The equality analysis section of an equalities impact assessment
The equality analysis is where an equalities impact assessment earns its place. It names the protected characteristics the scheme engages, cites ward-level evidence, and ties every effect to mitigation the permission can secure.
The equality analysis is the part of an equalities impact assessment where you stop describing the scheme and start showing your working. It sets out which protected characteristics the proposal touches, what evidence you have about the people who hold them, and how the effects differ between groups. Everything else in an equalities impact assessment supporting a planning application is scaffolding. This section is the bit a planning officer copies into the committee report, and the bit a claimant's solicitor reads first.
Get it wrong and the usual result is not refusal. It is a late request for more information, a deferred committee item, and three weeks lost while somebody assembles the ward-level data that should have been in the submission.
Where the duty actually sits
Section 149 of the Equality Act 2010 places the public sector equality duty on the local planning authority, not on you. The council must have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations between people who share a protected characteristic and those who do not. The nine characteristics are age, disability, gender reassignment, marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex, and sexual orientation.
That distinction changes how you write. You are not discharging the duty. You are handing the decision maker the material it needs to discharge it, in a form that survives being lifted into a delegated report. Write the analysis as though the officer will quote it verbatim, because on most schemes that is exactly what happens.
The duty bites at the point of decision, so the analysis has to be about the proposal as it stands at determination, not the scheme you submitted eight months earlier. If the design changed at the amendment stage, the analysis changes with it.
Deciding which characteristics the scheme engages
Most weak assessments run all nine characteristics through the same table and write "no impact identified" seven times. Officers discount that immediately, and they are right to.
Work the other way round. Start from what the development physically does, then ask which groups experience that differently. A ground-floor retail unit converted to residential removes a service used disproportionately by older residents without cars. A student scheme changes the age profile of a street. A site with a 1 in 20 gradient and no lift matters to disabled residents and to people with pushchairs in a way it does not matter to anyone else. Demolition of a building in community use engages religion or belief if the building houses a congregation.
Four or five characteristics analysed properly beat nine analysed nominally. Where a characteristic is not engaged, say so in one line and give the reason, then move on.
Evidence rather than assumption
The analysis section fails most often because it asserts demographics instead of citing them. Census data from the Office for National Statistics is available at output area and ward level and is the default source for age, disability, ethnicity, religion and household composition. The council's own joint strategic needs assessment and equality profile fill in health and deprivation. Your own consultation record supplies the rest.
Three rules hold the section together:
- Give the geography. "The ward has a higher proportion of residents aged 65 and over than the district average" needs the ward named and the source cited, or it is decoration.
- Give the date of the data and note where it is superseded.
- Separate what you measured from what you inferred. Inference is allowed. Disguising it as measurement is not.
Where you have no data at all, write that you have no data and explain what you did instead. An honest gap is defensible. A confident number that nobody can trace is not, and invented figures are the fastest route to an assessment being disregarded in full.
Describing differential effects without flattening them
A differential effect is one that lands harder, or lands differently, on a group sharing a protected characteristic. The description needs three things: who, what, and how much.
| Element | Weak version | What officers can use |
|---|---|---|
| Who | "Some residents" | Residents aged 75 and over in the two sheltered blocks on the northern boundary |
| What | "May be affected by construction" | Loss of the level pedestrian route to the pharmacy for an estimated 14 months |
| How much | "Minor adverse" | 240 m diversion with one uncontrolled crossing, against a current 90 m step-free route |
Say plainly where an effect is positive. Schemes routinely deliver step-free access, lift provision or wheelchair-adaptable homes that improve on the existing position, and the analysis should record that with the same specificity it applies to harm. Balanced does not mean neutral.
Avoid collapsing everything into a single significance score. The duty is about regard to effects on identified groups, so a five-point scale that hides which group is affected works against you.
