Grain stores and the Part 6 siting and design notification

8 min readBy PlanScope Editorial Team

Class A of Part 6 covers agricultural buildings on units of 5 hectares or more, but only after a notification of siting, design and external appearance is determined.

A grain store on a holding of 5 hectares or more usually does not need planning permission. It needs a grain store prior notification: an application to the local planning authority for a determination of whether it wishes to approve the siting, design and external appearance of the building. The right comes from Class A of Part 6 of Schedule 2 to the General Permitted Development Order 2015, and the notification is the step that catches people out, because building without it makes an otherwise lawful store unlawful.

The authority cannot refuse the building on the ground that it does not like the idea. Its powers under the notification are limited to siting, design and external appearance. What it can do is take those matters seriously, and on a prominent ridge in a National Landscape it will.

Which buildings the right covers

Class A permits works on agricultural land within an agricultural unit of 5 hectares or more, where the works are reasonably necessary for the purposes of agriculture within that unit. That includes the erection, extension or alteration of a building, and it includes excavation and engineering operations such as a new private way or a slurry store.

What it does not cover:

  • A dwelling of any kind, including an agricultural worker's house.
  • A building, structure or works not designed for agricultural purposes. A machinery store that is really a commercial workshop is outside the right.
  • Development on a separate parcel of the unit smaller than 1 hectare.
  • Excavations or engineering operations on or under a site of archaeological interest.

The functional test is the one that gets forgotten. "Reasonably necessary for the purposes of agriculture within that unit" means within your unit, so a store built principally to take contract grain from neighbouring farms is not covered, and neither is a building erected in anticipation of a diversification scheme. Where the real purpose is commercial, the honest route is a full application, and the arguments for that sit alongside those for workshops and offices on a farm.

The limits that apply to Class A

Limit Class A (unit of 5 hectares or more)
Ground area of the building or works Not more than 1,000 m²
Height, general Not more than 12m
Height within 3km of an aerodrome perimeter Not more than 3m
Distance from a metalled trunk or classified road Not within 25m
Livestock buildings, slurry and sludge stores Not within 400m of the curtilage of a protected building
Separate parcels Parcel must be at least 1 hectare

The ground area limit is cumulative in a way that surprises people. Where another building has been put up on the same unit within the previous two years and sits within 90m of the proposed store, its area counts towards the 1,000 m². Two 600 m² sheds erected 18 months apart at either end of the same yard will not both fit inside the right.

Check the aerodrome distance before designing a store with a high eaves for a grain dryer or an auger tower. Three metres is nothing, and the 3km radius takes in more small airfields than most people realise.

Where 465 square metres comes from

The 465 m² figure belongs to Class B, not Class A. Class B applies to agricultural units of at least 0.4 hectares but less than 5 hectares, and it is a much narrower right: extensions and alterations to existing buildings and some works, with a ground area limit of 465 m² and a cap on how much an existing building may be enlarged.

So the first question on any farm building is the size of the agricultural unit, not the size of the building. Under 0.4 hectares there is no Part 6 right at all and a full application is required. Between 0.4 and 5 hectares you are in Class B territory. At 5 hectares and above you are in Class A.

Get that wrong and everything downstream is wrong, which is why the area of the unit should be calculated and stated in the notification with a plan.

The notification of siting, design and external appearance

Where the development involves the erection, extension or alteration of a building, the formation or alteration of a private way, certain excavations or deposits, or the placing of a tank in waters, you must apply to the authority for a determination as to whether its prior approval is required.

The application is short: a written description of the proposed development and the materials to be used, a plan showing the site, and the developer's contact address, together with the fee. Councils have their own forms and most take it through the national portal.

Send more than the minimum where the setting is sensitive. A site plan showing the store in relation to the existing yard, a simple elevation with the colour finish stated, and a short note on why that position was chosen over the alternatives will often produce a determination that prior approval is not required. On an exposed site a landscape appraisal, or a full Landscape and Visual Impact Assessment where the scale warrants it, saves an argument later.

The 28 day period and what follows

The authority has 28 days from receipt to notify you whether prior approval is required.

