Who can prepare a health impact assessment

6 min readBy PlanScope Editorial Team

There is no licence for health impact assessment. What matters is whether the author can handle public health evidence and answer the policy that triggered it.

No qualification is prescribed for health impact assessment in planning, and no register of authors exists. Who can write a health impact assessment is therefore a practical question: can the author read the policy that triggered the requirement, obtain and interpret local public health evidence, and write recommendations that a planning condition or a section 106 obligation could actually secure. Most of the assessments that get sent back fail on the third of those.

There is no national statutory requirement either. The trigger is a local plan policy, which means the first thing an author has to do is read that policy and the authority's own guidance on how it expects the assessment to be done.

When a local plan policy triggers an assessment

Requirements vary widely, and the pattern across England is a threshold in the plan tied to scheme size or type. Thresholds commonly attach to residential schemes above a stated number of units, to major development of a stated floorspace, to hot food takeaways near schools, and to proposals for health or care facilities. In London the plan sets its own expectation for larger schemes and boroughs add their own.

Find three documents before you start:

  1. The development plan policy itself, with its exact threshold and wording.
  2. Any supplementary planning document or local guidance note on how to carry out the assessment, including a required template or checklist.
  3. The authority's validation list, which will say whether the assessment is a validation requirement or something expected at determination.

Where the policy sets a template, use it. Authorities that have published a matrix and receive a free-form report send it back, and the resubmission costs more than reading the template would have.

Rapid, intermediate and full scopes

The three scopes are not interchangeable, and choosing the wrong one wastes money or fails the policy.

A rapid assessment is a desk exercise, usually a structured matrix working through health determinants with a short commentary and a set of recommendations. It suits minor and smaller major schemes and typically runs to 20 or 30 pages.

An intermediate assessment adds quantitative baseline analysis, some engagement with the local public health team, and a fuller treatment of the determinants that the scheme actually affects. It suits larger residential schemes and mixed use regeneration.

A full assessment adds primary engagement with affected communities, quantified health outcome modelling where that is possible, and a monitoring framework. It is proportionate to strategic sites, large urban extensions and schemes with contested health effects such as a major road or an energy facility.

Scope proportionately and say in the report why you chose the scope you did. An assessment that applies a full methodology to 60 dwellings reads as padding, and one that applies a rapid matrix to 2,000 homes reads as avoidance.

Public health evidence an author must handle

This is the competence that separates authors. The evidence sits in several places and none of it arrives pre-digested.

Source What it gives you
Joint strategic needs assessment The authority's own analysis of local health needs and priorities
Health and wellbeing strategy The priorities the director of public health is working to
Indices of deprivation Ward and lower layer super output area deprivation, including the health domain
Office for National Statistics data Population structure, life expectancy and household projections
Integrated care board information Primary care capacity, which drives the health contribution question
Scheme-specific technical reports Air quality, noise, open space, transport and daylight outputs

An author who cannot locate a joint strategic needs assessment or does not know what a lower layer super output area is will produce a generic document. The assessment has to say something about this place, and that means working with the actual figures rather than describing the general importance of health.

And the scheme's own technical reports matter as much. A health assessment that asserts good air quality while the Air Quality Assessment for the same scheme reports an exceedance at the site frontage will be read as unreliable, and the contradiction is easy for an officer to find.

Working with the director of public health

The local authority's director of public health, or a member of their team, is normally consulted on schemes where the policy applies. They are the reader who matters, and they read differently from a planning officer.

What they look for is whether the assessment engages with their own priorities, whether the baseline is local, whether the recommendations are specific enough to be implemented, and whether anything has been claimed as a health benefit without support. What irritates them is a report that lists the benefits of walking.

Early contact is worth the effort. A short scoping conversation, before the assessment is written, about which determinants matter in that area and what evidence the team expects, converts a consultation objection into a consultation comment.

Mitigation a condition or obligation can secure

Recommendations that cannot be secured are the commonest weakness. Each one should be written so that it maps onto a mechanism.

Design and layout recommendations go into the drawings and are secured by the approved plans condition. Operational matters such as a travel plan, a construction management plan or a management regime for an open space are secured by condition. Financial contributions towards primary care capacity, open space, play provision or active travel infrastructure are secured by a section 106 obligation, and they have to meet the statutory tests of necessity, direct relationship and reasonable relationship to scale. Monitoring commitments go into the obligation as well.

Recommendations that cannot be secured by any of those, such as encouraging future residents to cook from scratch, should be dropped. They make the rest of the document look weaker than it is.

Where the assessment overlaps other documents

The overlap is extensive, and the way to handle it is cross-reference rather than repetition. Air quality, noise, daylight, open space, play space and transport all produce findings the health assessment interprets rather than recreates. Equality and inclusion sit alongside, and the relationship with an Equalities Impact Assessment is worth stating explicitly because the two documents consider overlapping groups for different statutory reasons. Social and community infrastructure capacity belongs in a Social Infrastructure Assessment and should be referenced rather than duplicated.

Councils usually expect a suitably qualified author for this work, and professional review is strongly advised. A Health Impact Assessment drafted with AI assistance can carry the structure, the policy framework and the determinant checklist, but the local baseline, the professional judgement and the recommendations need an author who will stand behind them.

Checking an assessment against the policy asked about

Five checks before submission. Does the report answer the specific policy, by number, that triggered it. Is the baseline local, with sources and dates. Does every recommendation name a securing mechanism. Do the findings agree with the technical reports for the same scheme. Has the public health team seen a draft.

If an independent check is wanted, the question of when a peer review earns its fee is dealt with in the guide to when an independent peer review is worth paying for.

This is general guidance, not legal advice. Local plan thresholds, templates and public health datasets change, so confirm the requirement with your local planning authority before commissioning the work.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a health impact assessment a national planning requirement?

No. There is no national statutory requirement for one in England. The trigger is a development plan policy, usually tied to a threshold based on the number of dwellings, the floorspace, or a particular use such as a hot food takeaway near a school. Read the policy and any local guidance note before scoping the work.

What qualifications does a health impact assessment author need?

None are prescribed, and no register exists. Authorities look for an author who can interpret the local joint strategic needs assessment, deprivation and population data, work with the public health team, and write recommendations capable of being secured by condition or obligation. Councils usually expect a suitably qualified author and professional review is strongly advised.

What is the difference between a rapid and a full assessment?

A rapid assessment is a desk-based matrix of health determinants with commentary and recommendations, suited to smaller schemes. An intermediate assessment adds quantitative baseline work and engagement with the public health team. A full assessment adds community engagement, quantified outcome modelling where possible and a monitoring framework, and suits strategic sites and contested schemes.

Who consults on a health impact assessment?

The local authority's director of public health or their team, usually through the planning consultation process. They assess whether the baseline is really local, whether the assessment engages with their published priorities, and whether the recommendations are specific enough to implement. A scoping conversation before writing usually converts an objection into a comment.

How are health recommendations actually secured?

Through the approved plans condition for design and layout matters, through planning conditions for operational measures such as travel plans and management regimes, and through a section 106 obligation for financial contributions towards primary care, open space, play provision or active travel. Contributions must meet the statutory tests of necessity and relationship to the development.

Sources and further reading

health impact assessmentpublic healthcompetencesection 106major developmentdeveloper

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →