Which Reports Do I Need

Evidence base for a block of flats over shops

7 min readBy PlanScope Editorial Team

On a mixed use block you are designing residential amenity around a commercial occupier nobody has met yet. The evidence that matters is whatever fixes the operating envelope.

A vertically mixed block, flats over ground-floor commercial, carries a heavier evidence base than either use would on its own, and the reason is that you are designing residential amenity around an occupier nobody has met yet. A Class E ground floor can be a shop on day one and a gym, nursery or clinic two years later without a further application. The reports that matter, therefore, are the ones that fix the operating envelope: noise, odour, extraction, servicing and fire. Get those agreed and the rest of the pack is ordinary.

Splitting the evidence between the uses

Work out early which documents cover the whole building and which are use-specific, because duplicated assessments with different assumptions are the most common validation problem on mixed schemes.

Whole-building documents: planning statement, design and access statement, drainage, energy, fire, transport, and the daylight and sunlight assessment. Use-specific documents: the noise assessment for plant serving the commercial unit and for sound insulation between uses, the odour and extraction case where any food use is possible, and the retail or economic case where the commercial floorspace crosses a policy threshold.

One instruction saves a lot of pain. Give every consultant the same schedule of areas, the same unit mix, the same assumed commercial use and the same plant strategy, issued as a single document, dated. Where the commercial use is unknown, state the worst-case assumption they must all work to.

Noise and odour from the units below

This is where mixed schemes are refused. Two mechanisms are in play and they need separate treatment.

Sound insulation between the commercial unit and the flats above is a design matter: floor construction, isolated ceilings, and the avoidance of any rigid connection carrying structure-borne sound. Set internal target levels for the flats using the guideline values in BS 8233:2014 and state them in the Noise Impact Assessment alongside the construction detail that achieves them.

Plant noise is an assessment matter, measured and predicted to BS 4142:2014+A1:2019, with the rating level compared against the measured background at the nearest window of the flats above and next door. Where the commercial occupier is unknown, assess a defined plant envelope, a maximum sound power level at specified locations, and secure it by condition. That gives the future occupier a design limit rather than a negotiation.

Odour is the third strand, and it applies whenever a hot food use is possible within the Class E envelope. An Odour Assessment should set the kitchen extract route to terminate at high level above the roof, with the abatement specified against the risk of the cooking type, and the duct route drawn on the architectural sections rather than described in words. Retro-fitting a duct through completed flats is not possible, so the riser has to be built in whether or not the first tenant needs it.

The agent of change principle cuts both ways here. Where an existing noisy use is nearby, your residential scheme carries the mitigation burden. Where you are introducing the commercial unit, you are the agent of change for the flats you are also building, and the council will expect the controls to sit on the commercial unit.

Separate refuse, servicing and cycle storage

Councils want the two uses kept apart operationally, and they say so in conditions.

  • Separate refuse stores, sized for the commercial waste stream and the residential stream, with commercial waste contracted privately and residential collected by the authority.
  • Storage positioned within the carry distances the collection authority accepts, and the Building Regulations guidance on refuse storage in Approved Document H gives the distances from dwelling to store and store to collection point.
  • A servicing and delivery arrangement that states where a delivery vehicle stops, for how long, and at what hours, with a swept path drawing where the vehicle has to enter the site.
  • Long-stay cycle parking for residents in a secure store at ground level, short-stay for visitors and customers near the entrance, with the numbers taken from the adopted standard.
  • Separate entrances and cores, so that residents do not pass through a commercial servicing area.

Grease management for a food use belongs here too. A grease trap and its maintenance access affect the drainage layout and the sewerage undertaker's consent to connect.

Daylight to flats above an active frontage

Deep commercial floorplates push the residential accommodation upwards and often to the back, and that creates two daylight problems.

The first is at the lowest residential level, where the floor above a double-height shopfront sits close to the opposite building and receives a restricted vertical sky component. The second is in deep single-aspect flats, where the room at the back of the plan fails on no-sky line even with generous glazing. Assess both against BRE 209 (2022) in a Daylight and Sunlight Assessment, and report the results room by room rather than as a scheme average.

Where a room fails, the honest options are to change the plan, to reduce the depth, or to argue the case on the basis of the urban context with the numbers stated. Officers accept context arguments in town centres. They do not accept an assessment that reports only the rooms that pass.

Fire strategy for mixed occupancy

Mixed use changes the fire position because two different occupancy types share a structure and sometimes a core.

If the building reaches the height at which Planning Gateway One applies, a Fire Statement is required with the application under Article 9A of the Development Management Procedure Order 2015, and the Health and Safety Executive is a statutory consultee. This is one of the report types where fire-engineering competence is legally required under the Building Safety Act 2022 framework: an AI-assisted draft can structure the document, and the assessment must come from a competent fire engineer.