Mitigation the planning system can actually secure
Mitigation only counts if it can be delivered through the permission. That means a condition, a section 106 obligation, or a design change drawn on the submitted plans. A commitment sitting in a consultant's report with no mechanism behind it is worth very little at committee.
Practical examples that do hold: a condition requiring a construction management plan to maintain a step-free diversion route and to consult named sheltered housing schemes before each phase, an obligation securing a proportion of wheelchair user dwellings with the standard defined by reference to Approved Document M category 3, or a requirement that the play space design meets an inclusive play specification approved before first occupation. A Statement of Community Involvement is where you show that the groups affected were reached in the first place, and it should not contradict the equalities analysis sitting beside it.
Monitoring deserves a short paragraph rather than a page. Name what is measured, who measures it, and when the results go to the council. If nothing is monitored, say that too.
Recording that the duty was discharged
The officer needs to be able to write one paragraph in the report that says the duty was considered, with reference to specific effects and specific groups. Give them the material for it.
A usable closing structure lists each engaged characteristic, the effect identified, the evidence source, the mitigation, and the residual position after mitigation. Keep it to a page. Cross-refer to the fuller analysis rather than repeating it.
Two things to avoid. Do not write that the scheme "complies with the Equality Act", because compliance is not the test and the duty is procedural rather than outcome-based. And do not date the analysis and then leave it unrevised through two rounds of amendments, because a stale assessment invites the argument that regard was had to the wrong scheme.
Where an assessment gets picked apart
Challenges to the adequacy of an equalities analysis tend to land on the same three points. The first is that a group was simply not identified, usually because the analysis started from the characteristics list rather than from the development. The second is that an effect was identified but not quantified, so nobody could weigh it. The third is that mitigation was described but never secured.
Appeal decisions and judgments are indicative of how inspectors and judges have approached the duty rather than binding on your scheme. Read them for the standard of reasoning expected, not for a template.
Where the scheme also needs a Health Impact Assessment or a Social Infrastructure Assessment, align the population data across all three. Contradictory demographic baselines in the same submission pack are noticed, and they undermine every document in it.
An Equalities Impact Assessment drafted in PlanScope gives you the structure, the statutory framing and a place for every effect, flagging wherever site specific data is missing rather than filling the gap with an invented number. The ward evidence and the consultation record still have to come from you. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.
Enter your postcode on PlanScope to see which reports your site is likely to need before you commit to a submission date.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Who has to comply with the public sector equality duty on a planning application?
The duty under section 149 of the Equality Act 2010 falls on the local planning authority as decision maker, not on the applicant. Your assessment exists to give the council the material it needs to have due regard to the effects at the point of decision. That is why the analysis should be written so an officer can lift it straight into a delegated or committee report.
Do I have to assess all nine protected characteristics?
No. You have to identify the ones the development engages and analyse those properly. Running all nine through a table and writing no impact seven times tells a decision maker nothing. Where a characteristic is not engaged, state that in a single line with the reason, then spend the space on the characteristics that matter to the site.
What data sources are acceptable for the evidence base?
Census data from the Office for National Statistics at ward or output area level is the usual starting point for age, disability, ethnicity, religion and household composition. The council's joint strategic needs assessment and its own equality profile add health and deprivation data. Your consultation record supplies the rest. Always name the geography, the source and the date of the data.
Does an equalities impact assessment have to be prepared by a specialist?
There is no statutory competency requirement, unlike an ecology or fire safety document. In practice the analysis needs someone who can read census data correctly and who understands what a planning condition or obligation can and cannot secure. Professional review before submission is sensible on any scheme where a group is materially affected during construction or after occupation.
Can mitigation in an equalities assessment be secured by condition?
Often yes, provided it is precise enough to be enforceable. Access routes during construction, inclusive play specifications and accessible dwelling standards all sit comfortably in conditions. Financial contributions and occupancy restrictions need a section 106 obligation instead. Mitigation with no mechanism behind it carries very little weight when the application is determined.