Costs, Fees and Budgeting

What an EIA screening and scoping request costs

8 min readBy PlanScope Editorial Team

Screening and scoping requests under the 2017 EIA Regulations carry no fee. The budget sits in the desk studies that make a request credible and the programme that follows.

Neither a screening request under regulation 6 nor a scoping request under regulation 15 of the Environmental Impact Assessment Regulations 2017 attracts a statutory fee, so the eia screening request cost is entirely your own consultants' time plus whatever technical work the request needs to be credible. That makes the real budget question different from the one people ask. The money is not in the request. It is in the three to six months of programme and the evidence base that follow a positive screening opinion.

So the way to think about both stages is as cost avoidance rather than cost incurred.

The fee position for screening and scoping requests

The 2017 Regulations do not provide for a charge, and local planning authorities do not levy one for adopting a screening or scoping opinion. What councils do charge for is pre-application advice, and some will try to fold an informal discussion about environmental matters into a paid pre-application package. Those are different things, and a request for a formal opinion under the Regulations stands on its own.

The statutory periods are short. A screening opinion must be adopted within three weeks of receipt of the request, extendable by agreement, and a scoping opinion within five weeks, after the authority has consulted the statutory consultees. Both periods start from receipt of a request containing what the Regulations require, which is the same validity point that bites on prior approval applications.

Build the three and five weeks into the programme rather than treating them as background activity. A screening request submitted in late July will sit over the summer.

Evidence a screening request needs to carry

Regulation 6 asks for a plan sufficient to identify the land, a description of the development including its physical characteristics and location, and a description of the aspects of the environment likely to be significantly affected. You may submit anything else you consider relevant, and that discretion is where the cost and the value sit.

A bare minimum request invites a precautionary opinion. An authority with no information about ecology, heritage or traffic will reach for the safe answer, and the safe answer is that EIA is required. A properly argued request addresses the Schedule 3 selection criteria directly: the characteristics of the development, its location including the sensitivity of the receiving environment, and the type and characteristics of the potential impact.

In practice that usually means commissioning a modest amount of work before the request: a desk-based ecology appraisal, a heritage desk study, a trip generation estimate, a flood risk position, and a note on cumulative effects with other committed development nearby. Each is a fraction of the cost of the equivalent chapter in an environmental statement, and together they are what persuade an officer that significant effects are unlikely.

Stage Statutory fee Period Main cost driver
Screening request, regulation 6 None 3 weeks from receipt Supporting desk studies and the Schedule 3 argument
Scoping request, regulation 15 None 5 weeks from receipt Drafting the proposed scope and methodologies
Environmental statement Not applicable Determined with the application Full technical chapters by competent experts

Consultant time against authority time

Two clocks run and only one of them is yours.

Your consultants' time on a screening request is spent on the description of development, the desk studies, the Schedule 3 analysis and the cumulative effects note. On a scoping request it is spent on something harder: proposing the scope, the study areas, the baseline years, the assessment methodologies and the significance criteria for each topic, in enough detail for the authority and its consultees to agree or amend them.

The authority's time is spent consulting. For a scoping opinion it must consult the statutory consultees, and the quality of what comes back depends heavily on how specific your proposed scope is. A vague scoping request produces a scoping opinion full of requests for everything, because a consultee asked an open question answers it broadly.

That is the single most useful thing to understand about scoping economics. Specificity in the request narrows the opinion, and a narrow opinion is what keeps the environmental statement proportionate.

Programme effect of a positive screening opinion

A positive screening opinion changes the shape of the project rather than just adding a document.

The determination period becomes 16 weeks instead of 13 for a major application. Publicity requirements expand. The environmental statement has to be prepared by competent experts, which the Regulations require rather than merely encourage, so an Environmental Impact Assessment is a report where qualified professional input is legally required and an AI-assisted draft can only be a starting point for that team.

The bigger effect is seasonal. Ecological survey windows do not move: bat emergence surveys run from May to September, great crested newt work falls in the spring, and breeding bird surveys cover March to August. A positive opinion arriving in October can push the application submission to the following autumn. Noise and air quality baselines have their own timing constraints too, and a monitoring period has to be planned rather than squeezed, as the practicalities of budgeting a noise survey and its monitoring period show.

Then there is the cost of the evidence base itself, which on a major scheme is the largest single line in the pre-application budget and feeds straight into the land value and into any viability assessment and its review mechanism.

Scoping opinion content and why it saves money

Scoping is optional. Requesting an opinion is almost always worth it anyway, for one reason: it converts an open-ended obligation into an agreed list.

A useful scoping opinion tells you which topics are scoped in and which are scoped out, the study area for each, the baseline data to be used, the methodology and significance criteria, the cumulative schemes to be considered, and the alternatives to be described. Each of those settled in advance removes a line of objection at determination and removes a risk of having to redo a chapter.

Scoping out is where the saving is. A topic scoped out with the consultees' agreement does not need a chapter, and on a scheme with no watercourse, no heritage asset and no protected species interest, several topics can go. The authority will not scope anything out unless you give it a reasoned case, so write the request as a set of propositions with evidence rather than as a list of questions.

One caution. A scoping opinion does not bind the authority absolutely, and a consultee can raise something later. Treat it as a strong steer rather than a contract, and keep the scope under review if the scheme changes materially.