Below that threshold, the fire strategy still drives the design: separation between the commercial unit and the residential means of escape, access for firefighting appliances, sprinkler provision, and the route of any commercial extract duct through residential compartments. The duct is the detail that catches schemes out, because fire separation and odour dispersal pull in opposite directions.

Parking, drainage and utilities for two uses

A car-free residential scheme in a town centre is usually acceptable where public transport accessibility supports it and the permit-free position is secured by obligation. The commercial unit is a different argument: it needs servicing, and sometimes a disabled bay and a short-stay loading provision, which officers treat as functional rather than optional.

Drainage and utilities need doubling up on paper. Separate water meters and supplies, separate foul connections where a food use is possible, attenuation sized for the whole roof and any hardstanding, and a utilities position that includes the electrical load of commercial plant. Where the sewerage undertaker's network is constrained, the connection enquiry needs to go in before the application, not after permission.

The same evidence-base logic applies to purely residential brownfield schemes, and the comparison is set out in the note on which reports a 12-flat brownfield scheme needs.

Conditions that control the commercial operation

Ask for the conditions you can live with, drafted in your own words, rather than waiting for the officer's version.

  1. Hours of opening and hours of deliveries, separately stated.
  2. A plant noise limit expressed as a rating level relative to background at a defined receptor.
  3. Extraction and odour abatement to an approved scheme, with the duct terminating at the approved point.
  4. A servicing and delivery management plan.
  5. A restriction on specified uses within Class E where the evidence does not support them, which needs justification rather than being assumed.
  6. Sound insulation between uses to stated performance values, tested before occupation.

Illustrative example: a five-storey block with 11 flats over a 180 m² unit. The approved scheme carried a kitchen extract riser to roof level, a ceiling isolated from the structural slab, a plant noise limit set 5 dB below measured night-time background, separate bin stores either side of the entrance passage, and hours of delivery restricted to 07:00 to 19:00.

Browse the 66 report types on PlanScope to see how the residential and commercial documents for a mixed use block fit together, or enter your postcode there to check the constraints on your site.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which documents cover the whole building and which are use-specific?

Planning statement, design and access statement, drainage, energy, fire, transport and daylight cover the whole building. Use-specific documents are the plant noise and sound insulation assessment, the odour and extraction case for any possible food use, and any retail or economic assessment triggered by the commercial floorspace.

How do you assess noise when the commercial tenant is unknown?

Assess a defined plant envelope rather than a specific installation: a maximum sound power level at stated locations, predicted to BS 4142:2014+A1:2019 against measured background at the nearest residential window, then secure it by condition. The future occupier then designs to a limit instead of negotiating one after completion.

Do I need a kitchen extract duct if the unit is not a restaurant?

If the ground floor is Class E, a hot food use may be possible later without a further application, and a duct cannot be retro-fitted through completed flats. Building the riser to roof level at construction stage is the practical answer, with the abatement specified when the use is known.

When does a Fire Statement have to be submitted?

Where Planning Gateway One applies to the building, a Fire Statement is required with the application under Article 9A of the Development Management Procedure Order 2015, and the Health and Safety Executive is a statutory consultee. Fire-engineering competence is legally required for that document under the Building Safety Act 2022 framework.

Can a mixed use scheme be car free?

The residential element often can be, where public transport accessibility supports it and a permit-free position is secured by obligation. The commercial unit is treated differently because it needs servicing, and officers usually regard a loading provision and a disabled bay as functional requirements rather than optional extras.

Sources and further reading

mixed useflats over shopsnoiseodourfire statementevidence base

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Document bundle for a holiday let change of use

Short-term letting may or may not be a material change of use. Where it is, the bundle runs on a Planning Statement, proof of the existing lawful use and a management plan officers can condition.

Read article →
Which Reports Do I Need7 min read

Document bundle for a dropped kerb and off street parking

A driveway needs a crossover licence from the highway authority and, depending on the road class and the surfacing, a planning application too. Here is the evidence each one wants.

Read article →
Which Reports Do I Need7 min read

Document bundle for a self-contained annexe in a garden

Whether a garden annexe is ancillary accommodation or a new dwelling decides the application type, the drawings and the fee. Here is the evidence that settles it and the document pack that follows.

Read article →
Which Reports Do I Need7 min read

Documents for a retail unit above the impact threshold

The sequential test has no threshold. The impact assessment has one, set locally or defaulting to 2,500 square metres. Here is what each document has to contain.

Read article →
Which Reports Do I Need7 min read

Documents for a new access onto a classified road

There is no permitted development route onto an A, B or C road. Here is the evidence the highway authority expects, and the separate consents that follow permission.

Read article →
Which Reports Do I Need6 min read

Document bundle for stables and an equestrian arena

Keeping horses for riding or livery falls outside the agricultural definition, so Part 6 rights do not help. Here is the bundle a stables and arena application actually needs.

Read article →