Geotechnical assessment at planning application stage

6 min readBy PlanScope Editorial Team

At application stage the authority wants feasibility and risk, not foundation design. The desk study sources, the investigation phasing that keeps cost down, and the conditions to expect.

A geotechnical assessment planning stage report answers a narrower question than the ground investigation that follows it. The authority is not asking you to design foundations. It wants to know that the ground conditions are understood well enough for the proposed development to be feasible, that any ground related constraint has been identified, and that nothing about the ground will make the approved scheme impossible to build without changing what was permitted.

That distinction saves money. A full intrusive investigation to Eurocode 7 standards costs considerably more than a desk study with targeted sampling, and on most sites the planning application needs the second, with the first secured by condition.

What the planning stage assessment covers

The scope at application stage is usually a desk study, a site walkover, a preliminary ground model, and an opinion on feasibility and risk. Where the desk study flags a specific hazard, a limited intrusive phase may be needed before determination rather than after.

Four questions drive the content. Will the proposed foundations work in the expected strata. Is there a stability issue, from slopes, retaining structures, mine workings or soluble ground. Are there ground related constraints on the layout, such as areas that cannot be built on or basement depths that cannot be achieved. And does the ground interact with another discipline, usually contamination, drainage or trees.

Answer those four and the report has done its job. A Geotechnical Assessment prepared on that basis gives the officer enough to condition the detail.

Desk study sources before anyone digs

The desk study is where the value is, and the sources are largely public.

  • Geological mapping and the national borehole record, which often holds logs from neighbouring sites.
  • Historical mapping across several editions, which reveals quarries, ponds, infilled ground, railway cuttings and former industrial use.
  • Coal mining records where the site falls in a referral area, and records of other mineral extraction.
  • Groundwater and surface water data, including the position of source protection zones.
  • Radon potential data for the locality.
  • Previous site investigation reports for the site or its neighbours, often held by the council from earlier applications.
  • Aerial photography, which shows made ground, tipping and drainage patterns that maps omit.

Ask the local authority what it holds. Contaminated land officers keep reports submitted with earlier applications, and a borehole log from the plot next door is worth more than any amount of inference.

The walkover is not optional. Slope angles, seepage, ground heave, cracked boundary walls, vegetation indicating wet ground and evidence of previous filling are all visible, and none of them appear in a data search.

Phasing the investigation sensibly

The sequence that works, and the sequence authorities expect, runs from the general to the specific.

  1. Desk study and walkover, producing a preliminary ground model and a risk register.
  2. Targeted intrusive work before determination only where a hazard could change the scheme outright.
  3. Full ground investigation after permission, designed against the approved layout and secured by condition.
  4. Foundation and retaining structure design, with validation and verification reporting.

Stage two is the judgement call. Where the desk study suggests shallow mine workings, a deep infilled feature, or slope instability that could sterilise part of the site, an authority will reasonably want evidence before granting permission, because the alternative is a permission that cannot be built. Where the risk is ordinary variable ground, a condition is the proportionate answer.

Combine investigations wherever you can. The same boreholes can serve geotechnical, contamination and infiltration testing if the scope is written that way, and three separate mobilisations cost far more than one.

Foundations and the planning consequences

Foundation choice is usually a design matter, but it becomes a planning matter when it changes what gets built or what gets harmed.

Ground issue Foundation response Planning consequence
Shrinkable clay with nearby trees Deeper strip or piled foundations Tree protection and layout constraints
Shallow made ground over competent strata Piled or deep trench fill Vibration and noise during construction
Mine workings or voids Grouting, then conventional foundations Phasing, and sometimes a no build zone
Soft alluvium at depth Piles with ground improvement Settlement monitoring of neighbours
Steep slope Retaining structures, terracing Levels, visual effect, land take

Piling is the response that most often attracts a condition, both because of construction effects and because piles can create a pathway through a low permeability layer into groundwater beneath. On a site with any contamination history, expect a requirement for a piling method statement and risk assessment to be approved before that work starts.

Trees and clay deserve a mention together. Where a scheme puts foundations near retained trees in shrinkable soil, the depth needed for the foundation and the root protection area needed for the tree can conflict directly, and the resolution belongs at layout stage. The note on temporary works and tree protection on tight sites covers how that plays out during construction.

Slope stability and retaining structures

Sites on slopes need a stability opinion at application stage, not a calculation. The officer wants to know whether the proposed cut and fill is achievable, whether the retaining structures are of a scale the design can absorb, and whether anything is being proposed that would destabilise land in other ownership.

