Viability, Obligations and Commercial

Land value expectations and viability circularity in plans

7 min readBy PlanScope Editorial Team

Policy requirements are set on policy-compliant land value assumptions, but land bought under the previous plan keeps arriving for years afterwards. How that lag plays out in viability evidence.

Land value expectation is the hinge on which most local plan viability arguments turn. National guidance says the price paid for land is not a justification for failing to comply with plan policy, and it directs that benchmark land value should normally start from existing use value plus a premium to the landowner rather than from a market price agreed in open competition. The reason is a circularity: if the policy burden a scheme can carry is derived from what developers pay for land, and what they pay reflects what they expect to get away with, the policy never bites.

Plans try to cut that loop by setting requirements at plan-making stage on policy-compliant land value assumptions, then treating compliant applications as viable. In practice the loop reasserts itself for several years after adoption, because land bought or optioned under the previous plan is still coming forward.

Why land price adjusts to policy, eventually

Residual land value is what is left after build cost, finance, profit and policy obligations are taken off gross development value. Raise the affordable housing requirement or add a carbon offset and the residual falls, so the price a rational purchaser can pay falls with it. That adjustment is the mechanism the plan-led system relies on, and over a full market cycle it broadly happens.

It happens unevenly. Landowners with no holding cost and no deadline simply wait. Promoters with option agreements signed at a percentage of market value have an incentive to argue the policy down rather than accept a lower price. And a vendor comparing a policy-compliant offer with a historic comparable from the same street will often conclude the lower offer is the bidder's problem.

So adjustment runs on a lag measured in years, not months. Any viability case made in the first three or four years after a plan is adopted sits inside that lag.

The circularity in market-based evidence

A market-value approach to benchmark land value asks what the site would fetch. The difficulty is that transactional comparables embed whatever policy outcome the purchaser expected, including the expectation of negotiating affordable housing down. Using them unadjusted imports the old policy into the new assessment.

Guidance addresses this by requiring market evidence to be adjusted to reflect policy-compliant assumptions, which in principle solves it and in practice produces a dispute about the size of the adjustment. The honest position is that the adjustment cannot be derived from the comparables themselves, because the comparables are the thing being adjusted. It has to be reasoned from the policy difference, and reviewers should expect to see that reasoning rather than a percentage asserted at the end of a table.

Site assembly adds a further distortion. Where a scheme depends on buying in a ransom strip, an access or a neighbouring yard, the price paid includes marriage value: the uplift created by combining interests. That premium is real money and it is also a product of the assembly rather than of the land's existing use, so including it in benchmark land value inflates the baseline and reduces the apparent capacity for obligations. Separate it out and show it as an acquisition cost if you want the figure to survive scrutiny.

How the guidance tries to break the loop

Four devices do the work.

  1. Existing use value plus a premium as the default route to benchmark land value, with alternative use value admitted only where there is evidence the alternative is deliverable.
  2. Viability testing at plan-making stage, on a typology basis, so that the policy requirements have already been tested for deliverability.
  3. A presumption that a scheme complying with up-to-date plan policies is viable, so that an application-stage assessment is the exception.
  4. Transparency, with viability assessments published in full, so that the same arguments cannot be made privately to different authorities.
Benchmark land value route When guidance supports it Main weakness in evidence
Existing use value plus premium Default for most sites The premium percentage is judgement, and ranges widely
Alternative use value Where the alternative use is deliverable and evidenced Often asserted with no permission or demand evidence
Market value adjusted for policy Where comparables exist The adjustment cannot be derived from the comparables
Price actually paid Not a justification for non-compliance Imports the purchaser's own policy assumptions

The presumption in favour of compliant schemes being viable is the device most often overlooked by applicants. If you are complying, say so and do not submit an assessment at all, because volunteering one invites a review of figures nobody needed to see.

Options and contracts signed under the old policy

This is the live problem. A promoter holds an option struck in 2021 at ninety per cent of market value with a minimum price, the plan was adopted in 2025 with a higher affordable requirement, and the scheme no longer works at the minimum. The promoter's commercial problem is real. Its planning weight is close to zero.

The reason is structural: the contract is a private arrangement between two parties, neither of whom the planning system owes a return. Treating the minimum price as a fixed input would make every obligation negotiable by the simple expedient of overpaying. Inspectors say this in different words fairly regularly.

What does carry some weight is evidence that no landowner in the relevant market will transact at a policy-compliant price, with the result that allocated sites stall. That is a plan-making argument about deliverability rather than an application argument about one site, and it belongs in a local plan examination or a five-year review, supported by evidence across multiple sites.

Transitional arguments and the weight they get

Transitional claims come in three shapes, with descending success.

The strongest is a timing argument: the application was submitted before adoption, the development plan at the time set lower requirements, and the determination has been delayed by the authority. Section 38(6) of the Planning and Compulsory Purchase Act 2004 still requires determination in accordance with the plan as it stands at the decision date, so this is an argument about weight in the balance rather than a right.

The middle case is a part-built or phased scheme where earlier phases were consented under the previous policy and the later phases are being brought forward on the same masterplan. Consistency arguments have some traction here, particularly where a section 106 already governs the site.

