Fire strategy for a mixed use building at planning stage

6 min readBy PlanScope Editorial Team

A mixed use building's fire strategy is decided by the plan, not by later detailing. Separation between uses, core arrangement and appliance access all have to work before the application goes in.

A mixed use fire strategy planning submission fails for a structural reason far more often than a technical one. The decisions that matter most are made on the plan, and the plan is fixed by the permission. Where the residential escape stair lands, whether the commercial unit sits under habitable rooms, how a kitchen extract duct gets from the ground floor to roof level, where a fire appliance can stand. None of that can be engineered away at building control stage without changing the drawings, and changing the drawings means going back to the council.

So the fire strategy has to be settled while the massing is still soft.

Separating the uses vertically

The basic principle is that a fire in the commercial unit should not threaten the flats above, and that a fire in a flat should not spread laterally or downwards into the commercial unit.

In practice this means a compartment floor between the uses, with every penetration through it treated. Every penetration. Structural connections, drainage stacks, electrical risers, gas supplies, ventilation ducts and the extract from a commercial kitchen. The last of those is the one that reshapes plans, because a kitchen extract duct serving a restaurant has to reach discharge level, has to be fire rated along its route, and has to be accessible for cleaning. Running it up the outside of the building creates an elevation problem. Running it internally takes a shaft out of the residential floor plate on every storey.

Refuse is the same story at smaller scale. Commercial waste, residential waste and recycling need separate stores, and a fire in a bin store is a common ignition source, so those stores want to be separated from escape routes and from the building envelope.

Shared cores and independent escape

Councils and the Health and Safety Executive both look hard at whether the residential occupants can leave without entering the commercial use, and whether firefighters can reach the residential floors the same way.

A single core serving both uses can work, but it generally needs a protected lobby arrangement that separates the two at every level, plus separate final exits. The floor area that takes is real. It is also smaller than the area lost in a redesign at Gateway Two, which is where these arrangements get tested properly.

Height drives the rest. The requirement for second staircases above 18 metres in residential buildings changes the core geometry rather than adding a component, and it interacts with firefighting shafts that already take a substantial bite out of each floor. Below that height, sprinkler provision above 11 metres brings a tank and pump room into the basement or ground floor plan, along with the access needed to maintain it.

Layout decision Fixed by the planning drawings Resolved later
Number and position of escape stairs Yes No
Compartment floor between uses Yes, by the section Construction detail
Riser and duct shaft positions Yes Internal sizing
Fire appliance standing position Yes, by the site plan Signage and markings
Smoke control system type Influenced by core layout Detailed sizing
Sprinkler tank and pump room Yes, by the plan Hydraulic design

Commercial plant and the risk it puts under the flats

Ground floor commercial uses arrive with plant. Refrigeration, air handling, gas-fired catering equipment, laundry, gym machinery, sometimes a generator. Each carries its own fire load and its own failure mode, and each has to be located, ventilated and separated.

Two arrangements cause most trouble. The first is plant at roof level serving a ground floor unit, which requires a service route through the residential building. The second is a gas supply to a commercial kitchen under dwellings, which brings explosion venting and isolation arrangements into the design conversation.

Neither is insurmountable. Both are much easier when the commercial unit's likely tenant is described at application stage rather than left as a blank Class E shell. A permission that says nothing about the intended use produces a fire strategy built on assumptions that the eventual tenant breaks.

Basements make all of this harder. Plant rooms, sprinkler tanks, commercial storage and car parking below ground each need their own escape provision and their own smoke clearance, and a basement car park under flats brings a fire load that has to be separated from the residential core. Where a basement is proposed on a constrained urban site, a Basement Impact Assessment deals with the ground and groundwater questions, and the fire strategy has to be read alongside it rather than after it.

Access for firefighting on a constrained frontage

Urban mixed use sites usually have one frontage, and it is usually busy.

Approved Document B sets out the vehicle access required for firefighting, including minimum road widths, turning provision, clearance heights and carrying capacity, and it requires hardstanding for a pumping appliance within 18 metres of the rising main inlet and within sight of the building entrance. Check the current edition rather than working from memory, because the document has been amended repeatedly.

On the site plan, show the appliance standing position, the route to it, the rising main inlet, the hydrant locations and any gate or bollard on the route. Where the standing position falls on the public highway, the highway authority becomes part of the conversation, and a loading bay or cycle stand in the wrong place can be the thing that stops the scheme.

