Ecology, BNG and Protected Species

Otter resting sites and development near rivers

7 min readBy PlanScope Editorial Team

Otters breed year round, so a holt or couch is protected whether or not an animal is present. What a riverside scheme needs to survey, design and condition before it reaches validation.

An otter resting site survey is the piece of ecology work most often missed on riverside schemes, and it is the one with no seasonal get-out. Otters breed throughout the year, so a holt or a couch is protected whenever it is capable of being used, and the protection does not depend on a cub being inside. If your red line touches a watercourse or sits within a short distance of one, assume the question will be asked at validation and have the answer ready.

Otters have recolonised almost every English catchment over the past four decades. A site that was clear twenty years ago is not clear now.

Why otters constrain a riverside site

Three separate controls bite on the same strip of land, and they are administered by different bodies.

The first is species protection under the Conservation of Habitats and Species Regulations 2017, enforced through Natural England licensing. The second is the Environment Agency's control of works in, over, under or near a main river, where a flood risk activity permit is needed for works within 8 metres of the bank of a fluvial main river and 16 metres of a tidal one. The third is the local planning authority's own policy expectation of an undeveloped buffer to the watercourse.

They are not the same line on the plan, and they are not satisfied by the same document. A permit from the Environment Agency says nothing about the species offence.

The otter is listed in Schedule 2 to the 2017 Regulations as a European protected species. It is an offence to deliberately capture, injure or kill one, to deliberately disturb one, and to damage or destroy a breeding site or resting place. The resting place offence does not require intent and it does not require the animal to be present.

That last point governs programming. A holt in a bankside root plate is protected in February on a site where the last confirmed activity was in September.

The otter is also listed on Schedule 5 of the Wildlife and Countryside Act 1981, which adds offences of intentionally or recklessly disturbing an otter while it occupies a place of shelter and of obstructing access to that place. Blocking a culvert that otters use as a route is capable of being an offence in its own right.

What the survey looks for

Otter survey is field sign work. The ecologist walks the banks and records spraint, which is the species' marking droppings, usually left on prominent boulders, ledges, tree roots and under bridges, together with footprints in soft silt, slides on the bank, feeding remains and any structure capable of use as a resting place.

The survey extent runs along the watercourse upstream and downstream of the application site rather than stopping at the red line, because an otter's territory is linear and long. Agree the extent with the ecologist and record the justification in the report, because an officer or the county ecologist will ask why the survey stopped where it did.

Camera traps earn their place where a feature looks like a holt but cannot be confirmed from signs alone. Repeat visits spread across different flow conditions are more useful than one dry-weather walkover, since a spate washes signs off the marking points you most want to read.

This work sits inside a Protected Species Survey and must be carried out by a suitably experienced ecologist. Where a licence is needed, it must be a licensed ecologist. Most schemes reach otters through a Preliminary Ecological Appraisal that flags the watercourse and recommends the species survey, which is the sensible order to commission them in.

Holts, couches and why the distinction matters

A holt is an underground resting place. Tree root plates undercut by the flow, rock piles, land drains, old field drains and disused culverts all serve. A couch is an above-ground resting place, typically a flattened area in dense bankside vegetation, bramble, reedbed or scrub.

Both are resting places and both attract the offence. The practical difference is in what the works do to them.

Holt Couch
Form Underground chamber with one or more entrances Surface lie-up in dense vegetation
Usually lost by Bank reprofiling, piling, tree removal, dewatering Vegetation clearance, trampling, mowing
Detectability Entrance and spraint at the entrance Easily missed, often found by camera or by chance
Replaceable Artificial holts possible, success variable Habitat recreation over time

Natural England has never treated an artificial holt as an automatic answer to the loss of a natal holt. Design the scheme to retain the feature where there is any realistic option, because the alternative is a licence application resting on compensation that the regulator may not accept.

Disturbance from construction and how it is controlled

Disturbance is the offence that catches schemes which retain every holt on the plan. The test in the Regulations looks at whether the disturbance is likely to affect the ability of the animals to survive, breed, rear young or maintain their local distribution.

What matters on site, in rough order of how often it causes a problem:

  1. Night working anywhere near the corridor, because otters are largely nocturnal.
  2. Percussive piling and vibration transmitted through the bank.
  3. Dewatering and in-channel works that change the water level at a holt entrance.
  4. Open trenches and excavations left uncovered overnight, which are both a disturbance and a trapping risk.
  5. Vegetation clearance outside an agreed method, which removes couches before anyone has looked for them.

The control document is a construction environmental management plan with an otter-specific method statement, usually secured by condition. On sites with confirmed activity, expect a condition requiring an ecological clerk of works with authority to stop work, plus a pre-start check within an agreed period before each phase. Our note on otter surveys and working windows on a watercourse goes further into how those windows are set.

Lighting along the river corridor

Otters avoid lit banks, and a lighting scheme can sever a corridor as effectively as a wall. This is one of the easier things to get right and one of the most commonly ignored.

