Use Classes and Change of Use

Losing a community facility: Class F2 and local protection

8 min readBy PlanScope Editorial Team

Class F2 uses have very limited change rights, so most losses need a full application. The policy tests, the marketing evidence to interrogate, and what an ACV listing really does.

A loss of community facility planning application turns on two things: whether the use falls within Class F2 of the Use Classes Order, and what the adopted local plan says about losing it. Class F2 covers small essential shops, halls and meeting places for the local community, outdoor sport and recreation areas, and swimming pools and skating rinks. Uses in F2 have very limited rights to change to anything else, which is deliberate, and it means most proposals to convert or redevelop them need a full planning application that neighbours can comment on.

That application is where the argument happens. Not at the point the building is sold, and not when the closure notice goes up in the window.

What Class F2 covers and the floorspace threshold for shops

Class F2 was created in the 2020 reform of the Use Classes Order, and it has four limbs.

The first is a shop mostly selling essential goods, including food, to visiting members of the public, where the premises cover no more than 280 m2 and there is no other such facility within 1,000 metres. Both conditions have to be met, which makes this the most precise definition in the whole Order. A village shop with a floor area of 300 m2 is not in F2, and neither is one with another shop 800 metres down the road.

The second limb is a hall or meeting place for the principal use of the local community. Village halls, church halls used for community activity and community centres sit here.

The third is an area or place for outdoor sport or recreation, excluding anything involving motorised vehicles or firearms. The fourth is an indoor or outdoor swimming pool or skating rink.

Measure the floor area and check the 1,000 metre test before anything else, because a shop that falls outside F2 is almost certainly in Class E, with all the flexibility that brings. Our note on Class F2 and the shop threshold works through that measurement in detail.

Why F2 uses have limited change rights

Class E was designed to be flexible. Class F2 was designed not to be. Movement within Class E is not development at all, so a shop can become an office or a gym without an application. Nothing comparable exists for F2.

The permitted development changes available from Class F2 are narrow, and the schedule that contains them has been amended repeatedly, so check Part 3 of Schedule 2 of the General Permitted Development Order as it stands rather than relying on a summary.

One exclusion is worth knowing because it comes up constantly. The prior approval route from commercial premises to dwellinghouses, Class MA, applies to Class E uses. It does not reach Class F1 or F2, so a village hall cannot be converted to flats through that route, as our notes on Class MA prior approval and Class F1 uses explain.

Pubs sit outside all of this. Drinking establishments are sui generis rather than F2, and since 2017 they have had no permitted change rights and their demolition needs planning permission.

Local plan policies protecting community facilities

The national framework supports the retention of community facilities, and the working tests are in the adopted local plan. Policies vary, but the pattern is consistent enough to predict.

Most such policies allow loss only where the applicant demonstrates one or more of the following:

  1. The facility is no longer needed, judged against the catchment it serves and the alternatives within a reasonable distance.
  2. It is not viable in its current use, and could not be made viable.
  3. It has been marketed for an alternative community use, for a specified period, without a reasonable offer.
  4. Equivalent or better replacement provision is available, or will be provided and secured.

Read the policy wording closely to see whether the tests are cumulative or alternative. A policy that says loss will be permitted only where the facility is no longer needed and has been marketed is much harder to satisfy than one offering a choice of routes. This distinction is where these applications are won and lost, and it is frequently misread by applicants and objectors alike.

Neighbourhood plans matter here too. Where a neighbourhood plan has been made, its policies form part of the development plan, and community facility protection is one of the things neighbourhood plans do most often.

Marketing evidence councils ask for

Marketing evidence is the most contested part of these applications, and it is also the easiest for a community group to scrutinise, because it is factual.

What a council should be looking for is continuous marketing for the period the policy specifies, through an agent with relevant experience, at a price supported by an independent valuation for the existing use rather than for the redevelopment value. Particulars should have been on recognised property portals and visible at the premises. There should be a schedule of every enquiry received, with dates and the reason each did not proceed.

Three weaknesses appear over and over. Marketing at a price set by hope-value for residential development, which deters any community buyer. Marketing that stopped and restarted, so the continuous period was never achieved. And a complete absence of any record of enquiries, which makes the assertion of no interest unverifiable.

If you are objecting, ask for the marketing particulars, the valuation and the enquiry schedule. If they are not in the application documents, say so in your representation and ask the case officer to obtain them.

Assets of community value and the separate regime

Listing a building as an asset of community value is a separate process under Part 5 of the Localism Act 2011, and it is worth understanding what it does and does not do.

A local group can nominate a building or land used for social wellbeing or social interests. If the council lists it, the owner cannot dispose of it without triggering a moratorium: an initial interim period during which a community group can express an interest, and a longer full moratorium giving time to prepare a bid.

What listing does not do is give a right of first refusal, or stop a sale to whoever the owner chooses once the moratorium ends. It buys time, not the building.

