London

Industrial capacity in London: measuring no net loss

7 min readBy PlanScope Editorial Team

A London scheme can add industrial floorspace and still lose capacity once clear height, yard depth, vehicle access and permitted hours are counted. Here is how to measure and evidence all five.

No net loss of industrial capacity is a capacity test, not a floorspace test, and that distinction decides whether a London redevelopment scheme is acceptable. A proposal can replace 6,000 square metres of single-storey warehousing with 7,500 square metres of stacked industrial units and still lose capacity, because the yard has gone, the clear internal height has dropped from 9 metres to 5.5 metres, and an articulated lorry can no longer reverse onto a dock. Floorspace went up. Capacity went down.

The policy framework is set out in industrial land in London: no net loss and SIL policy. What follows is how to measure and evidence the capacity itself.

What capacity actually consists of

Industrial capacity has five components, and a scheme has to account for all five rather than only the first.

Floorspace, measured as gross internal area, by use class. Clear internal height to the underside of the lowest structural member or service, which determines racking and plant. Yard and service area, measured in square metres and in usable depth. Vehicle access, expressed as the largest vehicle that can enter, manoeuvre and leave, with tracking to prove it. And operational freedom, meaning hours of operation, noise headroom, loading at night, and whether the use can expand without consent.

A replacement scheme that reports only the first of those has not addressed the policy. A borough officer reading it will ask about the other four in the first round of comments, and the answer will often require a redesign rather than an addendum.

Floor loading belongs in the same list on multi-storey schemes. An upper floor designed to 15 kilonewtons per square metre serves light industrial and storage. One designed to office loadings does not serve either, whatever the floorspace schedule says.

Measuring floorspace against capacity

Set out the comparison as a table, existing against proposed, with every component in it.

Component Existing Proposed Net position
Industrial gross internal area by use class Measured from survey Measured from drawings Floorspace change
Clear internal height, lowest and typical Measured on site Scheduled per unit Height change
External yard area and minimum usable depth Measured Measured Yard change
Largest vehicle accommodated, with swept paths Observed and tracked Tracked Access change
Dock levellers, loading doors and their type Counted Counted Loading change
Permitted hours and any noise condition From the planning history Proposed Operational change

Take the existing position from a measured survey and the planning history rather than from an agent's particulars. Vacancy is not evidence of low capacity, and a unit standing empty because the lease ended still has whatever capacity its fabric gives it.

The units matter in the net column. Expressing a yard loss as a percentage hides it. Expressing it as a reduction from 32 metres to 18 metres of usable depth makes the operational consequence legible, because 18 metres will not take an articulated vehicle plus a loading apron.

Intensification and co-location, in practice

The policy answer to development pressure on industrial land is intensification, co-location or substitution. Each carries a different evidence burden.

Intensification means more capacity on the same site, usually through multi-storey industrial, deck access, or a reduction in surface parking in favour of yard. It works where the site is deep enough for a ramp or a goods lift of the right capacity, and where the covenant strength of likely occupiers supports the build cost. Ramps eat footprint: a ramp to a first-floor service deck for articulated vehicles needs a long run at a shallow gradient, and on a constrained site the ramp consumes the capacity the extra floor was meant to deliver.

Co-location means industrial and residential on the same site. It is permitted in principle in some categories of industrial land and tightly restricted in others, so establish the designation of the site before designing anything.

Substitution means delivering replacement capacity elsewhere, secured by obligation, with the replacement provided before or at the same time as the loss. The evidence burden here is the hardest, because the receptor site has to be identified, deliverable and of equivalent capacity on every component in the table above.

Design-led capacity testing of the kind described in optimising site capacity under London Plan policy D3 is the right tool for all three, applied to industrial floorspace instead of to homes.

Designated locations and the tighter test

Designation drives everything. Strategic Industrial Locations carry the strictest protection, and non-industrial uses in them are expected to be refused other than small-scale ancillary provision. Locally significant sites carry a protection set by the borough, and non-designated industrial sites carry the weakest, though still meaningful, protection.

Three practical points follow.

Confirm the designation from the adopted local plan policies map and the London Plan, not from a site-finding platform or a planning history. Designations change at plan review and the boundaries are drawn more tightly than people assume.

Where a site straddles a designation boundary, the test applies to the designated part and the arithmetic has to be presented separately for it.

Where the borough sits in a category that limits the release of industrial land, the no net loss requirement is the start of the analysis rather than the end, because the borough's own plan may require capacity to be provided rather than merely retained.

Servicing and amenity in a co-located scheme

Co-location fails on servicing far more often than on principle.

Separate the two uses at ground level completely. A shared vehicle access between an industrial yard and residential parking generates conflict that no management plan resolves. Separate accesses, separate pedestrian routes, and a service yard that no resident has to cross.

Acoustic separation has to work for a 24-hour operation, which means designing for night-time loading, refrigeration plant, reversing alarms and roller shutters. The agent of change principle puts the mitigation burden on the incoming sensitive use, so the residential element pays for the glazing, the ventilation strategy and the facade build-up. A Noise Impact Assessment assessing the industrial use at its permitted intensity, rather than at the intensity of whatever happens to occupy it today, is the document that makes or breaks the scheme.

Mechanical ventilation becomes unavoidable where windows cannot be opened, which then feeds overheating and energy.

Odour and air quality follow from the industrial use class. A scheme that permits B2 general industrial next to flats needs to show that any future B2 occupier can operate, not just that the current tenant can.

Where the residential element reaches the relevant height or scale, Planning Gateway One applies and a Fire Statement is required at application stage. A fire statement has to be prepared by someone with the necessary fire engineering competence, and an AI-assisted draft is a starting point for that person rather than a substitute.

Assembling the employment land evidence

Six documents carry the case, and the first is the one applicants most often skip.

  1. A measured survey of the existing buildings and yard, with the capacity table filled in from it.
  2. The planning history, including hours and noise conditions, because those define the capacity the policy protects.
  3. An Employment Land Assessment setting the site in the borough's industrial land supply, using the borough's own evidence base and the London-wide demand studies rather than an in-house market view.
  4. Marketing evidence where release is sought, covering a realistic period at realistic terms, with the agent's instructions attached. Marketing at a rent no industrial occupier would pay proves nothing.
  5. Swept path analysis for the largest vehicle on both the existing and the proposed arrangement.
  6. A delivery and servicing strategy, and on a substitution case, the obligation structure and the receptor site evidence.

Write the conclusion as a comparison rather than as an assertion. "The scheme provides 7,500 square metres against 6,000 square metres existing" invites the capacity question. "The scheme provides 7,500 square metres at 8.5 metres clear height with a 25 metre yard, against 6,000 square metres at 9 metres with a 32 metre yard, and the net capacity position is set out in Table 3" answers it.

Enter your postcode on PlanScope to see which reports a site of this kind is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does more floorspace mean no net loss of industrial capacity?

Not on its own. Capacity has five components: floorspace, clear internal height, yard area and usable depth, the largest vehicle that can be accommodated, and operational freedom including permitted hours. A stacked scheme can add gross internal area while losing yard depth and height, which reduces capacity. Present all five, existing against proposed.

How should existing capacity be measured?

From a measured survey of the buildings and yard, plus the planning history for hours and noise conditions. Agents' particulars and vacancy rates are not evidence of capacity, because an empty unit retains whatever capacity its fabric and access give it. Record clear height to the lowest structural member or service rather than to the ridge.

What is the difference between intensification, co-location and substitution?

Intensification delivers more capacity on the same site, usually through multi-storey industrial. Co-location puts industrial and residential on the same site, which is restricted or excluded depending on designation. Substitution provides replacement capacity elsewhere, secured by obligation, and carries the heaviest evidence burden because the receptor site must be identified and deliverable.

Who pays for mitigation in a co-located scheme?

The agent of change principle places the burden on the incoming sensitive use, so the residential element funds the glazing, ventilation strategy and facade build-up needed to live beside a 24-hour industrial operation. Assess the industrial use at its permitted intensity rather than at the intensity of the current tenant, because the tenant can change without consent.

What marketing evidence supports a release of industrial land?

A realistic period at realistic terms, with the agent's instructions attached so the asking rent and the marketing route can be checked. Marketing at a rent no industrial occupier would pay, or through channels industrial occupiers do not use, proves nothing. Set the evidence against the borough's own industrial land supply study rather than an in-house view.

Sources and further reading

londonindustrial landlondon planco-locationemployment landagent of change

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in London

View all →
London7 min read

Design review panels and the weight of their advice

A design review panel advises, it does not decide. What decides the outcome is whether the panel report was tied to policy and whether you answered it.

Read article →
London7 min read

Inclusive design statements for London schemes

An inclusive design statement follows the user through the scheme rather than listing standards. Policy D5 and D7, evacuation lifts, wayfinding and the management plan.

Read article →
London6 min read

Waste capacity and borough apportionment in London

Policy SI 8 of the London Plan 2021 safeguards existing waste sites and apportions tonnage to each borough. Losing capacity means replacing it, measured at maximum throughput.

Read article →
London7 min read

The Thames Policy Area and riverside development

The constraints on a Thames-side site are knowable before anyone draws a plan. River prospects, wharf safeguarding, the raised defence level and the river works licence.

Read article →
London7 min read

Protected London squares under the 1931 Act

Planning permission does not authorise what the 1931 Act prohibits. What the schedules protect, the use and structure restriction, and the four consent regimes that overlap.

Read article →
London6 min read

Loss of existing homes and London Plan Policy H8

Policy H8 catches demolition, change of use and amalgamation alike. Report units, floorspace and habitable rooms separately, and build the condition case on measured evidence.

Read article →