Three points recur. Temporary works during construction are often more demanding than the permanent condition, which is why a method statement is conditioned. Surface water management affects stability, so the drainage and geotechnical work have to agree with each other. And land in third party ownership above or below the site constrains what can be done, since you cannot rely on a slope you do not control.

In London, basement schemes have their own regime, and many boroughs require a Basement Impact Assessment covering hydrogeology, ground movement and structural stability to a prescribed structure. That is a more demanding document than a general geotechnical opinion.

Where geotechnics meets contamination and drainage

The three disciplines share the same holes in the ground and often the same consultant, which is efficient as long as the reporting stays clear about which standard each part follows.

Contamination assessment follows its own framework, with a conceptual site model, a preliminary risk assessment and, where needed, intrusive investigation and remediation strategy. That is the territory of a contaminated land assessment, and the local planning authority expects it to be prepared by suitably qualified and experienced persons.

Drainage depends on infiltration testing, which is a geotechnical measurement. Soakaway feasibility, groundwater levels and the seasonal variation in those levels all come from the ground investigation, and a drainage strategy built on an assumed infiltration rate is the most common cause of a drainage condition that cannot be discharged. Where asbestos or other hazardous material is suspected in made ground, that also shapes the demolition sequence, as set out in the note on demolition asbestos surveys and the planning submission.

What the authority is likely to condition

Expect conditions requiring a scheme of ground investigation to be submitted and approved, remediation and verification where contamination is present, a piling method statement and risk assessment where piles are proposed, approval of foundation and retaining wall details where stability is in issue, and a watching brief for unexpected ground conditions.

Read the condition wording before you price the work. A condition requiring approval of an investigation scheme before any development begins puts the investigation on the critical path, and discharging it takes its own determination period.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and ground investigation, stability assessment and foundation design are engineering work that a draft cannot replace.

Frequently asked questions

Do I need a ground investigation before submitting a planning application?

Usually not a full one. A desk study, walkover and preliminary ground model are normally enough, with the detailed investigation secured by condition. Targeted intrusive work before determination is justified where a hazard such as shallow mine workings or slope instability could make the proposed scheme undeliverable.

What should a desk study include?

Geological mapping, the national borehole record, several editions of historical mapping, mining records where relevant, groundwater and source protection data, radon potential, any previous investigation reports held by the council, and aerial photography. A site walkover is part of it, since seepage, heave and filling are visible on the ground.

Why does the council condition a piling method statement?

Because piling can drive a pathway through a low permeability layer into groundwater, and because of construction noise and vibration. On any site with a contamination history, expect a requirement for a piling risk assessment and method statement to be approved before that element of the work starts.

Can one investigation cover geotechnics, contamination and drainage?

Yes, if the scope is written that way from the start. The same boreholes and trial pits can serve foundation design, contamination sampling and infiltration testing. Three separate mobilisations cost far more, and a drainage strategy built on an assumed infiltration rate often cannot be discharged later.

What is different about a basement scheme?

Many London boroughs require a basement impact assessment covering hydrogeology, ground movement and structural stability to a prescribed structure, usually with independent audit. That is a more demanding document than a general geotechnical opinion and should be scoped at the outset rather than added later.

Sources and further reading

geotechnicalground investigationfoundationspilingbasementsconditions

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Fire, Structural and Basements

View all →
Fire, Structural and Basements6 min read

External wall information at Planning Gateway One

The planning-stage question on external walls is narrower than full compliance: can the building as drawn be built within the restrictions that apply to it. What to state, and how to keep conditions workable.

Read article →
Fire, Structural and Basements7 min read

Sequencing site investigation before an application

Ground investigation after the design is fixed tells you what went wrong. The order that works, what the desk study should assemble, and why monitoring sets the submission date.

Read article →
Fire, Structural and Basements7 min read

Geotechnical assessment and Eurocode 7 in planning

Planning needs feasibility and risk, not a finished foundation design. How Eurocode 7 and BS 5930 shape the investigation, and how to split the deliverables between planning and construction.

Read article →
Fire, Structural and Basements8 min read

Party wall and planning overlap for basement works

Planning permission does not authorise excavation next to a neighbour, and a party wall award does not authorise development. On a basement the notice periods are fixed by statute and usually decide the programme.

Read article →
Fire, Structural and Basements7 min read

Common basement policy restrictions in London boroughs

London basement schemes are governed by the borough's adopted local plan rather than national policy. The limits on depth, garden coverage and light wells follow a consistent pattern even though the numbers differ.

Read article →
Fire, Structural and Basements7 min read

Fire Statement for a change of use application

Converting an office block over 18m into flats creates a relevant building and triggers the article 9A Fire Statement requirement, even with no external alteration. The fire issues on a conversion are inherited rather than designed.

Read article →