Evidence base for a scheme relying on a fallback position

6 min readBy PlanScope Editorial Team

A fallback only carries weight if the alternative is lawful and there is a real prospect it would be built. A certificate of lawfulness turns the argument into a fact.

A fallback argument says: refuse this and something worse will happen lawfully instead. It only works if you can show the worse thing would actually be built. The fallback position planning evidence that persuades an inspector therefore has two halves, and most submissions produce only the first. Half one is that an alternative development is lawful. Half two is that there is a real prospect it will be implemented if permission is refused.

Both halves are evidential. Neither is satisfied by asserting that permitted development rights exist.

What the argument claims, in planning terms

A fallback is a material consideration, not a policy test. You are inviting the decision maker to compare two futures: the scheme before them, and the lawful alternative that would follow refusal. Where the proposal causes less harm than the alternative, that comparison weighs in favour of permission even if the proposal conflicts with policy.

The argument is at its strongest in three settings. A permitted development right the applicant could exercise tomorrow. An extant planning permission capable of implementation. An established lawful use the applicant could resume or intensify.

It is at its weakest when the alternative requires a further consent, a third party's agreement, or an economic decision nobody has committed to.

Showing a real prospect of implementation

The courts have settled on a low but genuine threshold: there must be a real prospect, not merely a theoretical possibility, that the fallback would be carried out. A fanciful alternative carries no weight. Beyond that, the weight given is a matter for the decision maker and scales with how likely implementation looks.

The evidence that moves the needle is the evidence of commitment and capability.

  • A lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990 confirming the alternative is lawful. This is the single most persuasive document available, because it removes the argument about lawfulness entirely.
  • A prior approval already granted for the alternative, where the class requires one.
  • An extant permission with its expiry date, evidence of a material start where one has been made, and the discharge position on conditions that must be satisfied before works begin.
  • Drawings of the fallback at the same level of detail as the application scheme, not a sketch.
  • A costed build programme or a contractor quotation showing the alternative is deliverable.
  • A written statement from the applicant, and ideally from the landowner, that the alternative will be pursued on refusal.

Where the land is in someone else's control, deal with that head on. A fallback that depends on a third party doing something has to be supported by evidence about that third party, not about the applicant's intentions.

Evidencing the fallback scheme in detail

Treat the fallback as if you were applying for it. That is the discipline that separates arguments that land from arguments that are dismissed in a paragraph.

Draw it properly, at the same scale and in the same drawing set as the proposal. Quantify it: floorspace, height, number of units, parking, footprint, extent of hardstanding, trees affected. Then state its effects on the same receptors the proposal is assessed against, using the same methods.

The constraint evidence has to be done twice as well. If the site sits in a Source Protection Zone, both futures need the groundwater position addressed, because an inspector comparing two schemes wants the comparison to be like for like. The same applies where a known bat roost is present: an alternative that would destroy the roost cannot be presented as a lawful fallback without dealing with the separate licensing regime, since survey and mitigation licensing legally require a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017.

Comparing harm properly

Set the comparison out as a table and keep the receptors constant.

Receptor Fallback scheme Application scheme
Neighbour daylight and outlook Effect and evidence Effect and evidence
Highway safety and parking Effect and evidence Effect and evidence
Landscape and visual Effect and evidence Effect and evidence
Heritage significance Effect and evidence Effect and evidence
Trees and ecology Effect and evidence Effect and evidence
Drainage and flood risk Effect and evidence Effect and evidence

Two drafting rules make the table credible. Concede where the proposal is worse on a receptor, because a comparison that favours the applicant on every line reads as advocacy. And avoid comparing against a deliberately bad fallback: a straw alternative nobody would build is the quickest way to lose the argument.

The comparison also has to deal squarely with permanence. A fallback that would be built and then remain for 60 years is a different comparison from one that could be reversed.

Where the argument usually fails

Four failures account for most of it.

The alternative turns out not to be lawful. Permitted development rights were removed by condition on an earlier permission, or by an Article 4 direction, or the limits of the class are exceeded once someone measures. This is why the certificate route is worth the fee and the eight-week wait.

The prospect is theoretical. Nobody has costed the alternative, nobody has said they will build it, and the applicant's own evidence shows the site is being promoted for the application scheme only.

The fallback is not a true alternative. It would not deliver the applicant's objective, so refusing the proposal would not lead to it. Inspectors notice when the fallback is a worse version of a different project.