  1. If it tells you prior approval is not required, you may build in accordance with the details you submitted.
  2. If it tells you prior approval is required, you must obtain that approval before starting, and the authority then considers the siting, design and external appearance on their merits.
  3. If it does not respond within 28 days, you may proceed in accordance with the details submitted.

Three things follow from that. Do not vary the design afterwards, because the right attaches to what you submitted. Keep the determination letter with the farm records permanently, since it is the evidence that the building is lawful. And note that the development must be carried out within five years of the determination, so an old notification does not authorise a store built a decade later.

The right also carries use conditions. A building erected under Class A must be used for agriculture, and using it for storage of non-agricultural goods, or letting it to a business, is a change of use requiring permission.

Excluded locations and designations

The right is not available everywhere in the same form.

An Article 4 direction can remove or restrict it, and some authorities have made directions covering agricultural buildings in sensitive areas. Additional restrictions apply in National Parks, the Broads, National Landscapes and conservation areas, so check both the current Order and the local position before relying on the general limits.

Separately from Part 6, other consent regimes still apply. Works affecting a listed building or its curtilage need listed building consent. A protected tree needs consent for works. Removing a length of countryside hedgerow to widen an access may need a notification, as set out in our note on the important hedgerow test. A new or altered access onto a classified road needs the highway authority's agreement. And larger intensive livestock proposals can require environmental impact assessment screening, which is a different question from Part 6 entirely.

What to submit with the notification

Keep it to a short pack that answers the authority's questions before they are asked.

  • A site location plan and a block plan showing the store, the existing yard buildings, the access and the boundaries.
  • A calculation of the agricultural unit area with a plan showing the land in the unit.
  • The ground area of the proposed building, plus any building erected within the previous two years within 90m, with dates.
  • Elevations and a section with overall height, eaves height and the proposed external materials and colour.
  • A short statement of agricultural necessity: the cropping area, current storage capacity, the shortfall and why the store is needed on this unit.
  • Screening or planting proposals where the site is visible from a road, a right of way or a settlement.
  • Confirmation of distances to any aerodrome, trunk or classified road and, for livestock or slurry, to protected buildings.

Illustrative example: a 210 hectare arable holding proposing a 900 m² grain store with 7m eaves, 60m from the existing yard and 340m from the nearest classified road. A machinery shed of 180 m² was built 14 months earlier, 70m away, so the combined area is 1,080 m² and the right does not cover it. The store is redesigned to 780 m² with a taller centre bay to keep the same tonnage, bringing the total within the limit, and the notification is submitted with a planting scheme along the western boundary.

Where a full application does turn out to be necessary, a Planning Statement setting out the agricultural justification and the landscape response is the document that carries the case.

Enter your postcode on PlanScope to see which documents a farm building proposal is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that works are lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for a grain store?

On an agricultural unit of 5 hectares or more, a store reasonably necessary for agriculture within that unit usually falls within Class A of Part 6 of the General Permitted Development Order, subject to its limits. You still have to apply to the council for a determination of whether it wishes to approve the siting, design and external appearance before building.

What is the ground area limit for a Class A farm building?

1,000 m². The calculation is cumulative: where another building was erected on the same unit within the previous two years and sits within 90m of the proposal, its area counts towards the limit. Two sheds put up 18 months apart in the same yard will often not both fit within the right.

Where does the 465 square metre figure apply?

To Class B, which covers agricultural units of at least 0.4 hectares but under 5 hectares. Class B is a narrower right dealing with extensions and alterations to existing buildings, with a 465 m² ground area limit. Below 0.4 hectares there is no Part 6 right at all and a full application is needed.

What happens if the council does not reply within 28 days?

You may proceed in accordance with the details you submitted. If the authority says prior approval is not required, the same applies. If it says approval is required, you must obtain it before starting. Keep the determination letter permanently, and note that the development has to be carried out within five years.

Can the council refuse a Part 6 notification because the building is not needed?

Its powers on the notification are limited to siting, design and external appearance. But the right only exists where the building is reasonably necessary for agriculture within that unit, so a store built mainly to take contract grain from other farms, or in anticipation of a diversification business, falls outside Class A and needs a full application.

Sources and further reading

part 6agricultural buildingsprior notificationgrain storepermitted developmentgpdo

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Rural and Agricultural

View all →
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →