Professionals and Qualifications

Keeping a competence file for condition discharge

7 min readBy PlanScope Editorial Team

When a condition says the work must be done by a suitably qualified person, the authority will ask who and why. Build the evidence file at appointment, not at discharge.

A competence file condition discharge submission succeeds or fails on documents you should have collected at appointment, not at the end of the job. When a condition says the works are to be carried out by a suitably qualified person, the authority is entitled to ask who that person was and what made them qualified. If the answer arrives two years later as a name and a job title, expect the discharge application to be refused and the fee to be lost.

What authorities ask for at discharge stage

A discharge application under Article 27 of the Development Management Procedure Order 2015 asks the authority to approve details reserved by condition. The fee is set nationally per request and is indexed, so check the current schedule before you submit. What the case officer actually does is read the condition, read your submission, and decide whether the submission answers every limb of the wording.

Where the condition names a standard of author, three things get checked. Who prepared the document, what their qualification or registration is, and whether the method they used matches the standard the condition cites. A verification report signed by a graduate engineer on a site where the condition requires a suitably qualified and experienced person working to BS 10175 will be queried, and the query will go to the consultant rather than to you, which costs weeks.

The irritating part is that authorities rarely say in advance what evidence they want. A short covering note that names the author, states their membership grade and registration number, attaches the current professional indemnity certificate and cross-refers the method to the cited standard answers the question before it is asked.

Which conditions trigger a competence question

Not all of them. The ones that do fall into a recognisable set, and you can usually spot them at decision stage from the wording.

Condition type Standard of author usually required
Contaminated land verification Suitably qualified and experienced person, methods to BS 10175
Biodiversity gain plan and habitat monitoring Competent person under the Environment Act 2021 regime
Protected species mitigation and clerk of works Licensed ecologist, with the licence class recorded
Arboricultural supervision and tree protection Arboricultural consultant working to BS 5837:2012
Acoustic verification after installation Acoustician applying BS 4142 or BS 8233
Fire strategy and later approvals Fire engineering competence under the Building Safety Act 2022 framework
Archaeological fieldwork and reporting Organisation working to CIfA standards
Travel plan monitoring Named travel plan coordinator

Two of these catch people out. The ecology ones, because the licence class determines what the person is allowed to do and a licence held by the consultancy is not a licence held by the individual on site. And the fire ones, because competence has to be demonstrated rather than asserted, and the Building Safety Regulator takes a different view of that from a planning case officer.

Documents to collect at appointment

Build the file as you appoint, not as you discharge. For each consultant whose work feeds a condition, collect the following and date-stamp them.

  1. A signed appointment or order setting out the scope, the deliverables and the standard to be applied.
  2. The named author's CV, with membership body, grade and registration or licence number.
  3. Evidence of any statutory licence or registration, including the licence number and its expiry.
  4. The current professional indemnity insurance certificate, with the limit, the basis of cover and the expiry date.
  5. A written statement of who will sign the report and who may sign in their absence.
  6. Any sub-consultant appointments, with the same information for each.

That last item is the one most often missing. A transport consultancy that subcontracts the traffic counts, or an ecology practice that buys in a bat specialist for a single visit, puts a second organisation's competence into your condition. The same applies to modelling work: who certifies a flood model is a question worth settling in the appointment rather than at discharge, and the accuracy standards behind a topographic survey determine whether downstream drawings can be relied on at all.

Keeping insurance certificates current

Professional indemnity cover is written on a claims made basis, meaning the policy in force when the claim is notified responds, not the policy in force when the work was done. So a certificate from the year of the report proves very little on its own.

Collect the certificate at appointment, then collect the renewal each year for as long as the consultant remains appointed, and ask for confirmation of run-off cover when the appointment ends. Check the limit against the risk: a limit expressed in the aggregate across all claims in a year is weaker than the same figure each and every claim, and on a scheme with several buildings that difference is real. Note whether the policy excludes anything you are relying on, because exclusions for fire safety advice and for cladding work became common after 2019 and a consultant can hold a valid certificate that does not cover the advice you need.

Recording who supervised what on site

Conditions requiring supervision are discharged on records, and the records have to be contemporaneous. A reconstructed log written up at the end is worth little and reads as such.

Keep a dated inspection record for each visit: who attended, their authority under any licence, which works were inspected, what was found, what was instructed and whether a hold point was released. Keep the toolbox talk register where the method statement requires operatives to be briefed. Photograph the installed detail rather than the finished surface, so that the root protection barrier, the gas membrane lap or the bat access point can be seen. Geotag or at least reference the photograph location, because a photograph of a membrane that could be anywhere proves nothing.

Where a licence is involved the ecologist's own records will also feed a return to Natural England, and the two sets should agree. Which bat licence class applies changes who may sign those records.

Handover to the next owner

Planning conditions run with the land. The person who sells a site with an undischarged condition sells the obligation, and the person who buys one inherits an enforcement risk they may not have priced. So the competence file is a disclosure document.

An illustrative example. A developer completes a 12 unit scheme with a landscape establishment condition, a bat monitoring condition running for five years and a contaminated land verification condition partly discharged. The site is sold to a management company on practical completion. Without the file, the management company cannot evidence who installed the bat boxes, cannot show the authority that the verification report was accepted, and has no contractual route to the ecologist. Three years later a breach of condition notice arrives and the records sit in a former employee's inbox.

Put the file into the sale pack alongside the health and safety file required under the Construction (Design and Management) Regulations 2015. For higher-risk buildings the same information feeds the golden thread under the Building Safety Act 2022, so structure it once and use it twice.

Retention period for the file

Match the retention to the liability rather than to the planning process. Contractual claims against consultants are generally limited to six years from breach under the Limitation Act 1980, or twelve where the appointment is executed as a deed, so six years from practical completion is the floor rather than the target.

Two things push it longer. The Building Safety Act 2022 extended the limitation period for claims under the Defective Premises Act 1972 to 15 years prospectively, which makes 15 years the sensible retention for anything touching dwellings. And planning enforcement time limits were changed by the Levelling-up and Regeneration Act 2023, with the commencement position worth checking rather than assuming, so a condition breach can be enforced for longer than the old four year rule suggested. Keep the file for the life of the longest obligation in it, and for a monitoring condition that runs 30 years under the biodiversity gain regime, that is a very long time.

Collecting this at appointment costs almost nothing. Reconstructing it later is where the money goes. You can see which report types carry a professional requirement before you appoint anyone, and the professional review route is how a draft gets signed off by someone whose competence the authority will accept.

This is general guidance, not legal advice. Check condition wording and evidence expectations with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Which planning conditions require evidence of competence?

Contaminated land verification, biodiversity gain monitoring, protected species mitigation, arboricultural supervision, acoustic verification, fire strategy work, archaeological fieldwork and travel plan monitoring are the common ones. The wording usually says suitably qualified person, competent person or licensed, and names a standard such as BS 10175 or BS 5837:2012.

Does a consultancy holding a licence mean the person on site is licensed?

No. Protected species licences attach to named individuals, and the class of licence determines what each person may do. A consultancy letterhead is not evidence. Ask for the licence number, the class and the expiry date of the individual who will actually attend, and record which operations each person is authorised to carry out.

How long should professional indemnity certificates be kept?

Collect the certificate at appointment and each renewal while the appointment runs, then ask for confirmation of run-off cover when it ends. Cover is written on a claims made basis, so the policy in force when a claim is notified responds. Check the limit, whether it is aggregate or each and every claim, and the exclusions.

Who is responsible for conditions after a site is sold?

Conditions run with the land, so the new owner inherits the obligation and the enforcement risk. The competence file should be handed over in the sale pack alongside the health and safety file required under the Construction (Design and Management) Regulations 2015, and for higher-risk buildings it feeds the golden thread.

How long should the competence file be retained?

At least six years from practical completion to match the ordinary contractual limitation period, or twelve where appointments are deeds. For anything touching dwellings, 15 years is sensible because the Building Safety Act 2022 extended the limitation period for Defective Premises Act claims. Biodiversity monitoring obligations can run for 30 years.

Sources and further reading

planning conditionscondition dischargecompetenceprofessional indemnityconsultants

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications7 min read

Structural and geotechnical sign off for a planning case

Structural and geotechnical reports are judged on whether the author's competence is on the face of the document. The routes, the Eurocode 7 categories and reliance.

Read article →
Professionals and Qualifications7 min read

Who signs off a materials management plan

Reusing excavated soil on site depends on a declaration signed by a registered qualified person. Get the appointment and the timing wrong and the material becomes waste.

Read article →
Professionals and Qualifications7 min read

Who can author a BS 5837 arboricultural report

There is no statutory licence for arboriculturists. Councils test competence through registers, qualification levels and the quality of the method statement, and they do reject reports.

Read article →
Professionals and Qualifications7 min read

What to ask about a consultant's last appeal appearance

Ask which appeal they last gave evidence at and what the inspector said about it. Unlike most pitch claims, the answer can be verified in about twenty minutes.

Read article →
Professionals and Qualifications7 min read

How to check a report against the standard it cites

Reports that cite a British Standard but do not follow it fail in predictable places: wrong edition, skipped normative clause, missing correction, withheld raw data.

Read article →
Professionals and Qualifications7 min read

Revision control across a consultant team

Planning conditions bind named documents at named revisions, so a wrong revision in the submitted set means a permission for a scheme you did not design. Here is the discipline that prevents it.

Read article →