Permitted Development

Part 9 Class A: repairs to a private road or track

6 min readBy PlanScope Editorial Team

Repairing a private track is usually permitted development under Part 9 Class A, within the existing boundaries. Where that right stops, and which other consents still apply.

Repairing a rutted farm track or a shared private drive is usually permitted development, because Class A of Part 9 of Schedule 2 to the General Permitted Development Order 2015 permits works required for the maintenance or improvement of an unadopted street or private way, carried out on land within its boundaries. That covers regrading, hardcore, resurfacing, edging and drainage along the line of the existing way. It does not cover building a new track where none existed, and it does not cover widening onto land outside the way itself.

Those two limits catch most people. Everything else is about the other consents that sit alongside the planning position.

What Class A of Part 9 permits

The wording is short and it rewards reading closely. Permission is granted for works on land within the boundaries of an unadopted street or private way, where the works are required for the maintenance or improvement of that street or way.

Three phrases carry the weight. "Within the boundaries" fixes the footprint. "Unadopted street or private way" fixes what kind of route qualifies, so an adopted highway maintainable at public expense is dealt with elsewhere in Part 9. And "maintenance or improvement" fixes the purpose.

Class A carries no floor area limit and no express restriction on designated land, which surprises people who are used to the detailed limits in Part 1. The real constraints come from Article 3 of the Order and from the separate consent regimes further down this article, so check the current text of the Order before relying on the summary.

Repair against improvement and new construction

The line that matters is between improving an existing way and creating a new one.

Resurfacing a gravel track in bound material is improvement. Regrading a sunken section, laying a geotextile and new sub-base, forming passing bays inside the existing verges, replacing a failed culvert on the same alignment: all improvement.

Realigning the track around a wet corner, extending it to serve a new building, or widening it onto adjoining pasture are different things. They involve engineering operations on land outside the boundaries of the existing way, and they need planning permission unless another Class covers them.

For agricultural units there is a separate route. Part 6 permits private ways reasonably necessary for agriculture on units of five hectares or more, subject to the prior notification procedure and the limits in that Part, which is the correct Class for a wholly new farm track rather than Part 9.

And if the work ends up serving a change of use, the Class will not save it. A track improved to serve a new holiday let or a wedding venue is being used for a purpose the agricultural or residential way was not, and the use is assessed on its own.

Surfacing materials and drainage

Surfacing choice is a planning question in practice even when it is not one in law, because the visual effect of a bound black surface across open countryside is the thing a neighbour complains about and an enforcement officer looks at.

Bound surfaces also change where water goes. A track that shed water into verges across its length will, once sealed, discharge it at the low point, and that point is often a ditch, a watercourse or a neighbour's gateway.

Work Planning position under Class A Other consent to check
Regrading and new stone on the existing line Normally within the Class Protected species, trees, scheduled monuments
Bound surfacing of an existing track Normally within the Class Surface water discharge, ditch outfalls
New or replacement culvert on the same line Normally within the Class Ordinary watercourse consent from the lead local flood authority, or an environmental permit for a main river
Widening beyond the existing boundaries Outside the Class Planning permission required
Forming a new access onto a classified road Outside the Class Planning permission and highway authority agreement
New track on an agricultural unit Part 6 route, not Part 9 Prior notification to the authority

Where a drainage design is needed, the thinking is the same as for any site, and a short Drainage Strategy explaining outfalls and attenuation is worth having on file even for works that need no permission.

Designated land and landscape effects

Class A is not cut back on designated land in the way householder rights under Part 1 are. That does not make the work invisible.

In a National Park or National Landscape, a bound surface, engineered edges and standard highway kerbs can read badly across a landscape that the designation exists to conserve. Where the way crosses or adjoins a site of special scientific interest, works may need Natural England's consent whatever the planning position. Where it crosses a scheduled monument, scheduled monument consent is a criminal matter if it is not obtained.

The practical advice is unglamorous. Use materials that match the setting, keep the engineered width to what the vehicles need, and take photographs before you start.

Trees, hedgerows and protected features

Track works damage roots. A machine running along a track under a line of mature oaks compacts the rooting zone whether or not it touches the trunk, and if the trees are protected by a Tree Preservation Order or stand in a conservation area the protection applies regardless of Class A.

Check for Orders before mobilising, and where protected trees are within influencing distance, commission a Tree Survey so the root protection areas and a no-dig construction specification are agreed before the stone arrives.

Hedgerows along the way may be protected by the Hedgerows Regulations 1997, so removal of a stretch to improve visibility is a separate process with its own notice. Badger setts, nesting birds between March and August, and reptiles in rough verge grass are all live constraints on a summer track job.

Watercourse crossings and consents

A culvert or ford is where the paperwork multiplies. Works in, over or near an ordinary watercourse normally need land drainage consent from the lead local flood authority. On a main river the Environment Agency's permitting regime applies. Neither is a planning consent and neither is covered by Class A.

Allow real time for these. A consent application for a culvert replacement is not a fortnight's work, and doing it retrospectively after a flood complaint is considerably worse.

Where the work becomes development needing permission

Pull the threads together and the tests are: is the work inside the existing boundaries, is it maintenance or improvement of that way, and is it caught by any condition on a previous planning permission that removed or limited permitted development rights.

That last one bites on modern barn conversions and rural dwellings, where a condition on the original permission often restricts further works within the curtilage. Article 3 of the Order does not override a condition like that. An Article 4 direction can also remove Class A locally, so check the authority's register.

Permitted development is a judgement about facts, and the only formal way to confirm that works are lawful is a lawful development certificate under section 191 or section 192 of the Town and Country Planning Act 1990. For a track where a neighbour is already unhappy, a certificate for proposed works costs less than an enforcement dispute. The reasoning about proving facts in Class Q structural works and what is reasonably necessary applies to tracks too, and the surfacing question runs parallel to front garden paving, permeable surfaces and Class F.

If you are putting together a case for works that fall outside the Class, a Planning Statement setting out the policy position is the document the authority will read first.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does repairing a farm track need planning permission?

Usually not. Class A of Part 9 of Schedule 2 to the General Permitted Development Order 2015 permits works required for the maintenance or improvement of an unadopted street or private way, carried out within its boundaries. Regrading, new stone, resurfacing and like for like drainage repairs normally fall inside that, subject to the Order's general limits.

Can I widen a private track under Part 9 Class A?

Not beyond the existing boundaries of the way. The Class is limited to works on land within those boundaries, so taking in a strip of adjoining pasture is an engineering operation outside the right and needs planning permission. Passing bays formed inside the existing verges are a different matter and generally fall within the Class.

Does Class A apply in a National Park or National Landscape?

Class A is not cut back on designated land in the way householder rights under Part 1 are, so the planning right generally still exists. Other controls do not disappear: site of special scientific interest consent, scheduled monument consent, tree protection and the Hedgerows Regulations all apply, and the choice of surfacing materials becomes a practical matter of landscape fit.

What consent does a new culvert on a track need?

Land drainage consent from the lead local flood authority for an ordinary watercourse, or an environmental permit from the Environment Agency where the crossing affects a main river. Neither is a planning consent and neither is granted by Class A. Allow several weeks, and apply before the work rather than after a flooding complaint.

How can I be certain the works are lawful?

Apply for a lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990. That is the only formal way to confirm the position. A certificate for proposed works is worth the fee where a neighbour has already objected, where a condition on an earlier permission may have removed rights, or where an Article 4 direction is in force.

Sources and further reading

permitted developmentgpdoprivate roadrural planningtrackslawful development certificate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development8 min read

Shipping containers and portable buildings on a site

Physical attachment is only one of three tests, and the least important. When a container or portable cabin becomes operational development, which permitted development rights help, and how to regularise units already in place.

Read article →
Permitted Development7 min read

Caravans, mobile homes and annexes in a garden

Stationing a caravan in a garden is not building work, but independent occupation of it is a material change of use. Where the incidental, ancillary and separate dwelling lines fall, and the site licensing regime behind them.

Read article →
Permitted Development7 min read

Part 20 upward extensions to create new dwellings

Part 20 allows new flats on top of existing buildings by prior approval, within storey and height caps and a construction date condition that rules out much of the stock.

Read article →
Permitted Development7 min read

What article 2(3) land removes from householder rights

Conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites are article 2(3) land, and Schedule 2 strips out several of the most useful householder rights there.

Read article →
Permitted Development6 min read

Antennas and satellite dishes under Class H size limits

Class H permits satellite dishes within four limits: number, size, height above the roof, and position on designated land. The installations that fail are usually on chimneys or front elevations.

Read article →
Permitted Development7 min read

Flues and chimneys under Class G and the one metre rule

A wood burner flue is permitted development under Class G if it stays under one metre above the highest part of the roof. How the measurement works, and the narrower restriction that applies on designated land.

Read article →