

Read article →