Holdings under five hectares and what Part 6 allows

6 min readBy PlanScope Editorial Team

On a holding between 0.4 and five hectares you can extend an existing agricultural building but cannot erect a new one. That single point reshapes most smallholding plans.

Five hectares is the line that decides what you can build without a planning application. Part 6 of Schedule 2 to the General Permitted Development Order 2015 splits agricultural permitted development in two: Class A covers agricultural units of five hectares or more, and Class B covers units of at least 0.4 hectares but less than five. Under part 6 class B small holding rights you can extend and alter what is already there, form tracks and hard surfaces, and install plant. You cannot put up a new building at all.

That single omission is why so many smallholders discover, late, that the barn they costed needs a full application.

Where the five hectare line falls

The unit is measured as an agricultural unit, meaning land occupied as a unit for agricultural purposes. It is the occupation that counts, not the title. Land you rent in counts if you occupy it as part of the same farming operation, and land you let out to someone else does not.

Below 0.4 hectares there are no Part 6 rights at all. Between 0.4 and five hectares you have Class B. At five hectares and above you move to Class A, with its new building rights subject to the 465 square metre ground area limit and the other conditions in A.1.

The measurement is taken at the time of the development. A holding that was six hectares two years ago but has since sold a field is a Class B unit now.

What Class B permits

Class B allows six categories of operation on a qualifying unit, each reasonably necessary for the purposes of agriculture within that unit.

  • Extension or alteration of an existing agricultural building.
  • Installation of additional or replacement plant or machinery.
  • Provision, rearrangement or replacement of a private way.
  • Provision or replacement of a hard surface.
  • Deposit of waste material arising from building or engineering operations.
  • Certain operations connected with fish farming.

Read the first one carefully. It is extension or alteration, which presupposes a building to extend. There is no right to erect a new building, no right to put up a dwelling, and no right to erect a building for a non-agricultural purpose however small.

So the practical sequence on a smallholding is to establish what buildings you lawfully have, then work out what can be done to them. An owner with no buildings has no Class B building rights worth having.

The limits on an extension

Limit Position under Class B
Unit size At least 0.4 ha and less than 5 ha
Ground area of the building as extended Must not exceed 1,000 m²
Height 12 m generally, 3 m within 3 km of an aerodrome
Proximity to road Not within 25 m of the metalled part of a trunk or classified road
Livestock housing and slurry Not within 400 m of a protected building
Dwellings Never permitted
Purpose Reasonably necessary for agriculture on that unit

Class B also caps the proportionate increase in the size of the original building, and the cap is tight. Measure the original cubic content before anyone draws anything, and read the current wording of B.1 and B.2 on legislation.gov.uk rather than working from a figure in an old note, because Part 6 has been amended several times.

Two conditions catch people out after the event. The building has to be used for agriculture on that unit, so a barn extended under Class B and then let for storage to an unconnected business is in breach. And if the agricultural use stops within ten years of the works being completed, the authority can require removal where no subsequent permission has been obtained.

Units split by ownership or tenancy

The common difficulty is the holding that looks like one farm and is legally three. Owner-occupied fields, a grazing licence over a neighbour's paddock and a tenancy of a block down the lane can add up to seven hectares on a map and still not be a single agricultural unit.

Ask three questions. Is the land occupied by the same person or entity. Is it farmed as one operation, with shared labour, machinery and stock. Is the occupation of each parcel on terms that give real control, rather than a bare licence for seasonal grazing.

Where the answers diverge, the safe assumption is the smaller unit. A prior notification submitted on the basis of a unit the council does not accept is worse than a full application, because you have now told the authority what you intend and the clock gives you nothing.

Evidencing the extent of the unit

Councils ask for this more than they used to, and the evidence is straightforward to assemble.

  1. A plan of the whole unit with every parcel outlined and its area stated in hectares.
  2. Title documents or tenancy agreements for each parcel, with the term and the permitted use.
  3. The holding number and the current land parcel information for the holding.
  4. A short description of the farming enterprise: stock numbers, cropping, machinery kept.
  5. An explanation of why the proposed works are reasonably necessary for that enterprise, with figures.

Point five is the one that fails. "The building is needed for storage" tells an officer nothing. "The holding keeps 40 ewes and cuts 180 bales a year, and the existing building takes 60 bales" is an argument. Where the land is good quality and the works affect it, an Agricultural Land Classification survey may also be requested, particularly on sites where best and most versatile land is in play.

The prior notification procedure

Part 6 development of certain kinds requires an application to the authority for a determination as to whether its prior approval will be required for the siting, design and external appearance of the building or the route and width of a private way. The authority has 28 days to tell you whether approval is required. If it says nothing in that period you may proceed in accordance with the details submitted.

Three practical points. Submit accurate details, because what you may build is what you notified. Do not start work before the period expires, since early works are unauthorised even if the notification would have succeeded. And expect the authority to use the design limb properly on prominent sites: a grey profile sheet building on a ridge in a National Landscape will attract a requirement for approval and then a request for a Landscape and Visual Impact Assessment.

When a full application is the only route

Four situations put you outside Part 6 entirely, and recognising them early saves a wasted fee.

A new building on a unit under five hectares. Any dwelling. Any building for a use that is not agriculture, including equestrian use, since keeping horses is not agriculture and the position on livery yards and the point horses become a business is a separate question. And any diversification into workshops, offices, storage for third parties or visitor use, where the route is a planning application and the policy support for farm diversification into workshops and offices is what you build the case on.

For those applications a Planning Statement that explains the enterprise, the functional need and the siting choice does most of the work. And on a small holding the siting argument matters more than the design: officers accept plain agricultural buildings in sensible places far more readily than well-detailed ones in the middle of a field.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that works are lawful. PlanScope produces AI-assisted draft reports for planning applications, and reports should be reviewed before submission. PlanScope does not guarantee planning approval.

Frequently asked questions

Can I build a new barn on a holding under five hectares?

Not under permitted development. Class B of Part 6 permits the extension or alteration of an existing agricultural building, plus private ways, hard surfaces, plant and waste deposits, but it contains no right to erect a new building. A new barn on a unit of that size needs a full planning application.

How is the five hectare threshold measured?

By reference to the agricultural unit, meaning land occupied as a unit for agricultural purposes. Occupation rather than ownership is the test, so rented land you farm counts and land you let out does not. The area is measured at the time of the development, so a recent sale can move you from Class A to Class B.

What are the main limits on a Class B extension?

The ground area of the building as extended must not exceed 1,000 square metres, height is limited to 12 metres and to 3 metres within 3 kilometres of an aerodrome, nothing may sit within 25 metres of the metalled part of a trunk or classified road, and livestock housing or slurry must stay 400 metres from a protected building.

Do I have to notify the council before building?

For several kinds of Part 6 development you must apply for a determination as to whether prior approval is required for siting, design and external appearance, or for the route and width of a private way. The authority has 28 days to respond. Do not start work before that period ends, even if you expect no response.

What happens if the agricultural use stops?

Where the agricultural use of a building erected or extended under Part 6 ceases within ten years of completion, and no subsequent permission has been granted, the authority can require the building to be removed and the land restored. Letting an agricultural building to an unconnected business is also a breach of the use condition.

Sources and further reading

part 6smallholdingpermitted developmentagricultural buildingsprior notificationrural planning

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Rural and Agricultural

View all →
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →