Rural and Agricultural

Forestry permitted development and what it allows

6 min readBy PlanScope Editorial Team

Forestry permitted development covers buildings and tracks reasonably necessary for forestry, subject to height limits and prior notification. It never permits a dwelling and it says nothing about felling.

Forestry permitted development rights sit in Part 6 of Schedule 2 to the General Permitted Development Order 2015, and they allow rather less than woodland owners expect. Class E permits buildings, private ways and certain operations on land used for forestry where they are reasonably necessary for that purpose, subject to height and distance limits, an outright bar on dwellings, and a prior notification procedure that gives the council a say on siting, design and construction. It does not touch felling, which is a separate regime entirely.

What counts as forestry for these purposes

The Order does not define forestry, and that absence does most of the work in disputed cases. The ordinary meaning is the growing and management of trees, including afforestation, as an undertaking rather than as an incident of owning some woodland.

The test attached to the right is that the development must be reasonably necessary for the purposes of forestry on that land. It is an objective test. What the owner intends is relevant evidence, though it is not conclusive, and a building that would suit a forestry business of the size actually being carried on is easier to defend than one sized for an aspiration.

And councils ask for evidence, rightly. A woodland management plan, a Forestry Commission grant agreement, felling and restocking records, timber sales and machinery inventories all establish that an undertaking exists.

Buildings and structures permitted

Class E permits the erection, extension or alteration of a building, together with operations to obtain materials needed for the permitted works, and other operations reasonably necessary for forestry.

Limitation Effect
Dwellings Never permitted under this class
Height within 3 kilometres of the perimeter of an aerodrome Limited to 3 metres
Height elsewhere Limited to 12 metres
Proximity to a trunk or classified road Not permitted within 25 metres of the metalled carriageway
Prior notification Required for siting, design and external appearance of a building

Check the current consolidated text of Part 6 before relying on any of these figures, since the Order is amended frequently and older summaries circulate widely.

The dwelling bar is absolute and it catches the most common ambition, which is a house for someone to live on the holding. A forestry worker's dwelling needs a full planning application judged against the policy on rural workers' dwellings, with functional and financial evidence. It cannot be reached through Part 6.

Tracks and their notification requirements

Private ways are the other main use of the class, and they matter because extraction routes determine whether a woodland can be worked at all.

The right covers the formation, alteration and maintenance of private ways on forestry land. Prior notification covers the siting and the means of construction, which means the council can influence the route, the surfacing, the drainage and the crossings before work begins.

That is where most of the argument happens. A track running along a watercourse, crossing a public right of way, or cutting into a slope visible from a designated landscape will attract conditions or a requirement for a full application. Where the track joins the public highway, visibility splays and the geometry of the junction become a highway matter regardless of the forestry right, and the evidence expected is the same as that described under farm access and rural road visibility.

Give the authority a proper submission at notification stage: a plan showing the route at an appropriate scale, a typical cross section, drainage and crossing details, the materials, and a note on construction sequence. A notification with a red line and a sentence invites a requirement for prior approval and a longer process.

Exclusions in protected landscapes and on designated sites

Rights are restricted on land in a National Park, a National Landscape, a conservation area or the Broads, and the restrictions differ between classes, so read the article 2(3) provisions carefully rather than assuming the class applies unaltered.

Designated sites bring separate consents. Operations on a site of special scientific interest need Natural England's assent regardless of permitted development rights, and a scheme affecting a European site engages the habitats regulations. Permitted development does not override any of that.

Ancient woodland deserves its own line. National policy treats it and veteran trees as irreplaceable habitat, and development causing loss or deterioration should be refused other than in wholly exceptional circumstances with a suitable compensation strategy. A track driven through ancient woodland under a claimed permitted development right is the sort of thing that generates an enforcement notice and a restocking notice together.

Where the woodland is likely to hold roosting bats or nesting birds, seasonal constraints bite as they do on any other site, and the sequencing set out for barn conversion bat surveys applies to buildings in woodland just as much.

Felling licences as a separate regime

This is the point that causes most trouble. Permitted development rights deal with buildings, tracks and operations. They say nothing about cutting down trees.

Felling is controlled by the Forestry Act 1967, which requires a licence from the Forestry Commission subject to exemptions, including a quarterly volume allowance. Clearing a route for a permitted track can itself require a felling licence, and the two approvals run on different timetables with different decision makers.

There is a third regime as well. Certain forestry projects, including afforestation, deforestation, forest road works and forest quarries above stated thresholds, require consent from the Forestry Commission under separate environmental assessment regulations for forestry. Check whether your project crosses those thresholds before treating the planning position as the whole answer.

Landscape and visual considerations

A forestry building at 12 metres is a substantial structure, and in open or elevated country it reads for miles. Even where the right applies, the prior notification of siting, design and external appearance gives the authority a lever on colour, cladding, position against the treeline and the cut and fill required to level a platform.

Site the building against existing woodland rather than in a clearing, use dark recessive finishes, and keep earthworks visible from public viewpoints to a minimum. Where the woodland sits in a designated landscape, a short Landscape and Visual Impact Assessment at notification stage usually costs less than the argument it prevents.

Evidence of the forestry undertaking

Assemble the file before you notify. Councils are alert to permitted development used as a route to something else, and a thin submission invites scrutiny of the whole undertaking.

  1. A woodland management plan covering the land, ideally one approved under a Forestry Commission scheme.
  2. Records of work done: planting, thinning, felling, restocking, deer management and ride maintenance.
  3. Evidence of output, whether timber sales, firewood, or grant income.
  4. A statement explaining why the building or track is reasonably necessary for the forestry operation at its actual scale.
  5. Plans and sections at a scale the officer can measure.

A wider survey of what the rights do and do not permit is set out under forestry operations and permitted development, which covers the ground either side of this one.

PlanScope drafts the supporting documents for rural and forestry applications from your answers and the constraint data it checks at the postcode. Browse the report types to see which ones a woodland site is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority, the Forestry Commission or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I build a house on forestry land under permitted development?

No. The forestry class in Part 6 of Schedule 2 to the General Permitted Development Order 2015 excludes dwellings outright. A forestry worker's dwelling needs a full planning application assessed against rural workers' dwelling policy, with functional and financial evidence about the undertaking. There is no route to a house through permitted development rights on forestry land.

What are the height limits for a forestry building?

Broadly 12 metres, reduced to 3 metres where the building is within 3 kilometres of the perimeter of an aerodrome, and nothing is permitted within 25 metres of the metalled carriageway of a trunk or classified road. Check the current consolidated text of Part 6 before relying on those figures, because the Order is amended frequently.

Do forestry tracks need prior notification?

Yes. The right covers the formation, alteration and maintenance of private ways, but the siting and means of construction are subject to prior notification, so the council can influence the route, surfacing, drainage and watercourse crossings. Submit a plan at a usable scale, a typical cross section and construction details rather than a red line and a sentence.

Does permitted development allow me to fell trees?

No. Felling is controlled separately by the Forestry Act 1967, which requires a licence from the Forestry Commission subject to exemptions including a quarterly volume allowance. Clearing a route for a permitted track can itself need a felling licence. Certain forestry projects also need consent under separate environmental assessment regulations for forestry.

What evidence shows a forestry undertaking exists?

A woodland management plan, ideally approved under a Forestry Commission scheme, plus records of planting, thinning, felling, restocking and ride maintenance, evidence of output such as timber or firewood sales or grant income, and a statement explaining why the building or track is reasonably necessary at the scale of operation actually carried on.

Sources and further reading

forestrypermitted developmentgpdo part 6woodlandfelling licencerural

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Rural and Agricultural

View all →
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →