Glossary

Greenfield runoff rate: what it means and how it is set

6 min readBy PlanScope Editorial Team

The greenfield runoff rate is an estimate of peak surface water flow from an undeveloped site, and it sets the attenuation volume. Here is how it is calculated and what evidence an authority expects.

The greenfield runoff rate is the rate at which rainfall would leave a site as surface water if the site were undeveloped, expressed in litres per second and usually quoted per hectare. It is the benchmark a lead local flood authority uses when deciding how much surface water a development may discharge, and on most sites it is the number that sizes the attenuation.

It is an estimate, not a measurement. Nobody gauges the flow off a field before it is built on, so the rate is derived from catchment characteristics using a published method, and the method chosen changes the answer.

What the rate represents

The rate describes peak flow, not volume. For a given storm return period, it is the highest instantaneous discharge the undeveloped catchment would produce.

Three values are usually quoted together. QBAR is the mean annual flood flow, which is the baseline figure. The 1 in 1 year, 1 in 30 year and 1 in 100 year rates are then derived from QBAR using growth factors. The 1 in 100 year greenfield rate is often the limit applied to the 1 in 100 year plus climate change event from the developed site, which is why a scheme has to store a great deal of water to meet it.

The national technical standards for sustainable drainage expect the peak runoff rate from a greenfield site to be no higher than the greenfield rate for the same event. On a previously developed site the expectation is that the rate should be as close to greenfield as reasonably practicable, and in any case no worse than the existing rate.

Methods used to estimate it

Three approaches appear in submitted calculations, and an authority will ask which one was used.

The Institute of Hydrology Report 124 method is the standard approach for small catchments. It derives QBAR from the catchment area, the standard average annual rainfall for the location, and a soil index describing how readily the soil sheds water. For sites below about 50 ha it is the usual choice, with a minimum area applied because the method becomes unreliable on very small catchments.

The Flood Estimation Handbook statistical method is used on larger catchments and where a gauged record exists nearby. It gives a different answer from IH124 on the same site, sometimes materially.

Soil based approaches using published soil and hydrology classifications supply the runoff parameter that both methods need. The data source matters: a national soil map read at 1:250,000 is coarse, and where the result is marginal an authority may accept site specific infiltration data instead.

State the method, the inputs and the data source in the calculation sheet. An attenuation volume presented without the greenfield calculation behind it is the commonest reason a drainage submission goes back.

Why previously developed sites are treated differently

A site already covered in buildings and tarmac discharges at a rate far above greenfield, so applying the greenfield limit to a redevelopment would often make the scheme undeliverable.

The policy answer is betterment rather than compliance. Calculate the existing rate from the current impermeable area, calculate the greenfield rate as though the site were undeveloped, and then show how close the proposal gets to greenfield. Where greenfield cannot be achieved, explain why with reference to the physical constraints: available space for storage, depth to the outfall, ground conditions unsuitable for infiltration, basement or contamination constraints.

Authorities differ in what they will accept, and some set a fixed expectation such as a stated percentage reduction on the existing rate. The London Plan takes a stronger position, aiming at greenfield runoff on all development. Read the authority's own guidance and any surface water management plan before fixing the strategy, and treat consultee standing advice from planning consultees as the starting point rather than the whole answer.

Minimum discharge rates and blockage risk

There is a practical floor to how small a discharge can be controlled.

A flow control device set to a very low rate needs a small orifice, and a small orifice blocks. Most lead local flood authorities will not accept a controlled discharge below around 5 litres per second for that reason, and some will accept lower where a vortex or hydrobrake style device with a larger throat is specified and a maintenance regime is secured.

That floor has a consequence on small sites. On a plot of a quarter of a hectare the calculated greenfield rate may be well below the minimum the authority will permit, so the control is set at the minimum and the attenuation is sized accordingly. Say so in the calculation rather than presenting an unachievable figure.

An illustrative calculation for a one hectare site

The sequence below is illustrative and the arithmetic should be run with the actual site inputs.

  1. Establish the catchment area in hectares, taken from the red line or from the drained area where those differ.
  2. Obtain the standard average annual rainfall for the location from the published dataset.
  3. Obtain the soil runoff parameter for the site from the national soil and hydrology classification.
  4. Calculate QBAR using the IH124 relationship, which combines the three inputs above.
  5. Apply the growth factors for the region to derive the 1 in 1, 1 in 30 and 1 in 100 year rates.
  6. Compare the 1 in 100 year greenfield rate with the achievable controlled discharge, and apply the minimum rate where the calculated figure falls below it.
  7. Size the attenuation for the critical duration event at the 1 in 100 year plus climate change allowance, discharging at the agreed rate.
  8. Add an allowance for urban creep on residential schemes, since paving of gardens over time increases the impermeable area.

For a lowland English hectare the 1 in 100 year greenfield rate commonly comes out at a single figure number of litres per second, which is why attenuation volumes on even modest sites run to hundreds of cubic metres. The climate change allowance is revised periodically, so take the current percentage from the published allowances rather than from an earlier report.

Evidence the authority asks for

A drainage submission that gets approved first time contains the calculation and its workings, not just the conclusion. A Drainage Strategy should include:

  • The greenfield rate calculation with the method named, each input stated and its source identified.
  • The existing rate calculation for a previously developed site, with the impermeable area measured and shown on a plan.
  • Infiltration test results to the relevant standard where infiltration is proposed, including failed tests.
  • Attenuation volume calculations for the critical duration, with the climate change allowance and the urban creep allowance stated separately.
  • The flow control device type and its set rate, with the minimum rate position explained.
  • Exceedance flow routing for events beyond the design standard, shown on a drawing.
  • A maintenance plan with the responsible party named for the lifetime of the development.

Where the site is in Flood Zone 2 or 3, or is one hectare or more, a Flood Risk Assessment carries this material alongside the flood risk case. Drainage conditions are also among those most often varied later, and section 73 variation of planning conditions explains that route where a scheme changes.

Drainage design needs a suitably qualified author, usually a civil or water engineer, and professional review is strongly advised. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which reports your site is likely to need.

Frequently asked questions

What is the greenfield runoff rate?

The peak rate at which rainfall would leave a site as surface water if the site were undeveloped, expressed in litres per second and usually per hectare. It is an estimate derived from catchment characteristics rather than a measurement, and it is the benchmark a lead local flood authority uses to set the permitted discharge from a development.

Which method should be used to calculate it?

The Institute of Hydrology Report 124 method is the usual choice for small catchments, deriving the mean annual flood flow from catchment area, standard average annual rainfall and a soil runoff parameter. The Flood Estimation Handbook statistical method suits larger catchments. The two give different answers on the same site, so name the method and state the inputs.

Does the greenfield rate apply to a brownfield site?

Not as a hard limit. The expectation on previously developed land is to get as close to the greenfield rate as reasonably practicable and in any event no worse than the existing rate. Calculate both the existing and the greenfield figures, show how close the proposal comes, and explain any shortfall by reference to physical constraints.

Why is there a minimum discharge rate?

Because a very low controlled discharge needs a small orifice, and small orifices block. Most lead local flood authorities will not accept a control below around five litres per second, with lower rates sometimes allowed where a vortex style device with a larger throat is specified and maintenance is secured. On small sites the minimum often governs instead of the calculation.

What allowances have to be added to the calculation?

A climate change allowance on rainfall intensity, taken from the current published allowances rather than an older report, and an urban creep allowance on residential schemes to reflect gardens being paved over time. State each allowance separately in the calculation so a reviewer can see what has been applied and at what percentage.

Sources and further reading

drainagesudsgreenfield runoffflood riskglossarylead local flood authority

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Revocation or modification of a planning permission

Implementation defeats revocation, and compensation for depreciation in land value is why authorities rarely make these orders. The confirmation procedure, the objection route and the sequence to follow.

Read article →
Glossary7 min read

Tree replacement notice after unlawful removal

The duty to replace a protected tree runs with the land and applies even where felling was exempt. How the notice works, the 28 day appeal window, and the records that prevent the dispute.

Read article →
Glossary7 min read

Vacant building credit and affordable housing contributions

Where the credit applies, affordable housing is calculated on the uplift rather than the whole scheme. What counts as vacant, what counts as abandoned, and why a long vacancy can cost you the levy offset.

Read article →
Glossary7 min read

Established use and lawful use in planning explained

Immunity from enforcement is not the same as planning permission. What makes a use lawful, how the time limits now work in England, and the evidence a section 191 certificate application needs.

Read article →
Glossary7 min read

Openness of the Green Belt: spatial and visual

Openness is about the absence of built development, not visual amenity. The metrics that make an openness assessment persuasive, and the comparison traps in the Green Belt exceptions.

Read article →
Glossary7 min read

Primary shopping area: why the boundary matters

One line on the policies map decides whether a site is in centre, edge of centre or out of centre, and whether a sequential test and an impact assessment are needed.

Read article →