Its planning significance is separate again. Listing as an asset of community value is capable of being a material consideration in the determination of a planning application affecting the asset, and it is worth citing in a representation. It is not a trump card, and treating it as one weakens the rest of the objection.

Viability arguments for redevelopment

Where an applicant argues the facility is not viable, they should be producing evidence rather than assertion: trading accounts over several years, a schedule of outstanding repairs with costs, and an appraisal of what income the building could generate under reasonable management.

Councils can and do commission an independent review of viability evidence at the applicant's expense. Ask whether one has been carried out, and ask whether the appraisal has been published. Viability material submitted in planning applications is increasingly expected to be publicly available, and a confidentiality claim over the whole appraisal should be questioned.

The argument that a facility cannot pay its way under the current operator is different from the argument that it cannot pay its way at all. Watch for the slide between the two, particularly where the current operator has run the building down.

Replacement provision as mitigation

Where replacement provision is offered, the detail is everything. Equivalent capacity, equivalent accessibility by foot and public transport, equivalent hours of availability, and equivalent affordability to the groups that used the old facility.

Sequencing matters as much as specification. A replacement that opens two years after the original closes leaves a gap that can kill the groups it was meant to serve, and a section 106 obligation should tie the loss of the existing facility to the availability of the new one rather than to a date.

Ask to see the draft heads of terms. They are usually available on request even where the agreement has not been completed.

How a community group can engage effectively

Representations carry weight when they address planning matters and cite the policy. A practical approach:

  • Comment within the consultation period, usually 21 days, and put the policy number at the top of your letter.
  • Address the specific tests in the policy, one by one, and say which are not met and why.
  • Interrogate the marketing evidence rather than restating how valued the facility is.
  • Register interest in speaking at committee, and ask your ward councillor whether the application can be called in for committee determination rather than decided by officers.
  • Keep to material considerations. Loss of property value, competition between businesses and private disputes carry no weight, and including them dilutes the points that do.

A single well-evidenced objection from a group, referencing the policy tests and attaching the group's own usage records, is worth more than fifty identical form letters.

This is general guidance rather than legal advice. Use classification and local policy tests vary, so check the position with your local planning authority or a qualified professional before relying on it.

If you are on the applicant's side of this and scoping the documents, the full list of report types is a starting point. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does Class F2 include?

Four things. A shop mostly selling essential goods including food, where the premises are no more than 280 m2 and there is no other such facility within 1,000 metres. A hall or meeting place for the principal use of the local community. An area or place for outdoor sport or recreation, excluding motorised vehicles and firearms. And a swimming pool or skating rink.

Can a village hall be converted to housing under prior approval?

Not through the Class MA route. That prior approval applies to Class E commercial, business and service premises, and it does not reach Class F1 or Class F2. A conversion of a hall in Class F2 to residential use normally needs a full planning application, assessed against the local plan policy on the loss of community facilities.

What marketing evidence should a council require?

Continuous marketing for the period the policy specifies, through an agent with relevant experience, at a price supported by an independent valuation for the existing use rather than redevelopment value. Particulars on recognised portals, a sign at the premises, and a schedule of every enquiry with the reason it did not proceed.

Does listing an asset of community value stop a sale?

No. Listing under Part 5 of the Localism Act 2011 triggers a moratorium when the owner wants to dispose of the asset, giving community groups time to express interest and prepare a bid. It gives no right of first refusal and does not prevent a sale after the moratorium. It can be a material planning consideration.

How should a community group object most effectively?

Comment within the consultation period, quote the policy number, and work through each test in the policy saying which are not met and why. Interrogate the marketing and viability evidence rather than restating how valued the facility is. Ask about committee determination. Leave out property values and business competition, which carry no weight.

Sources and further reading

class f2community facilitiesuse classeslocalism actobjections

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Merging two dwellings and the loss of a unit

Combining two dwellings into one is not automatically a change of use. Whether permission is needed turns on local housing retention policy and the evidence you bring.

Read article →
Use Classes and Change of Use7 min read

Splitting one dwelling into two: the use position

Subdividing a dwelling always needs permission under section 55(3)(a). What decides the outcome is room sizes, refuse storage, cycle parking and overnight parking stress.

Read article →
Use Classes and Change of Use7 min read

Flats above shops and ancillary residential use

Accommodation above a shop is either ancillary to the Class E use or a separate dwelling. Access arrangements usually decide which, and moving between them is a material change of use.

Read article →
Use Classes and Change of Use7 min read

Change of use with no building work: what to submit

No building work does not mean no drawings. The permission defines a use within a planning unit, and only plans can define either, which is why most invalid applications fail here.

Read article →
Use Classes and Change of Use8 min read

Two planning units in one building: how to tell

A shop with a flat above may be one planning unit or two, and the answer changes which permitted development rights exist and whether a change of use needs permission at all.

Read article →
Use Classes and Change of Use7 min read

Conditions that tie a permission to one Class E sub-use

Class E lets a use move freely between shops, offices, gyms and clinics. A single condition on an old permission can take all of that away, and most buyers never read it.

Read article →