Costs, Fees and Budgeting

Planning fees for a new dwelling and the sliding scale

6 min readBy PlanScope Editorial Team

New dwelling fees run per unit to a 50 dwelling threshold, then switch to a base plus increment. Outline applications are charged by site area, so the red line is a cost decision.

The fee for an application to build new dwellings is not a flat figure. It runs on a per dwelling basis up to a threshold, then switches to a base amount plus a smaller increment for each additional dwelling, and is capped at the top end. Outline applications are charged differently again, by site area rather than by unit count. And the whole schedule has been indexed annually since April 2025, so any figure you remember from a previous project is out of date.

That means the only safe way to fix a fee is to take the current schedule, identify which category your application falls into, and do the arithmetic on the numbers you have actually drawn. Submitting with the wrong fee is one of the most common causes of an application failing validation, and the clock does not start until it is right.

The per dwelling fee and where the band changes

The Fees for Applications Regulations 2012, as amended, set out the categories. For the erection of dwellinghouses, the structure is:

  • Up to and including a threshold number of dwellings, a fixed amount for each dwelling
  • Above that threshold, a base amount for the threshold quantity plus a lower amount for each additional dwelling
  • An overall maximum, so very large schemes do not scale indefinitely

The threshold sits at 50 dwellings. Below it, the arithmetic is straightforward multiplication. Above it, the marginal cost of each extra unit drops sharply, which is why the fee on a 200 unit scheme is far less than four times the fee on a 50 unit scheme.

Two practical points. Count the dwellings the application creates, including any created by conversion within the same application, and check whether your scheme also falls into another fee category, because where more than one applies the position is set by the regulations rather than by preference.

Fees for outline applications by site area

Outline applications for residential development are charged on site area rather than unit numbers, in bands of 0.1 hectare, with a base amount plus an increment per additional 0.1 hectare above a threshold area, and a cap.

This produces a result that surprises people. A low density scheme on a large site can attract a higher outline fee than a denser scheme with more units, because the charge follows the red line rather than the accommodation. So the red line on an outline application is a cost decision as well as a planning one. Include only the land the application needs.

Site area is measured as the area of the application site, so access strips, visibility splays outside the main parcel and land included only for drainage all count. Where land is included for a purpose that could be dealt with by condition or by a separate application later, ask whether it needs to be inside the line at all.

Reserved matters fees

An outline permission does not carry its reserved matters with it. Applications for approval of reserved matters carry their own fee, and where a scheme is brought forward through several reserved matters applications, the schedule sets how subsequent ones are charged.

For a phased scheme this is a recurring cost rather than a single one, which is the point made in our note on how planning costs recur when a scheme is phased. Budget a fee for each reserved matters submission, each condition discharge request, and any variation under section 73, rather than a single line for "planning fees".

Fees for a single plot against a small scheme

Application Fee basis
One new dwelling, full application Per dwelling amount, once
Five new dwellings, full application Per dwelling amount, five times
Outline for five dwellings on 0.4 hectares Site area bands, not unit count
Extension to an existing house Flat householder fee
Conversion creating flats Usually the dwellings category, on the number created
Approval of details reserved by condition Fixed fee per request, at a lower rate for householder cases
Non-material amendment under section 96A Fixed fee, lower for householder cases

The single plot case is worth isolating because self-builders often assume a householder-style fee applies. It does not. A new dwelling on a garden plot is charged at the dwellings rate, not the extension rate, and the difference is substantial. The utility and infrastructure costs that follow are covered in our note on utility connection budgets for a single new dwelling.

How the cap works on large schemes

The cap is an absolute maximum for the category, so above a certain number of dwellings the fee stops rising. On a large scheme the application fee becomes a minor line in the budget, dwarfed by the evidence base.

Be careful about assuming the cap covers everything. It applies to the category, and other chargeable elements can sit outside it: reserved matters, condition discharge requests, variations, and any separate application for advertisement or listed building consent. A scheme at the cap can still generate a long series of smaller fees over its life.

There is also a separate service charge for applications submitted through the national online portal, payable in addition to the planning fee. Check the current amount when you budget, because it is easy to miss when comparing a quoted total against the schedule.

