Evacuation provision for wheelchair users at planning stage

7 min readBy PlanScope Editorial Team

Evacuation lifts need a shaft, a protected lobby and a power route; refuges need clear floor area in the core. Both are fixed by the planning drawings, not by building control.

Evacuation provision for wheelchair users planning decisions turn on is settled at outline and early detailed design, not at building control. An evacuation lift needs a shaft, a protected lobby and a power supply route. A refuge needs floor area inside a protected stair enclosure. Both eat into the core, and once the core dimension is fixed by an approved drawing, adding them later means either losing a flat or going back for a section 73 application. So the question belongs in the pre-application discussion.

For relevant buildings, the point is also formally in front of the planning authority. Article 9A of the Town and Country Planning (Development Management Procedure) (England) Order 2015 requires a fire statement with the application, and the Health and Safety Executive is a statutory consultee at that stage under the Planning Gateway One arrangements introduced by the Building Safety Act 2022 framework.

Why the issue reaches the planning stage at all

Three things drag it forward from the technical design phase.

First, the core is the least flexible part of a residential building. Stair width, lobby depth, riser positions and lift shaft dimensions are load bearing decisions in every sense, and they are drawn at planning.

Second, accessible dwelling mix is a policy requirement in many areas, and a policy that delivers wheelchair user dwellings on upper floors implies a means of getting those residents out. The London Plan requires a proportion of new dwellings to meet Building Regulations requirement M4(3) with the balance at M4(2), and boroughs apply the policy by unit and by tenure. Providing M4(3) units at level six with no evacuation lift is an internal contradiction the case officer can reasonably ask about.

Third, the second staircase change for taller new residential buildings has reopened core design generally. Where a scheme is being re-planned for a second stair, that is the moment to resolve evacuation lift provision rather than after.

Evacuation lifts and their spatial demand

An evacuation lift is a passenger lift specified and protected so it can be used under fire service control or, in some designs, by residents under a managed procedure. What it needs is more than the lift car.

  1. A shaft with the required fire resistance, usually within or adjacent to the protected core.
  2. A protected lobby at each level served, sized to hold waiting wheelchair users clear of the escape route.
  3. A secondary power supply with cabling routed so a fire in one compartment does not take out both supplies.
  4. Communication equipment at each landing and a point of control, normally at the fire service access level.
  5. Machine space and overrun, which affects roof height and therefore the elevation.

The plan area consequence is the part design teams underestimate. A lobby that satisfies both the stair and the evacuation lift is deeper than a standard lift lobby, and on a small urban plot that depth comes out of the flats. On a single core scheme of eight or nine dwellings per floor, it can be the difference between a viable layout and one that loses a unit per storey.

The specification itself is a fire engineering matter. BS 9991 deals with fire safety in residential buildings and covers evacuation lift and refuge provision, and which recommendations apply depends on building height, occupancy and the design approach taken. PlanScope's Fire Safety Strategy report is a starting point for that work rather than a substitute: a BS 9991 or BS 9999 strategy is a fire engineering document and a professional with the necessary fire engineering competence is legally required to prepare it.

Refuge provision within the core

A refuge is a relatively safe waiting place, accessible from a storey exit, where someone who cannot use the stairs can wait for assisted evacuation. Approved Document B sets out the arrangement, including the wheelchair space that must be kept clear of the escape route and the communication provision that goes with it.

Two practical failures show up at planning stage. The refuge is drawn inside the stair enclosure in a position where a wheelchair reduces the effective stair width below what the escape calculation assumed. Or the refuge is shown on a plan but the stair core is dimensioned as if it were not there, so the area appears twice.

There is also the question of how many refuges a building needs and where. That follows from the escape strategy, so it cannot be resolved by adding a symbol to each floor plan.

Accessible and adaptable dwelling standards

Requirement M4(2) covers accessible and adaptable dwellings and M4(3) covers wheelchair user dwellings, with M4(3)(2)(a) for adaptable and (b) for accessible units. The distinction matters to evacuation because an M4(3) unit is designed for someone who is a wheelchair user now or will be, which makes assisted evacuation a foreseeable requirement rather than a possibility.

Where the local plan sets a percentage, say in the application how many units of each standard you are providing, on which floors, and how residents of those units leave the building in a fire. Putting all the M4(3) units at ground and first floor is one answer and it is not always the right one, because it concentrates a tenure or dwelling type in the least desirable part of the building.

A Fire Statement is where that reasoning belongs for relevant buildings. For buildings below the threshold, it belongs in the design and access narrative, and the question of what evidence to provide just under the threshold is covered in our note on fire evidence for a building just below the threshold.

Management responsibilities after occupation

Planning cannot secure a management procedure, and pretending otherwise weakens a submission. What planning can do is make the physical provision possible and record it.

The management layer sits under the Regulatory Reform (Fire Safety) Order 2005 and the Fire Safety (England) Regulations 2022, which place duties on the responsible person for a residential building, including information for residents and, for higher-risk buildings, information for the fire and rescue service. Arrangements for residents who cannot self-evacuate have been the subject of government consultation and the requirements have been moving, so check the current position rather than relying on an older summary.

