Commercial Occupiers

Funeral directors and the use class question

7 min readBy PlanScope Editorial Team

Funeral directors lost their express listing when Class E was created. The use usually falls inside Class E, though preparation facilities, extraction and service access decide what you actually have to apply for.

A funeral director looking for premises usually finds that funeral directors planning permission is needed for the works rather than for the use, but the use question is the one that catches people out. Before the 2020 reorganisation of the Use Classes Order, funeral directors were named expressly in Class A1 alongside shops and hairdressers. That list disappeared when Class E was created. The use now sits inside Class E on almost any reading, which means a move into a former shop, bank or office is often not development at all, but the preparation and mortuary side of the business can push the premises outside the class altogether.

That is the fault line. Everything else follows from which side of it the premises falls.

Which class a funeral director falls into

Class E of the Use Classes Order covers commercial, business and service uses. The limbs that matter here are E(a), the retail sale of goods other than hot food to visiting members of the public, and E(c)(iii), any other service which it is appropriate to provide in a commercial, business or service locality. A high street funeral director with an arrangement room, an office and a small display sits comfortably inside one or the other.

Article 3 of the Order means a change from one use in Class E to another use in the same class is not development, so no application is needed for the use itself. Moving into a former estate agency or optician's is therefore usually free of a planning application, and the argument moves to shopfront alterations, signage and any physical works.

Where the premises includes a mortuary with preparation and embalming facilities, particularly one serving other branches, some authorities treat the whole as a mixed use or as sui generis, on the basis that the preparation function is not a service provided to visiting members of the public. There is no national answer to that. The practical route is to describe the operation honestly at pre-application and, if certainty matters, apply for a certificate of lawfulness of a proposed use under section 192 of the Town and Country Planning Act 1990.

Mortuary and preparation facilities

Three technical points come with a preparation room, and none of them is about planning policy.

Drainage from a preparation room is trade effluent. A consent from the sewerage undertaker under the Water Industry Act 1991 is a separate regime from planning, and the undertaker will want to know about volumes, chemicals and any interceptor. Start that conversation before the layout is fixed, because an interceptor needs floor space and access.

Ventilation is the second. Formaldehyde and other preparation chemicals are a workplace exposure issue under health and safety law, and the extract has to terminate somewhere. In a terraced high street unit that usually means a duct up the rear elevation, which is an external alteration and needs permission where the building is in a conservation area or the works affect the appearance of the building. A Ventilation and Extraction Statement setting out the duct route, termination height and discharge velocity answers most of the officer's questions in one document.

Refrigeration is the third. Chillers and condensers are plant, they run at night, and in a mixed use building with flats above they are the most likely source of a noise objection. A Noise Impact Assessment using the BS 4142 method, comparing the rating level of the plant with the background sound level at the nearest noise sensitive facade, is the evidence that settles it. Councils usually expect a suitably qualified author for that work and professional review is strongly advised.

Hearse parking and service access

Service vehicle movements are what distinguish a funeral director from the shop that was there before. A hearse needs a level, unobstructed route from the highway to the coffin loading point, and that route needs to work without reversing onto a busy frontage. Private ambulance arrivals happen at unpredictable hours, including at night.

Officers look for four things on the drawing:

  • A rear or side service access, or a demonstrated on-street loading arrangement that does not obstruct a bus route or a cycle lane.
  • A loading point screened from public view, which is a genuine amenity consideration rather than a matter of taste.
  • Swept paths for the longest vehicle that will attend, since a hearse and a following limousine are longer than a car.
  • Parking for staff and for families attending arrangements, assessed against the local parking standards.

A short Transport Statement covering existing and proposed vehicle movements is usually enough at this scale. Where the frontage road is heavily trafficked, a swept path drawing carries more weight than any amount of narrative.

Chapel of rest and gatherings

A chapel of rest used by visiting families is ancillary to the main use and rarely changes the class. Services or committals held on the premises, with mourners gathering in numbers, are a different matter, because assembly by a congregation reads as a Class F1 or F2 use, or in some readings sui generis. The distinction is whether the gathering is incidental to the arrangement of funerals or is itself an activity the premises is used for.

Two facts decide it in practice: how many people attend, and whether the room is used for services when there is no arrangement appointment. Set both out in the application description rather than leaving the officer to guess, and expect a condition limiting capacity or hours if the room is close to homes.

Frontage treatment and conservation areas

A funeral director's frontage tends towards dark paint, obscured or blinded glazing and discreet lettering. That instinct collides with local plan policies on active frontages, which want display windows and visibility into the unit at ground floor level.

In a conservation area or on a listed building the argument sharpens. Obscuring a historic shopfront, removing a stallriser or fitting an internally illuminated fascia will usually need permission, and on a listed building it will need listed building consent as well. A Heritage Statement identifying the significance of the shopfront and explaining the effect of the proposed changes is the document that carries that case. Illuminated signs need advertisement consent in their own right, which is a separate application from the change of use.

