Getting an AI-assisted draft reviewed and signed off
A reviewer needs the site evidence the draft could not contain. Here is what to send, how to scope the instruction, and which reports need a licensed author by law.
A professional review of an AI-assisted draft is not proofreading. The reviewer is being asked to put their name and their competence behind a document that a council will rely on, so what they need from you is the site evidence the draft could not contain. Send a professional review ai draft report instruction with the survey data, the drawings and the constraints attached, and the review is useful. Send the draft on its own and you will get it back with questions rather than a signature.
PlanScope drafts are built to be reviewed. They cite policy, follow the structure a council expects, and insert a TO BE CONFIRMED flag wherever a site-specific fact is missing instead of inventing one. Those flags are the reviewer's worklist.
What a reviewer needs from you
Assemble a single package. A reviewer who has to chase four attachments across three emails will charge for the chasing.
- The draft report itself, with the TO BE CONFIRMED flags left in place
- The application drawings, numbered and dated, that the report describes
- Any survey data: ground investigation, ecology, noise measurements, levels, tree survey
- The site constraints you know about: flood zone, designations, Article 4 directions, trees
- The council's local validation list for the application type
- The application description you intend to use
- Your programme, including the date you intend to submit
Then say what you want reviewed. A reviewer asked to "check this over" will either over-scope and bill accordingly, or skim it. A reviewer asked to confirm the methodology, verify the policy references against the current edition and complete the flagged items will do exactly that.
Report types where review is legally required
For some report types a licensed or competent professional is required by law, and the AI-assisted draft is a starting point for that professional rather than a substitute for them. That applies to:
| Report type | Requirement |
|---|---|
| Environmental Impact Assessment | Environmental Statement prepared by competent experts under the EIA Regulations 2017 |
| Protected Species Survey | Suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the Habitats Regulations 2017 |
| Biodiversity Net Gain Assessment | Statutory metric completed by a competent person under the Environment Act 2021 regime |
| Land Contamination Phase 1 and Phase 2 | Suitably qualified and experienced persons, reports to BS 10175 |
| Fire Statement | Fire-engineering competence, Planning Gateway One under the Building Safety Act 2022 framework |
| Fire Safety Strategy | A BS 9991 or BS 9999 strategy is a fire-engineering document |
For these, do not treat the review as a tidy-up at the end. Involve the professional before the survey work is specified, because the thing they will most often reject is a methodology that was never going to produce the evidence needed.
Where review is strongly advised
A second group is labelled professional recommended rather than required. Councils usually expect a suitably qualified author, and professional review is strongly advised: Preliminary Ecological Appraisal, Arboricultural Impact Assessment, Air Quality Assessment, Noise Impact Assessment, Transport Assessment, Viability Assessment, BREEAM Pre-Assessment, Basement Impact Assessment and Historic Building Recording among others.
The practical test is whether the document contains a professional judgement that a council officer will weigh against their own specialist's view. If it does, get it reviewed. A Planning Statement or a Design and Access Statement on a householder scheme usually does not need that, and a Transport Assessment on a 60 unit scheme always does.
Who is competent for which document is not always obvious, and who can prepare a health impact assessment shows how varied the answer can be.
Scope of a review instruction
Write the instruction in five lines:
- The document, its version number and the date
- What the reviewer is asked to confirm, listed specifically
- What is out of scope, so the fee is predictable
- What the output should be: marked-up document, a comments schedule, or a signed version
- The deadline, and what happens if the reviewer disagrees with a conclusion
That fourth point decides whether the review is usable. A marked-up PDF with comments is fine for an internal check. For submission, you want either a document the reviewer is content to be named in, or a separate review note you can submit alongside it.
PlanScope includes a review request flow and a sign-off portal, with requests moving through the statuses sent, accepted, in review, changes requested, signed off, rejected and expired. You can also instruct your own reviewer directly. Either way, the status that matters is changes requested, because it means the draft needs work before anyone signs anything.
Declarations and what they cover
The sign-off portal carries a declaration. Read what it says before you rely on it, because a declaration covers what the reviewer has checked and nothing more.
Three questions worth asking any reviewer:
- Are you taking authorship of this document, or reviewing it as prepared by another
- Does your professional indemnity insurance cover a review instruction of this kind
- Which parts of the document are you not commenting on
A review is not a transfer of liability, and a reviewer who has not seen the site cannot verify what is on it. That is why a named author and a date on the document matter so much, a point developed in why every planning report needs a named author and date. Where a graduate prepared the underlying work and a chartered professional signs it, the arrangement has its own conventions, set out in supervision chains: graduate work signed by a chartered author.
Turnaround and fee expectations
Ask for a fee and a date in the same message, and give the reviewer the page count. Review time is driven by the number of TO BE CONFIRMED flags and by whether the survey data exists, not by the length of the document.
Be realistic about seasons. If the review identifies that a bat emergence survey is needed and it is October, no reviewer can sign the ecology position until the following May. Nobody can compress that, and a reviewer who agrees to is not one you want.
Build the review into the programme at the point the drawings are fixed, not the week before you submit. If the review produces changes you then argue about, the position is covered in redress when a consultant's report fails at validation.
Acting on the reviewer's comments
Deal with every comment, and record how. A short response schedule, comment by comment, with the action taken and the document version it appears in, does three things: it proves you addressed the point, it gives the reviewer confidence to sign, and it becomes your audit trail if the council queries the document later.
Where you disagree with a comment, say so in writing with your reasoning and let the reviewer decide whether they can still sign. What you must not do is quietly leave the comment unresolved and submit anyway. That is the version that comes back from the council.
You can send a draft out for sign-off through the professional reviewer directory or to your own consultant. For specialist technical reports, qualified professional input may be required.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Which reports legally require a licensed or competent professional?
Environmental Impact Assessment, Protected Species Survey, Biodiversity Net Gain Assessment, Land Contamination Phase 1 and Phase 2, Fire Statement and Fire Safety Strategy. For each, a licensed or competent professional is required by law, and an AI-assisted draft is a starting point for that professional rather than a substitute for their work.
What should I send with a review instruction?
The draft with its flags left in, the numbered and dated drawings, any survey data, the known site constraints, the council's local validation list, the intended application description and your submission date. Send it as one package. A reviewer chasing attachments across several emails will charge for the chasing.
Does a sign-off transfer liability to the reviewer?
No. A declaration covers what the reviewer has checked and nothing further. Ask explicitly whether they are taking authorship or reviewing work prepared by another, whether their professional indemnity cover extends to review instructions, and which parts of the document they are not commenting on.
How long does a review take?
It depends on the number of unresolved site facts rather than the page count. Where survey data is missing and the survey window has closed, no reviewer can complete the position until the season reopens. A bat emergence survey identified in October cannot be signed off before the following May, whatever the fee.
What do I do with comments I disagree with?
Respond in writing with your reasoning and let the reviewer decide whether they can still sign. Keep a response schedule listing every comment, the action taken and the document version it appears in. Submitting with comments quietly unresolved is how documents come back from the council.
Can PlanScope arrange the review?
PlanScope includes a professional directory and a review request flow with a sign-off portal, where requests move through the statuses sent, accepted, in review, changes requested, signed off, rejected and expired. You can also instruct your own consultant directly and submit their review note alongside the document.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.