Planning Law Updates

Permission in principle: when it is worth using

6 min readBy PlanScope Editorial Team

Permission in principle answers one question quickly: does the council accept housing here, in this quantity. It cannot carry conditions and it cannot resolve access or design.

Permission in principle settles three things and nothing else: the location of the development, the land use and the amount of development. It does not deal with access, appearance, landscaping, layout or scale, and it cannot carry conditions. Everything else waits for the second stage.

That narrowness is the whole point. For a small housing plot where the question that matters is whether the council accepts a house there at all, it is a fast and inexpensive way to get an answer. For a constrained site where the principle depends on assessment work, it is the wrong tool.

What it establishes and what it leaves out

The consent comes in two stages. Permission in principle establishes the principle. Technical details consent deals with the detail, and the two together have the same effect as a planning permission.

The statutory framework sits in the Town and Country Planning Act 1990 as amended by the Housing and Planning Act 2016, with the procedure in the Permission in Principle Order 2017.

The amount of development has to be expressed as a range of dwellings, for example five to seven, rather than as a single figure. Get the range right. It fixes the envelope for the technical details stage, and a range that is too narrow leaves no room for the layout to settle.

No conditions can be attached to a permission in principle. Councils that want to control something have to do it at the technical details stage, which is one reason some authorities are lukewarm about the route.

Who can use it and on what sites

There are two ways a site gets permission in principle. The local authority can enter it in Part 2 of its brownfield land register, which grants the principle without an application. Or the applicant can apply for it directly.

The application route is limited. The development must be housing-led, meaning residential is the predominant use, and the site must be below one hectare with fewer than ten dwellings. Development requiring environmental impact assessment is excluded, as is development affecting a habitats site where an appropriate assessment would be needed.

Feature Permission in principle by application
Site size Below one hectare
Dwellings Fewer than ten
Use Housing-led, other uses ancillary
EIA development Excluded
Conditions Cannot be attached

The thresholds are absolute rather than indicative, and the detail of how they apply is covered in our note on the small site limit. The brownfield register route works differently and can cover larger sites, as our note on brownfield land registers explains.

The application process and publicity

The application itself is short. A location plan with the site edged red, the description of the proposed housing development, the range of dwellings, and the fee, which is charged per 0.1 hectare of site area and should be checked against the current schedule.

No supporting statements are required as a matter of validation, and no drawings of the building are needed, because the building is not being assessed.

The authority publicises the application for at least 14 days by site notice, and the determination period is five weeks rather than the eight weeks that applies to a minor full application. That short timetable is the route's main attraction.

The council is deciding whether the location, use and amount are acceptable in principle, having regard to the development plan and other material considerations. It can refuse, and refusal on a permission in principle application carries a right of appeal in the ordinary way.

Technical details consent is where the scheme itself is assessed: siting, layout, scale, appearance, access, drainage, ecology, amenity, parking and everything else that a full application covers.

The important constraint on the authority is that it cannot revisit the principle. Having granted permission in principle, it must grant technical details consent unless the details themselves are unacceptable. That is a real protection, and it is what gives the first stage its value to a landowner or a lender.

The application is not a light exercise. It needs the drawings and the supporting evidence that any application of that scale would need, including the biodiversity gain plan route where the gain condition applies, and the fee is broadly comparable to a full application.

Determination is five weeks for non-major development and ten weeks for major schemes coming through the brownfield register route.

The time limits between the two stages

Permission in principle granted on application has effect for three years from the date it comes into effect, and an application for technical details consent has to be made within that period. Entries on a brownfield land register carry a longer period.

Three years is less generous than it sounds on a plot being sold. Land transactions, funding and design all have to fit inside it, and a permission in principle that expires unused leaves the site exactly where it started.

Diarise the expiry at the point of grant, and work backwards from it. If the plot is being marketed, tell buyers the date rather than the duration, because buyers often count from the wrong day.

Where it saves time and where it does not

It saves time where the principle is the only genuine question. An infill plot in a village with no designations, inside the settlement boundary, where the council's position on a single dwelling is the unknown. Five weeks and a modest fee is a reasonable way to find out.

It also has value as a marketing tool. A plot with the principle established sells differently from one without, and the seller has not had to pay for a full design that the buyer will discard.

It does not help where the principle depends on evidence. A site in a conservation area, in flood zone 2 or 3, with protected trees, or adjoining a listed building, raises questions the council cannot answer without assessment, and it will usually refuse rather than grant a principle it cannot test. The same applies where highway access is the central issue, because access is not part of the first stage at all.

It is also poorly suited to anything other than straightforward housing. Mixed use, self-contained annexes with an uncertain use, replacement dwellings with a debatable lawful use, and rural sites relying on a policy exception all need the argument made in full, with supporting documents attached.

Choosing between this and outline permission

Outline permission remains the flexible option. It can cover any scale of development, including major schemes and environmental impact assessment development, it allows some matters to be reserved and others settled, and it can carry conditions that lock in what has been agreed.

Permission in principle is faster at the first stage, lower in cost, and narrower. The trade-off is the absence of conditions and the inability to resolve anything beyond location, use and amount.

A practical way to choose: if you could write the description of development in one line and expect the council to say yes or no without asking for a report, use permission in principle. If the answer depends on what the scheme looks like or how it is accessed, use outline or go straight to a full application. Our comparison of outline permission and permission in principle sets the two side by side.

Follow changes to the small sites regime through the planning law timeline, and enter your postcode on PlanScope to see which reports a plot is likely to need at technical details stage.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does permission in principle actually grant?

It settles the location of the development, the land use and the amount of development expressed as a range of dwellings. It does not address access, layout, scale, appearance or landscaping, and no conditions can be attached. Those matters are dealt with at the technical details consent stage, which together with the principle has the effect of a planning permission.

Which sites can use the application route?

Housing-led development on a site below one hectare with fewer than ten dwellings, where residential is the predominant use. Development requiring environmental impact assessment is excluded, as is development affecting a habitats site where an appropriate assessment would be needed. Larger sites can only get the principle through a brownfield land register entry.

How long does a permission in principle application take?

Five weeks from a valid application, with at least 14 days of publicity by site notice, compared with eight weeks for a minor full application. The application itself is short: a location plan with the site edged red, the description, the range of dwellings and the fee, which is charged per 0.1 hectare.

How long does it last?

Permission in principle granted on application has effect for three years, within which an application for technical details consent must be made. Entries on a brownfield land register carry a longer period. Three years is tight where land is being sold, so diarise the expiry date at grant and tell buyers the date rather than the duration.

When is outline permission the better choice?

Where the scheme is major, where environmental impact assessment applies, where access is the central issue, or where conditions are needed to lock in what has been agreed. Outline covers any scale, allows some matters to be settled and others reserved, and can carry conditions. Permission in principle can do none of those things.

Sources and further reading

permission in principleself buildsmall sitesoutline permissionplanning process

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →
Planning Law Updates7 min read

The standard method for local housing need explained

Local housing need now starts from existing stock rather than household projections. The result is a minimum for plan making, not a target, a ceiling or a test for any single application.

Read article →