Challenging a screening opinion

If you disagree with an opinion that EIA is required, two routes exist and they behave differently.

You can ask the Secretary of State for a screening direction, which overrides the authority's opinion. It is the practical route, it costs nothing in fees, and it takes time measured in weeks rather than months. The request has to be better argued than the original, with the Schedule 3 criteria addressed point by point.

Judicial review is the other route and it is rarely proportionate for a screening decision on a private development, given cost and timescale. It is also a review of the legality of the decision rather than of its merits.

There is a third, often better option. Change the scheme. If the opinion turns on one element, such as the scale of a particular use or an access arrangement, removing or reducing that element and requesting a fresh opinion is quicker than arguing.

Designing below a Schedule 2 threshold

Schedule 2 thresholds for urban development projects include more than one hectare of development that is not dwellings, more than 150 dwellings, and an overall site area exceeding five hectares. Designing deliberately below a threshold is legitimate, and developers do it routinely.

Two things limit the tactic. In a sensitive area, which includes sites of special scientific interest, National Parks, National Landscapes, World Heritage Sites and scheduled monuments, Schedule 2 development is screened whatever its size, so the thresholds give no comfort. And the cumulative effects of your scheme with other development, including your own earlier or later phases, have to be considered, so splitting a 200 dwelling scheme into two applications of 100 does not avoid screening if the two are obviously one project.

Authorities are alert to it. A screening request for a 148 dwelling scheme adjoining land in the same ownership will be read with the whole landholding in mind, and the honest course is to say so in the request and address cumulative effects head on.

A worked illustrative budget for both stages

Illustrative example, with cost lines rather than invented figures, because consultant rates vary and publishing a number would be a guess.

For the screening stage, budget: a desk-based ecological appraisal, a heritage desk study and historic environment record search, a trip generation note, a flood risk and drainage position statement, the description of development and site plan, and the Schedule 3 analysis drafted by the planning consultant. Add a contingency for a screening direction request if the opinion goes against you.

For the scoping stage, if screening is positive: the drafting of proposed scope and methodologies for each topic, specialist input from each discipline to set its own study area and baseline, a cumulative schemes search, and coordination time to assemble the request. Then the statutory five weeks.

Put both on the appraisal as a single pre-application line, and put the potential environmental statement cost beneath it as a separate, clearly flagged risk. The useful discipline is to price the environmental statement before you request screening, so that the decision about whether to change the scheme is taken with the number in front of you.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required. See PlanScope pricing if you are costing the drafting of supporting documents alongside the technical work. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is there a fee for an EIA screening opinion?

No. The Environmental Impact Assessment Regulations 2017 do not provide for a charge, and authorities do not levy one for adopting a screening or scoping opinion. Councils do charge for pre-application advice, which is a separate service, so do not let an informal environmental discussion be folded into a paid package.

How long do screening and scoping opinions take?

A screening opinion must be adopted within three weeks of receipt of a valid request, extendable by agreement. A scoping opinion takes five weeks, because the authority has to consult the statutory consultees first. Both periods run from receipt of a request containing what the Regulations require.

Why does a thin screening request lead to a positive opinion?

Because an authority with no information about ecology, heritage, traffic or flooding reaches for the precautionary answer. Addressing the Schedule 3 selection criteria with supporting desk studies costs a fraction of an environmental statement chapter and is what allows an officer to conclude that significant effects are unlikely.

Can I challenge a screening opinion?

Yes. Asking the Secretary of State for a screening direction overrides the authority's opinion, costs nothing in fees and takes weeks rather than months, but the argument has to be better than the original. Judicial review is rarely proportionate. Often the quickest answer is to change the element that drove the opinion.

Does staying under a Schedule 2 threshold avoid screening?

Not in a sensitive area, where Schedule 2 development is screened whatever its size, and not where the cumulative effect with other development makes the scheme one project. Splitting a larger scheme into phases below the dwelling threshold does not work where the phases are plainly part of the same development.

Sources and further reading

eiascreeningscopingbudgetingmajor development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

What a planning budget covers and what belongs in build cost

The planning budget is cash spent before you own a consent. Allocating surveys, fees and condition compliance correctly keeps the self-build mortgage drawdown and the planning spend apart.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting for the local validation checklist

Local validation requirements drive the cost of an application pack, not the national list. Price each triggered item as a named line before quoting, and challenge the items that cannot be material.

Read article →
Costs, Fees and Budgeting7 min read

Heritage budgeting: desk assessment against intrusive recording

Heritage spend splits between desk-based analysis and intrusive recording or evaluation. The recording level and the post-excavation assumption decide what the client actually pays.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a transport evidence base by scheme size

The transport evidence base scales in steps. Work out which document the authority requires before commissioning surveys, and order the low cost work so it de-risks the expensive work.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting an ecology package across the survey seasons

Ecology cost is driven by which month you start, not by day rates. Commission the appraisal in autumn, book spring survey slots, and price a second season as a named line.

Read article →
Costs, Fees and Budgeting8 min read

What an appeal actually costs beyond the Inspectorate

No fee is payable to lodge an appeal in England, so the budget is professional time, expert evidence and months of delay. The step from written representations to an inquiry is not incremental.

Read article →