Neighbours, Objections and Community

How to get involved in a neighbourhood plan

6 min readBy PlanScope Editorial Team

A made neighbourhood plan decides applications alongside the local plan. Joining the qualifying body and responding at Regulation 14 gives you far more influence than objecting later.

A neighbourhood plan is the only part of the English planning system that ordinary residents write themselves, vote on, and then see used to decide applications. Once it has passed a referendum and been made by the council, it forms part of the statutory development plan, which means applications are determined in accordance with it unless material considerations indicate otherwise. Getting involved means either joining the qualifying body that prepares the plan or responding at the two formal consultation stages, and the first of those gives you far more influence than the second.

What a neighbourhood plan can and cannot do

The powers come from the Localism Act 2011, which inserted the neighbourhood planning provisions into the Town and Country Planning Act 1990 and the Planning and Compulsory Purchase Act 2004, with procedure set by the Neighbourhood Planning (General) Regulations 2012.

A plan can set design policies and codes, allocate sites for housing or employment, identify a local list of non-designated heritage assets, designate Local Green Space, set standards for parking and open space, and protect community facilities. Several of those bite directly on householder and small-site applications.

What it cannot do is block growth. A neighbourhood plan must meet the basic conditions, which include having regard to national policy, contributing to the achievement of sustainable development, and being in general conformity with the strategic policies of the development plan for the area. A plan proposing fewer homes than the strategic policies require will not pass examination.

That constraint disappoints people who join expecting to stop an allocation. The realistic ambition is to shape where development goes, what it looks like, and what comes with it.

Who prepares one, and how to join

In a parished area the qualifying body is the parish or town council. It will normally set up a steering group open to residents, and the quickest route in is to write to the clerk and ask when the group next meets.

Where there is no parish council, which covers most urban areas, a neighbourhood forum has to be designated first. A forum needs a written constitution, membership open to people who live in the area, work there or are elected members for it, and a minimum of 21 members drawn from those categories. Designation lasts five years and is granted by the local planning authority after publicity.

Either way there are two applications to the council before any policy is written: one to designate the neighbourhood area, and in unparished areas one to designate the forum. Both are publicised, and both are points at which residents can support or object.

The work itself is unglamorous. Evidence gathering, character appraisals, site assessments, a housing needs survey, design workshops. Groups usually need one person who will read the strategic policies properly, and volunteers for that are scarce.

Designating Local Green Space

This is the tool most community groups are looking for without knowing its name. Local Green Space is a designation made through a local or neighbourhood plan that gives an area protection consistent with Green Belt policy.

The National Planning Policy Framework sets three tests. The green area must be in reasonably close proximity to the community it serves, demonstrably special to that community and holding a particular local significance, and local in character rather than an extensive tract of land.

Build the evidence around those words. Photographs and a boundary plan. Written statements from users about why the space matters, whether for recreation, tranquillity, richness of wildlife or historic significance. Evidence of the community it serves, with distances. A statement that the designation is capable of lasting beyond the plan period, which means the space must not already be allocated for development.

The designation fails most often on the third test, where a group tries to designate every field around a village. Choose a small number of spaces and evidence each one properly. And be ready to drop the weakest, because an examiner who strikes out one designation will look harder at the rest.

Consultation, examination and referendum

Two consultation stages are prescribed, and their names are worth learning because groups and objectors both refer to them by number.

  1. Regulation 14 pre-submission consultation, run by the qualifying body for at least six weeks, on a draft plan. This is the stage where comments change policy wording, because the group is still drafting.
  2. The plan is then submitted to the local planning authority with a consultation statement and a basic conditions statement.
  3. Regulation 16 publicity, run by the authority for at least six weeks. Representations go to the examiner.
  4. Independent examination, usually by written representations rather than a hearing. The examiner can recommend modifications, and commonly does.
  5. Referendum in the neighbourhood area, decided by a simple majority of those voting.
  6. The authority makes the plan, and it becomes part of the development plan.

Respond at Regulation 14 if you want to change something. By Regulation 16 the examiner is testing the submitted plan against the basic conditions, not weighing whether a different policy would have been better. The same principle applies when plans are amended after you object to an individual application: the earlier you engage, the more there is to change.