What the fire statement has to cover

The statement is submitted on the form published by the Secretary of State and it addresses the principles rather than the detail. Site layout, emergency vehicle access, water supplies for firefighting, the approach to escape and evacuation, the construction method and materials in outline, and how the proposals affect surrounding land.

The Fire Statement is a planning document, but the Health and Safety Executive reviews it as a statutory consultee at Planning Gateway One, and an inadequate one delays validation and determination. It is required to be prepared by someone with the necessary fire engineering competence under the framework established by the Building Safety Act 2022 and Article 9A of the Development Management Procedure Order 2015. The same is true of a Fire Safety Strategy prepared to BS 9991 or BS 9999. An AI-assisted draft gives that professional a structured starting point and their own judgement remains legally required.

What is deferred and what is locked

Detailed fire engineering, compartment construction, detection and alarm design, smoke control sizing, sprinkler hydraulics and the fire safety case all belong to the later gateways and to the building regulations process. Nothing in a planning permission settles them.

But the permission locks the geometry. Height, stair count, core position, shaft positions, the compartment line between uses, the appliance standing area and the elevation treatment. If any of those turns out to be wrong at Gateway Two, the fix is a section 73 application or a fresh permission, with the programme cost that implies.

Work the fire strategy alongside the massing study rather than after it. On a mixed use scheme the honest sequence is to sketch the core, the compartment line and the appliance standing position on the first massing option, then test whether the floor area still works. Teams that do it the other way round tend to discover the problem at the point when the drawings have already been issued for planning. For specialist technical reports, qualified professional input may be required. This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When is a fire statement required with a planning application?

Article 9A of the Development Management Procedure Order 2015 requires a fire statement with applications for development involving a relevant building, broadly buildings containing two or more dwellings or educational accommodation that meet the height condition. The statement must be on the form published by the Secretary of State, and the Health and Safety Executive is consulted on it.

Does a commercial ground floor change the fire strategy above it?

It usually does. A restaurant, gym or retail unit brings different fire loads, extract ducts, gas supplies and refuse arrangements, all of which have to be separated from the residential accommodation above. The separation is achieved through compartment floors, protected routes and duct arrangements that occupy space in the plan, so it affects the layout directly.

Can residential and commercial share a single core?

Sharing is possible in some configurations, but the escape routes normally have to be independent, and the fire service needs to reach the residential floors without passing through the commercial use. Where a single core is proposed, expect the arrangement to be questioned. The floor area lost to a second stair or a protected lobby is usually smaller than the cost of redesigning later.

What is left to building control rather than planning?

Detailed fire engineering, compartment construction, alarm and detection design, smoke control sizing and sprinkler design are all matters for the later gateways and for the building regulations process. Planning fixes the things the drawings fix: building height, core positions, escape stair count, service vehicle access and the position of risers and openings.

Who should prepare the fire statement?

Someone with the fire engineering competence to stand behind it. The statement is a planning document but it describes safety-critical design decisions, and the Health and Safety Executive reviews it as a statutory consultee at Planning Gateway One. A draft is a useful starting point for that professional, and it is not a substitute for their judgement.

Sources and further reading

fire statementmixed usegateway onebuilding safety actcompartmentationfire safety

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Fire, Structural and Basements

View all →
Fire, Structural and Basements7 min read

Basement light wells, vaults and the public highway

Planning permission covers what shows. Sections 179 and 180 of the Highways Act 1980 cover the structure under the pavement, and neither answers who owns the ground.

Read article →
Fire, Structural and Basements7 min read

Fire statement content: the matters Article 9A lists

The fire statement is a prescribed form, not a report you structure yourself. Here is what each matter needs at planning stage, and what belongs in the later strategy.

Read article →
Fire, Structural and Basements7 min read

Fire safety strategy and fire statement: which one when

A fire statement shows fire safety has shaped the proposal while the layout can still change. A BS 9991 strategy shows how the building complies with Part B. They are not interchangeable.

Read article →
Fire, Structural and Basements8 min read

Piling near a railway, tunnel or sewer: asset protection

The asset owner's consent sits outside the planning permission. What triggers a separate process, what the agreement covers, and why it is usually the critical path.

Read article →
Fire, Structural and Basements8 min read

Retaining an existing frame: the retrofit appraisal

Where a plan expects reuse before demolition, the appraisal has to quantify capacity, condition and adaptability, and use the same assumptions as the carbon assessment.

Read article →
Fire, Structural and Basements7 min read

Basement under a protected tree: roots and consent

Cellular confinement spreads load above undisturbed roots and does nothing for an excavation. What actually decides whether a basement under a protected tree is possible.

Read article →