Paying for a resubmission

The regulations allow one further application without a fee in defined circumstances, commonly described as the free go. It turns on the earlier application having been decided or withdrawn, on the same site, for development of the same character or description, by the same applicant, within a set period.

Three cautions. An application that was never validated was never entertained, so it does not use up the allowance. A scheme redesigned substantially may not be of the same character, and the authority decides that. And the allowance is once, so using it on a minor revision leaves nothing for the version that follows. Our note on the cost of failing validation and resubmitting works through the wider arithmetic.

Checking the fee before you submit

Do this as a discrete step rather than as part of form filling.

  1. Take the current fee schedule from the published regulations or the national fee guidance, and note the date of the version you are using
  2. Identify the category your application falls into, in the schedule's own words
  3. Count the dwellings created, or measure the application site area in hectares, from the drawings you are actually submitting
  4. Do the arithmetic and write it down, including the band boundaries you crossed
  5. Check whether another category could also apply, and how the regulations treat that
  6. Add the portal service charge and any separate consent fee
  7. Keep the calculation in the file, so a validation query can be answered in one email

That last step saves more time than it takes. Most fee disputes are resolved by showing the working, and an application returned over a fee query costs weeks rather than money.

As an illustrative example, a self-builder with a single plot in a garden, submitting a full application, pays the per dwelling amount once plus the portal service charge, then a condition discharge fee for each pre-commencement condition, and possibly a section 96A fee if the window arrangement changes during construction. Four separate payments across a project most people budget as one.

For the supporting documents those applications need, the 66 report types by category is the quickest reference, and drafting costs are set out on the pricing page.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. Planning fees are indexed annually and the schedule is amended from time to time, so always take the current published figures. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is the fee for one new house the same as for an extension?

No. A new dwelling is charged under the dwellings category at the per dwelling rate, while an extension attracts the flat householder fee, and the difference is substantial. Self-builders on garden plots frequently assume the householder rate applies. Check the category wording in the current schedule before calculating anything.

Where does the dwellings fee band change?

At 50 dwellings. Up to and including that number the fee is a fixed amount for each dwelling. Above it, a base amount covers the first 50 and a lower amount applies to each additional dwelling, with an overall maximum. That is why the fee on a large scheme is far less than simple multiplication would suggest.

Why is my outline application fee higher than the full application would be?

Because outline residential applications are charged on site area in bands, not on the number of dwellings. A low density scheme on a large site can therefore cost more at outline stage than a denser one. Site area includes access strips and land added for drainage, so keep the red line to what the application needs.

Do I have to pay again for reserved matters and conditions?

Yes. Reserved matters applications carry their own fee, and each request for approval of details reserved by condition attracts a fixed fee, at a lower rate for householder cases. Variations under section 73 and non-material amendments under section 96A are charged separately too, so budget a series of fees rather than one.

How does the free go work on a resubmission?

The regulations allow one further application without a fee where the earlier application was decided or withdrawn, on the same site, for development of the same character, by the same applicant, within a set period. The authority judges whether the character is the same, and the allowance is available only once, so use it deliberately.

Sources and further reading

planning feesnew dwellingcostsoutline applicationself-build

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →
Costs, Fees and Budgeting7 min read

Costing an employment land assessment for an allocated site

On an allocated employment site the fee sits in evidence gathering, not analysis. This covers the marketing records councils expect, the suitability tests that decide it, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

Costing an odour assessment for a kitchen or waste use

The fee for an odour assessment depends on whether the council accepts a qualitative risk based appraisal or expects dispersion modelling. Here is what sits behind each, and how to scope the work before you commission it.

Read article →
Costs, Fees and Budgeting6 min read

Costing a telecommunications compliance declaration for a mast

An ICNIRP declaration is produced by the operator's own radio engineers and closes the health issue. Siting and appearance are the only matters the council can decide on.

Read article →
Costs, Fees and Budgeting6 min read

Costing an equalities impact assessment for a public applicant

The public sector equality duty is continuing, so an equalities impact assessment has to be revisited at every material change. Budgeting for one document is the common mistake.

Read article →