Write the application so that the building works under a managed procedure if one is required, and do not commit the applicant to a procedure they will not control after sale or handover.

Equality duty considerations for the decision

Section 149 of the Equality Act 2010 places the public sector equality duty on the local planning authority when it decides the application. It is a duty to have due regard, not a duty to reach a particular outcome, and it cannot be discharged by a single sentence in the committee report.

Where a scheme provides wheelchair user dwellings above the ground floor and the submitted drawings show no evacuation lift and no refuge arrangement, an objector has an obvious line of attack. Where the submission explains the provision, the alternatives considered and why the chosen approach works, the duty is straightforward to record.

Illustrative example: a nine storey block of 54 flats, single core, with six M4(3) units distributed from level one to level seven. The scheme provides an evacuation lift in the core and a refuge at each level within the stair lobby, and the design and access narrative sets out the distribution by floor and tenure. The layout loses about 4 m2 per floor to the deeper lobby. Figures here are illustrative.

What the submission should commit to

Keep the commitments physical and drawable.

Show the evacuation lift on the general arrangement plans with the shaft and lobby dimensioned. Annotate the refuge position and its clear wheelchair space at each level. Schedule the M4(2) and M4(3) units by floor, core and tenure. Say where the secondary power supply enters the building and by what route. State which standard the fire strategy follows and who prepared it.

Then let the fire engineer confirm the detail. A planning submission that overstates what has been engineered creates a discharge of conditions problem later.

Enter your postcode on PlanScope to see which reports a residential scheme at your site is likely to need. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is an evacuation lift a planning matter?

Its provision is settled by the planning drawings even though the specification is a building control and fire engineering matter. The shaft, the protected lobby depth and the machine space all affect plan area and roof height. For relevant buildings the fire statement required by Article 9A of the DMPO 2015 brings the strategy formally before the authority.

What is a refuge and how much space does it need?

A refuge is a relatively safe waiting place accessible from a storey exit where a person who cannot use the stairs waits for assisted evacuation. Approved Document B sets out the arrangement, including a clear wheelchair space that must not reduce the effective escape width. Draw it and dimension it rather than adding a symbol.

Does providing M4(3) dwellings require an evacuation lift?

Not automatically, and a scheme with wheelchair user dwellings on upper floors and no assisted evacuation provision is hard to defend. The fire strategy decides what is needed. Schedule the M4(2) and M4(3) units by floor and tenure in the application and explain how residents of those units leave in a fire.

Who has to prepare the fire strategy?

Someone with the necessary fire engineering competence. A BS 9991 or BS 9999 strategy is a fire engineering document, and for relevant buildings the fire statement is a legal requirement with the Health and Safety Executive as statutory consultee. An AI-drafted structure helps organise the submission and does not replace that professional.

How does the public sector equality duty apply?

Section 149 of the Equality Act 2010 requires the local planning authority to have due regard to the listed matters when deciding the application. It does not dictate an outcome. A submission that explains evacuation provision, the alternatives considered and the reasons for the chosen approach makes the duty simple for the officer to record.

Do personal emergency evacuation plans affect the application?

They sit in the occupation phase under fire safety legislation rather than in the planning permission, and the requirements have been moving following government consultation. Check the current position. Design the building so a managed procedure is possible, and avoid committing an applicant to arrangements they will not control after handover.

Sources and further reading

fire safetyaccessible housingevacuation liftplanning gateway oneequality duty

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Fire, Structural and Basements

View all →
Fire, Structural and Basements6 min read

Basement waterproofing grades and what to show

The grade of internal environment drives the whole waterproofing design, and pump resilience is the part a planning officer will press hardest on.

Read article →
Fire, Structural and Basements6 min read

Basement impact assessment: the three strands councils want

A basement impact assessment is a framework, not a document. Three strands, three stages, an independent audit, and the strand applicants usually underestimate.

Read article →
Fire, Structural and Basements7 min read

Measuring height for the 18 metre fire statement threshold

Height for a fire statement is measured from the lowest adjacent ground level to the floor surface of the top storey, excluding roof-top plant. The storey count is a separate test and either one triggers the requirement.

Read article →
Fire, Structural and Basements7 min read

Plant screens, enclosures and separation distances for substations

There is no single separation standard for a substation. Operator access rules, BS 4142 noise assessment and street frontage design all pull on the same position, and all three belong on the first layout.

Read article →
Fire, Structural and Basements8 min read

Shoring and temporary works during demolition

Planning does not approve temporary works, but propping footprint, highway occupation and party wall stability all constrain the permanent scheme. Resolve them at design stage, not after permission.

Read article →
Fire, Structural and Basements8 min read

Excavating a swimming pool in a garden

Class E of the GPDO covers a swimming pool in a domestic garden, but the enclosure, the plant room, twenty lorries of spoil and the backwash discharge are where schemes come unstuck.

Read article →