The weakest is pure hindsight: we paid too much. Where a client insists on running it anyway, run it alongside a review mechanism offer instead of in place of one, because a late-stage review gives the authority a way to say yes without conceding the principle. The drafting of those mechanisms matters more than the headline offer, as our note on affordable housing review mechanisms sets out.

Evidence that adjustment has happened

If you are the authority, or you are defending a plan requirement at examination, the evidence that land values have adjusted is specific and gettable. Look for transactions completed after adoption on sites with a known policy position, option agreements renegotiated downwards, allocated sites coming forward at compliant levels, and sale particulars that quote a policy-compliant scheme capacity rather than an optimistic one.

If you are the applicant, the mirror evidence is a record of failed negotiations with named stages and dates, marketing of the site at a compliant price with no offers, and a build cost position supported by a measured estimate rather than a published index applied to a gross area. A Viability Assessment that includes the negotiation history reads very differently from one that presents a single appraisal.

Appeal is where both sets of evidence get tested, and inspectors are willing to reopen inputs the parties thought were agreed, which we cover in when an inspector reopens viability at appeal.

Advising a client mid-cycle

Three practical positions hold up. First, price new acquisitions on the adopted policy and nothing softer, including any emerging requirement at an advanced stage of examination. Second, where a site is already held at an unaffordable price, treat the gap as a commercial loss to be managed through phasing, product mix or a renegotiated option rather than through a planning argument. Third, if an assessment is unavoidable, publish it, keep the inputs conventional, and put the contested judgement in one place where it can be argued about openly.

The uncomfortable part of this advice is that it sometimes means telling a client their land is worth less than they paid. Saying it early costs a difficult meeting. Saying it after an eighteen-month viability dispute costs the difficult meeting plus the fees.

Viability work is a report type where councils expect a suitably qualified author, and professional review is strongly advised before submission. PlanScope drafts the planning narrative and the Affordable Housing Statement structure around a valuer's figures rather than producing the appraisal itself. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. See PlanScope pricing if you are budgeting a submission pack.

Frequently asked questions

Is the price paid for land a reason to reduce affordable housing?

No. National viability guidance is explicit that the price paid for land is not a justification for failing to comply with relevant plan policies. A purchaser who overpaid has a commercial problem rather than a planning argument, and treating the purchase price as a fixed input would make every obligation negotiable by overpaying.

What is benchmark land value based on?

The default route is existing use value plus a premium to the landowner. Alternative use value may be used where the alternative is deliverable and evidenced. A market-value approach is permitted but the comparables must be adjusted to policy-compliant assumptions, and the adjustment has to be reasoned from the policy difference.

Does marriage value belong in benchmark land value?

Generally no. Marriage value is the uplift created by combining separate interests, such as buying a ransom strip or an access. It is a product of the assembly rather than of the land's existing use, so including it inflates the baseline. Show it separately as an acquisition cost if you want the figure to survive scrutiny.

Do I need a viability assessment if my scheme complies with policy?

Usually not. Guidance works on the basis that a scheme complying with up-to-date plan policies should be assumed viable, because the requirements were tested at plan-making stage. Submitting an assessment you do not need opens your figures to review, so state compliance and leave the appraisal out.

Can I argue that my option agreement predates the new policy?

You can argue it, and it carries little weight. The option is a private arrangement and the decision must still be taken in accordance with the development plan as it stands at the decision date. A stronger version is a plan-making argument that allocated sites across the area are stalling, supported by evidence from several sites.

Sources and further reading

viabilitybenchmark land valueaffordable housinglocal plansection 106development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial8 min read

Marriage value and site assembly in a viability appraisal

Assembly costs are real, but most of them do not reduce what a scheme can contribute. Where acquisition costs, ransom premiums and created marriage value each belong in the appraisal.

Read article →
Viability, Obligations and Commercial7 min read

Varying a planning obligation after five years

After the five year relevant period, a statutory application under section 106A replaces negotiation, and a refusal can be appealed under section 106B. What the authority can decide and what it cannot.

Read article →
Viability, Obligations and Commercial7 min read

Social infrastructure contributions and how they are justified

Contribution requests are built from a yield factor, a capacity claim and a published cost. The arithmetic is usually right, so the argument belongs on the capacity evidence and the statutory tests.

Read article →
Viability, Obligations and Commercial7 min read

Pooling restrictions and clawback in planning obligations

Regulation 123 and the five obligation pooling cap went in September 2019. What remains is the statutory test in regulation 122, the infrastructure funding statement, and careful drafting against duplication.

Read article →
Viability, Obligations and Commercial8 min read

Indexation of section 106 contributions and which index applies

The index family and the base date decide how far an indexed contribution moves. Name the series exactly, set the base date to the prices the figure is expressed in, and recalculate every demand.

Read article →
Viability, Obligations and Commercial8 min read

Phasing a scheme to manage section 106 triggers

Phasing moves when obligations fall due rather than how much they total. Define phases by land parcel, build in a revised phasing plan mechanism, and tie affordable delivery to occupation within each phase.

Read article →