Neighbours, Objections and Community

Questions to ask at a developer consultation event

6 min readBy PlanScope Editorial Team

A pre-application exhibition is the last point at which a scheme changes without great cost. What to ask about parameter plans, access and drainage, and why you must comment again later.

The most useful thing to know before walking into a developer's consultation event is that anything you say there is not an objection. Comments made at an exhibition, on a feedback card or through a project website go to the developer, not to the council. If you want your view to count in the decision, you have to say it again during the statutory consultation period once the application is registered, which is normally 21 days.

With that settled, the event becomes worth attending for a different reason. It is the one point where the scheme can still change without great cost, and the people standing by the boards usually have the answers that the eventual application documents will bury.

What the event is for

Pre-application community engagement in England is largely voluntary. It is encouraged by national policy and by each council's own statement of community involvement, which every local planning authority has to prepare under section 18 of the Planning and Compulsory Purchase Act 2004 and which sets out how it will involve people in planning decisions.

Confusingly, the applicant submits a document with a very similar name. A Statement of Community Involvement accompanying a planning application is the developer's account of who they consulted, what was said and what changed as a result. That document, not the council's policy, is what the case officer reads.

So the event has two purposes, and they are not the same. The developer wants to identify the objections that could cost them at committee. You want the information that lets you make a specific, evidenced representation later.

Asking about parameters rather than pictures

The images on the boards are usually illustrative. On an outline application, what actually gets permitted is the set of parameter plans: maximum and minimum building heights, development zones, access points, land use areas and the amount of floorspace or the number of homes.

Ask which application type is coming. Outline with all matters reserved, outline with access to be determined, full, or a hybrid of the two. Then ask what will be fixed by the parameter plans, because everything else can change at reserved matters without any further public consultation on the principle.

The follow-up question is the one that produces useful answers. Ask what the maximum height shown on the parameter plan is in metres above ordnance datum, not in storeys. Storeys are elastic. Levels are not.

If the answer is a range, ask what would have to happen for the top of that range to be built, and what the applicant would have to do to exceed it.

Access, drainage and phasing

These three topics generate most of the lasting effects on a neighbourhood, and they are the ones where a specific question gets a specific answer.

On access, ask where every vehicle access point is, whether any is for construction only, what the construction traffic route is, and whether the highway authority has already commented. Ask whether any land outside the applicant's ownership is needed to form the access or the visibility splays. That last question occasionally produces a very interesting pause.

On drainage, ask what the surface water discharge rate is in litres per second, where the water goes, and whether the lead local flood authority has seen the strategy. If the site currently floods, say when and how deep, and ask whether that is in their model.

On phasing, ask how many phases, in what order, over what period, and what the construction working hours would be. Ask whether the play space and landscaping are in the first phase or the last. They are almost always in the last.

How responses will be recorded

Three questions, and write the answers down with the date.

  1. Will individual comments be recorded verbatim, summarised, or counted by theme?
  2. Will the feedback report be published, and will people who comment receive a copy?
  3. Who is the named person responsible for the consultation, and what is their email address?

The honest answer to the first is usually that comments are grouped by theme. That is not sinister, but it does mean a distinctive point made once is likely to disappear into a category called "highways concerns". Submitting the same point in writing, in your own words, keeps it identifiable.

Our note on the community feedback section of a statement of community involvement sets out what that document is supposed to contain, which is useful to know before you read one.

Whether the design can still change

Ask directly: what has already been fixed, and by what? Land contracts with conditional obligations, an existing outline permission, a site allocation in the local plan, or an agreed position with the highway authority all narrow what is actually open.

Then ask the more revealing version of the question. What changed after the last consultation event, if there was one, and what would have to be true for the layout to change again? A team that can name a specific change is engaging. A team that says everything is still on the table at an event three weeks before submission is not.

Be realistic about scale. Reducing 180 homes to 60 is not a consultation outcome. Moving a bin store away from a boundary, adding a pedestrian link, changing a boundary treatment, relocating an access, shifting the tallest block to the interior of the site, retaining a tree group: those things do change, and they change at this stage rather than later.

Following up in writing

Send a short email the same week, to the named contact, listing your questions and any answers you were given. Ask for the outstanding ones in writing. Keep a copy.

Copy in your parish or town council if there is one, because parish councils are consulted formally on applications and a coordinated local position carries more weight than fifteen separate letters that make the same point.

When the application is submitted, check the statement of community involvement against your own record of what you were told. Differences between the two are legitimate material to put before the case officer, and they are noticed.

If the council already holds information about the site that has not been published, such as correspondence with the applicant or a consultee response, the Environmental Information Regulations 2004 provide a route to it. Our guide to environmental information requests in planning explains how to frame one so it is not refused on cost grounds.

Turning the answers into a representation

A representation that works is short, specific and tied to planning matters. Highway safety, drainage and flood risk, loss of daylight, noise, design and character, heritage impact, the effect on protected trees and the development plan itself are all material. Loss of a view, the effect on property values and the identity of the developer are not.

Where your concern is highways, our guide to objecting on highway safety without being an engineer sets out what evidence actually moves a case officer. The same approach works for drainage: dated photographs of standing water, with locations marked on a plan, beat any amount of assertion.

Understanding which technical documents a scheme of this type has to produce also tells you where to look for the weaknesses, and the full list of report types is a reasonable starting point for that.

This is general guidance, not legal advice. Check the consultation arrangements and deadlines with your local planning authority, because they vary and they are strictly applied.

Frequently asked questions

Does commenting at a developer exhibition count as an objection?

No. Comments made at an event, on a feedback card or through a project website go to the developer, not to the council. To influence the decision you have to make a representation during the statutory consultation period after the application is registered, which is normally 21 days. Attending the event is still worthwhile, for the information rather than the record.

What is the difference between the council's statement of community involvement and the applicant's?

The council's statement of community involvement is a policy document prepared under section 18 of the Planning and Compulsory Purchase Act 2004 setting out how it involves people in planning decisions. The applicant's document of the same name accompanies an application and records who was consulted, what was said and what changed. The case officer reads the second one.

What are parameter plans and why do they matter?

On an outline application, parameter plans fix what is actually permitted: maximum and minimum heights, development zones, access points, land use areas and quantum. The illustrative layouts and images on the boards are not binding. Ask for maximum heights in metres above ordnance datum rather than in storeys, because storeys are elastic.

What should I ask about drainage at a consultation event?

Ask what the proposed surface water discharge rate is in litres per second, where the water discharges to, and whether the lead local flood authority has reviewed the strategy. If the area already floods, describe when and how deep, and ask whether that history is reflected in their model. Dated photographs with locations marked carry real weight later.

What kinds of change actually result from consultation?

Detail rather than principle. Moving a bin store away from a boundary, adding a pedestrian link, relocating an access, changing boundary treatments, moving the tallest block into the site interior and retaining a tree group are all realistic. A reduction in the number of homes from 180 to 60 is not a consultation outcome.

Sources and further reading

consultationcommunity involvementobjectionspre-applicationparish council

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Neighbours, Objections and Community

View all →
Neighbours, Objections and Community7 min read

Asking the council to make an Article 4 direction

Councils move slowly on Article 4 because of compensation liability. A request that acknowledges it, and asks for a twelve month deferred start, gets a better hearing.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a change of use that needs no permission

Moving between two uses in the same class is not development, so no application exists. The remedies people reach for apply to permitted development rights, which is a different thing.

Read article →
Neighbours, Objections and Community7 min read

Petitions and template objections: how officers treat them

Public opposition is not itself a material consideration. The matters the opposition is about, if they are planning matters, are. That distinction decides whether a campaign changes anything.

Read article →
Neighbours, Objections and Community9 min read

Reading a viability assessment as a community objector

A viability assessment is an argument, not an accounting exercise. National guidance puts the burden on the applicant, and every assumption in the document can be tested.

Read article →
Neighbours, Objections and Community8 min read

Objecting to a scheme on an allocated site

On an allocated site, objecting in principle gets logged and set aside. The objections that change schemes aim at everything the allocation left open.

Read article →
Neighbours, Objections and Community6 min read

When a scheme is built differently from the approved plans

The drawings you objected to may not be the approved ones. How to check the register, report a departure usefully, and what remedies the council actually has.

Read article →