Weight once the plan is made

A made neighbourhood plan is part of the development plan, so section 38(6) applies and applications are decided in accordance with it unless material considerations indicate otherwise.

Weight builds before that point. A plan that has passed examination and is awaiting referendum can carry substantial weight, and a submitted plan carries some. Objectors and applicants both need to check where in the process the plan sits on the date the application is determined, not the date it was submitted.

The Framework also contains a protection for recently made neighbourhood plans in areas where the authority cannot demonstrate a five year housing land supply. The detail has changed between editions, so check the current text rather than relying on an older summary.

Ageing is the plan's weakness. Policies written against a superseded local plan lose force as the strategic policies are replaced, and groups that treat the referendum as the finish line find the plan quietly ignored within a decade. Review is the answer, and a light-touch modification process exists for changes that do not alter the nature of the plan.

Making the involvement count

If you have limited time, spend it on three things: the Regulation 14 response, the Local Green Space evidence, and the design policies, because design is where a neighbourhood plan has the most reliable effect on the applications that follow.

Ask the group for its consultation statement early, and read the council's own Statement of Community Involvement alongside it, since that document sets what the authority has committed to do. The questions worth asking a plan group are much the same as those worth asking at a developer's consultation event: who decided this, what evidence sits behind it, and what happens to my comment.

Browse all 66 PlanScope report types and start a draft if you are on the other side of this and need the evidence base for a site within a neighbourhood plan area.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Who can prepare a neighbourhood plan?

In a parished area, the parish or town council is the qualifying body. Elsewhere a neighbourhood forum must be designated by the local planning authority, with a written constitution, membership open to residents, workers and elected members for the area, and at least 21 members. Designation lasts five years and is preceded by public consultation.

Can a neighbourhood plan stop housing being built?

No. A plan has to meet the basic conditions, which include general conformity with the strategic policies of the development plan and contributing to sustainable development. A plan proposing fewer homes than the strategic policies require will not survive examination. What a plan can do is influence where development goes and what it looks like.

What is Local Green Space and how do we designate it?

It is a designation made through a local or neighbourhood plan giving protection consistent with Green Belt policy. The National Planning Policy Framework requires the space to be close to the community it serves, demonstrably special with particular local significance, and local in character rather than an extensive tract of land. Evidence each space separately.

Which consultation stage should I respond to?

Regulation 14, the pre-submission consultation run by the group for at least six weeks. That is when policy wording can still be changed. Regulation 16 publicity, run by the council, feeds representations to an independent examiner who is testing the submitted plan against the basic conditions rather than redesigning it.

How much weight does a neighbourhood plan carry before the referendum?

Weight increases as the plan advances. A submitted plan carries some, and a plan that has passed examination and awaits its referendum can carry substantial weight. Once made, it forms part of the development plan and applications are decided in accordance with it unless material considerations indicate otherwise.

Sources and further reading

neighbourhood plancommunitylocal green spaceconsultationdevelopment plan

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Neighbours, Objections and Community

View all →
Neighbours, Objections and Community7 min read

Reporting a suspected breach and what enforcement can do

Most things that look unauthorised are not a breach. Where there is one, enforcement is discretionary, and evidence is what moves a case forward.

Read article →
Neighbours, Objections and Community7 min read

Objecting effectively on overlooking and loss of privacy

Loss of privacy is a material consideration, but only a measured objection gives the case officer something to write down. Where to measure, what to cite and what to ask for.

Read article →
Neighbours, Objections and Community7 min read

Reading a section 106 agreement as a resident

The schedules at the back of a section 106 deed carry the promises, and the trigger wording decides when they fall due. A play area tied to the final dwelling can wait a decade lawfully.

Read article →
Neighbours, Objections and Community6 min read

Which neighbours must be told about an application

No council has to write to every neighbour. For most applications a single site notice satisfies the publicity duty, and the definition of an adjoining owner is narrower than people expect.

Read article →
Neighbours, Objections and Community7 min read

Licensing and planning are separate decisions

Licensing and planning run in parallel with different criteria, different objectors and different deadlines. A point made in the right language to each carries far more weight.

Read article →
Neighbours, Objections and Community6 min read

Construction noise, hours and dust: who to contact

Construction hours come from planning conditions, but the noise and dust themselves are controlled by pollution law. Sending the complaint to the wrong team costs weeks.

Read article →