The comparison is incomplete. The fallback is assessed on two receptors and ignored on the rest, so the decision maker cannot be satisfied the proposal is the lesser harm.

An illustrative example. An owner applies for a two-storey side extension that breaches the council's design guidance on the gap to the boundary. The fallback is a single-storey rear extension plus a large outbuilding, both within Part 1 of the General Permitted Development Order 2015. The case is made by obtaining a certificate of lawfulness for the proposed outbuilding first, drawing both options, and showing that the outbuilding would remove more of the rear garden and have a greater effect on the neighbour's outlook than the extension sought. The certificate converts an argument into a fact.

The submission pack

  1. Planning statement with a dedicated fallback section setting out lawfulness, prospect of implementation and the comparison.
  2. Drawings of the fallback to application standard.
  3. A certificate of lawfulness, prior approval, or extant permission documents.
  4. Technical notes assessing the fallback on the same receptors as the proposal.
  5. A signed statement of intent from the applicant and, where relevant, the landowner.
  6. Costings or a programme where deliverability is in question.

Check the local validation list before submission, because the fallback material is supporting evidence rather than a listed requirement, and officers sometimes miss it in an appendix. You can browse the report types to see which technical assessments your particular comparison will need on both sides.

And file the comparison table on the first page of the statement, not the last. An inspector who finds it early reads the rest differently.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that works or a use are lawful. PlanScope produces AI-assisted draft reports for planning applications, and reports should be reviewed before submission. PlanScope does not guarantee planning approval.

Frequently asked questions

What is a fallback position in planning?

It is the lawful development that would be likely to happen if the application were refused, offered as a material consideration in favour of permission because it would cause more harm than the scheme proposed. It is an argument about comparative harm, not a policy test, and it has to be evidenced on both lawfulness and likelihood.

How likely does the fallback have to be?

There must be a real prospect that it would be implemented, rather than a merely theoretical possibility. Once that threshold is passed, the weight given scales with how likely implementation appears. Evidence of commitment matters: costings, drawings, a statement of intent, and confirmation that nothing further is needed to proceed.

Do I need a lawful development certificate for the fallback?

It is not mandatory, but it is the most persuasive evidence available because it removes any argument about whether the alternative is lawful. A certificate under section 191 or 192 of the Town and Country Planning Act 1990 takes time and a fee, so build it into the programme early rather than after refusal.

Can permitted development rights be used as a fallback?

Yes, provided they still exist on the site. Check for conditions on earlier permissions removing them, Article 4 directions, and whether the limits of the class are actually met once the proposal is measured. Many fallback arguments collapse at this point, which is why the certificate route is worth considering.

Why do inspectors reject fallback arguments?

Usually because the alternative is not lawful, because nobody has shown any intention or ability to build it, because it would not meet the applicant's objective so refusal would not lead to it, or because the harm comparison covers only a few receptors and leaves the rest unassessed.

Sources and further reading

fallback positionmaterial considerationspermitted developmentlawful development certificateappealsevidence base

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a vertical farm in a warehouse

A controlled environment vertical farm in an existing warehouse needs permission, and the use class is unsettled. Grid capacity, light spill, plant noise and trade effluent drive the evidence.

Read article →
Which Reports Do I Need7 min read

Reports for a dental practice in a converted house

A house to dental surgery conversion needs full permission for a change of use from Class C3 to Class E(e). Parking demand and plant noise are what actually decide the application.

Read article →
Which Reports Do I Need8 min read

Reports for a parcel locker and courier hub

A last mile courier hub needs transport, noise, drainage and utilities evidence shaped around pre-dawn van departures and fleet charging load, not warehouse trip rates.

Read article →
Which Reports Do I Need7 min read

Reports for a film studio on an industrial estate

There is no use class for a film studio, and standard industrial trip rates do not describe one. The evidence base is noise, lighting, grid capacity and transport, with a fire strategy for undivided stages.

Read article →
Which Reports Do I Need8 min read

Reports for a caravan storage compound on farmland

Storing unoccupied touring caravans on a field is a material change of use. The application is decided by winter visibility of the stored units and by what the hardstanding does to runoff.

Read article →
Which Reports Do I Need8 min read

Reports for a shisha lounge in a parade of shops

A shisha lounge is usually sui generis, and its application turns on a contradiction: the smoke-free definition of substantially enclosed forces an open shelter that amenity policy resists.

Read article →