There is a workable compromise most officers accept: retain the glazing, set a display behind it at a depth that gives privacy, and use interior blinds rather than painting or filming the glass.

Neighbour concerns and how they are weighed

Objections to funeral directors often mix two things. Public distaste at the nature of the business carries little weight, because it is not an effect on the use of land. Amenity and highway effects carry real weight: plant noise at night, vehicle movements on a narrow street, loss of an active shopfront in a designated frontage, and odour if extraction is poorly designed.

Separating the two in your own submission helps. Answer the amenity and highway points with evidence, and let the officer deal with the rest. The same discipline applies to sui generis arguments generally, as the treatment of tattoo studios, barbers and sui generis use shows, and the limits of internal Class E flexibility are covered in Class E change of use inside the class.

Evidence to submit

  1. A description of the operation covering arrangement appointments, preparation on site or off site, whether services are held, and expected vehicle movements by time of day.
  2. Existing and proposed floor plans showing the preparation room, chiller position, chapel of rest and staff areas.
  3. Elevations showing the duct route, any flue termination and all signage.
  4. Plant noise information from the equipment schedules, with a BS 4142 assessment where flats or houses are nearby.
  5. A swept path drawing for the service access.
  6. Confirmation that a trade effluent consent has been applied for, where a preparation room is proposed.

Ask environmental health for comments before you apply. On this use type, the officer who signs off the extraction and the plant noise is usually the one whose comments decide the outcome.

Browse all 66 report types on PlanScope and start a draft for your change of use.

This article is general guidance, not legal advice. Use class questions turn on the facts of each case, so check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do funeral directors need planning permission to move into a former shop?

Often not for the use itself. A shop and a funeral director both fall within Class E of the Use Classes Order, and Article 3 of that Order means a change between uses in the same class is not development. Permission is still needed for external alterations, extraction ducts, illuminated signage and any works affecting a listed building.

Which use class is a funeral director in?

Class E, on almost any reading, either as E(a) retail sale of goods to visiting members of the public or as E(c)(iii), another service appropriate in a commercial, business or service locality. The express listing in old Class A1 disappeared in the 2020 reorganisation. A mortuary serving other branches may take the premises outside Class E.

Does a mortuary need separate consent?

Planning treatment varies by authority, and some treat preparation facilities as a mixed or sui generis use rather than part of Class E. Separately, drainage from a preparation room is trade effluent and needs consent from the sewerage undertaker under the Water Industry Act 1991. Ventilation is also controlled under health and safety law, independently of planning.

Can neighbours object because they find the use upsetting?

They can object, but distaste at the nature of a business is not an effect on the use of land and carries little weight. Effects that do carry weight include plant noise at night, vehicle movements on a narrow street, odour from poorly designed extraction and the loss of an active shopfront in a designated frontage.

What signage can a funeral director put up?

Non-illuminated fascia lettering within the limits of the advertisement regulations is often deemed consent, but internally illuminated signs and projecting signs usually need advertisement consent. In a conservation area the limits are tighter, and on a listed building listed building consent may also be needed. Check the position with the council before ordering the sign.

Sources and further reading

funeral directorsuse classesclass echange of useextractioncommercial planning

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Hours of opening conditions and how to negotiate them

An hours condition is easier to shape before it is imposed than to vary afterwards. Here is the evidence that supports longer hours, how to split customer and delivery restrictions, and what varying an existing condition involves.

Read article →
Commercial Occupiers7 min read

Planning a pharmacy alongside a medical practice

Retail and health services both sit inside Class E, so a pharmacy opening in a shop unit or alongside a surgery usually needs no change of use permission. The consents that do bite are parking, hours, extraction and signage.

Read article →
Commercial Occupiers7 min read

Change of use to a light industrial unit near homes

Light industry sits inside Class E only where the process could be carried out in a residential area without detriment to amenity. That wording, not the machinery, decides whether your unit needs permission.

Read article →
Commercial Occupiers6 min read

Change of use to an amusement arcade or betting shop

Amusement arcades and betting offices sit outside every use class, so a change of use always needs planning permission. The decision usually turns on frontage policy, clustering and noise rather than on the gambling itself.

Read article →
Commercial Occupiers7 min read

Planning a barber, nail bar or beauty salon

Most personal care uses now sit inside Class E, so the use rarely needs permission. Extraction, waste and registration are where the work is.

Read article →
Commercial Occupiers7 min read

Mobile catering on private land and the 28-day rule

Part 4 Class B allows temporary use of land for 28 days a year. It does not apply inside the curtilage of a building, which rules out most car parks.

Read article →