Aim for a dark corridor along the bank top, demonstrated with an isolux plot showing added illuminance falling away to effectively nothing at the water's edge. The design levers are column height and position, luminaire optics with rear shields and a steep cut-off, warmer colour temperature, and a curfew or part-night regime on any lighting that cannot be moved.

Where the scheme includes a riverside path, say plainly whether it is lit. An unlit path with wayfinding at junctions is often acceptable where a continuously lit one is not. Put the answer in the lighting design rather than leaving it to a condition, because a condition drafted by an officer will be more restrictive than one you propose yourself.

Licensing, mitigation and what the council will condition

If the works will damage or destroy a resting place, or cause disturbance that cannot be designed out, a European protected species mitigation licence from Natural England is required. The three tests are familiar: the works must fall within a licensable purpose, there must be no satisfactory alternative, and the action must not be detrimental to the maintenance of the population at favourable conservation status.

Planning permission comes first in practice, because Natural England expects the licence application to rest on an approved scheme. The authority in turn has to be satisfied the licence is likely to be granted before it permits the development, which is why the ecology chapter needs to address the three tests even at application stage.

A licensed ecologist is legally required for the survey and licence work. PlanScope can draft the structure, policy framing and method sections of a protected species report, and that draft is a starting point for the ecologist rather than a substitute for one. For specialist technical reports, qualified professional input may be required, and you can send a draft for sign-off through the professional directory.

Before you fix the layout, walk the bank with the ecologist and mark every root plate, culvert and scrub block on the survey plan. That single exercise decides more about a riverside scheme's cost than any report you commission afterwards. You can then enter the site postcode on PlanScope to see which reports the constraints are likely to trigger.

This is general guidance, not legal advice. Check the position with your local planning authority, Natural England or a qualified ecologist before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is there a survey season for otters?

No. Otters breed throughout the year, so resting places are protected at all times and field sign surveys can be carried out in any month. Flow conditions matter more than season, because a spate washes spraint off the marking points, so repeat visits across different conditions give a more reliable result.

What is the difference between a holt and a couch?

A holt is an underground resting place, often in an undercut tree root plate, rock pile or disused drain. A couch is an above-ground lie-up in dense bankside vegetation. Both are protected resting places, but couches are far easier to miss and are usually lost to vegetation clearance rather than excavation.

Do I need an Environment Agency permit as well as ecology work?

Probably, if the works are near a main river. A flood risk activity permit is generally needed for works within 8 metres of the bank of a fluvial main river and 16 metres of a tidal one. That permit is separate from species protection and says nothing about whether an offence would be committed.

Can an artificial holt replace one that is being lost?

Not automatically. Natural England has never treated artificial holts as a guaranteed substitute, and take-up is variable. Where a resting place can realistically be retained in the layout, retaining it is a far stronger position than applying for a licence that depends on compensation the regulator may not accept.

Does lighting need to be assessed for otters?

Yes, where the scheme lights or overlooks a watercourse. Otters avoid lit banks, so a lighting scheme can sever a corridor. Show an isolux plot with added illuminance falling to effectively nothing at the water's edge, using shielded optics, lower columns, warmer colour temperature and part-night regimes.

Who has to carry out otter survey and licensing work?

A suitably experienced ecologist must do the survey, and licence work requires a licensed ecologist under the Conservation of Habitats and Species Regulations 2017. Draft reports can set out the structure and policy framing, but the survey findings and licence application need the named professional.

Sources and further reading

ottersprotected speciesecologyrivershabitats regulations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Ecology, BNG and Protected Species

View all →
Ecology, BNG and Protected Species7 min read

Green roofs and living walls in the biodiversity metric

Roof and wall habitats do count towards biodiversity net gain, but substrate depth, maintenance access and the 30-year commitment decide how many units they earn.

Read article →
Ecology, BNG and Protected Species8 min read

Biodiversity net gain and nutrient mitigation together

BNG is a planning condition measured in biodiversity units. Nutrient mitigation is a habitats law requirement measured in kilogrammes. Where stacking works, where it fails, and the 30 year versus lifetime problem.

Read article →
Ecology, BNG and Protected Species8 min read

Bat roosts in roofs: survey before loft conversion

Roof voids are bat habitat, and a roost stays protected when empty. The preliminary roost assessment, the emergence survey season, Natural England licensing and the mitigation a converted roof can carry.

Read article →
Ecology, BNG and Protected Species7 min read

Biodiversity net gain on solar farms

Arable baselines are low and grassland under panels scores well, so solar schemes rarely struggle for units. Proving condition and reconciling 30 years with decommissioning is harder.

Read article →
Ecology, BNG and Protected Species7 min read

How to structure an ecological impact assessment

An ecological impact assessment is judged on whether important features are valued at a stated geographic scale and whether effects are characterised rather than described.

Read article →
Ecology, BNG and Protected Species7 min read

Grassland creation from arable and the establishment risk

Creating species-rich grassland on former arable land looks attractive in the biodiversity metric. Residual soil phosphorus, difficulty multipliers and a 30 year obligation decide whether it is deliverable.

Read article →