Costs, Fees and Budgeting

Planning fees for outline applications and reserved matters

6 min readBy PlanScope Editorial Team

Outline fees follow the red line, not the unit count. How the area bands, the cap and the reserved matters aggregate rule shape the cost of a phased scheme.

An outline application fee in England is calculated on site area, not on the number of units, which is why two schemes proposing the same 80 dwellings can pay very different amounts. The fee regulations set a rate per 0.1 hectare up to a threshold, a lower rate per 0.1 hectare above it, and a maximum that caps the total. Reserved matters are then charged separately, and the way they are charged is where developers lose control of the budget.

Every figure in the fee schedule is indexed annually, so treat any number you have written down as provisional and check the current schedule before you commit it to a cash flow.

How the outline fee is worked out

The Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, as amended, set the structure.

Element Basis
Outline application Site area in hectares, charged per 0.1 ha
Rate above the area threshold A lower rate per 0.1 ha for the excess
Maximum A cap on the total payable
Reserved matters Calculated as if a full application, subject to a minimum

Site area means the area of the application site shown by the red line, not the developable area and not the net residential area. That distinction is worth a moment before the red line is drawn. Land included for access, landscape buffers, drainage or ecological mitigation counts towards the fee even where nothing is built on it, and a red line drawn generously around an entire ownership can cost real money at outline stage.

Part hectares are rounded up to the next 0.1 hectare, so a site of 2.31 hectares is charged as 2.4.

The cap and where it bites

Large sites hit the maximum, and above that point extra area is free. That produces an odd incentive: on a 40 hectare strategic site the fee is the same as on a 60 hectare one, so there is no fee reason to trim the red line.

Below the cap, area is money. On a 3 or 4 hectare site the difference between a tight and a loose red line is measurable, and it repeats if the outline is later varied or resubmitted.

The cap applies to the application, not to the project. An outline permission followed by three reserved matters applications and two condition discharges generates several separate fees, none of which is capped by what came before.

Reserved matters and the aggregate rule

Reserved matters fees are calculated as though the submission were a full application for the development in question, subject to a minimum amount.

The rule that catches people is the aggregate one. Where reserved matters are submitted in more than one application, the total paid across those applications is measured against what a single application covering everything would have cost. Until that total is reached, each submission attracts a fee calculated in the normal way. Once the aggregate has been reached, further reserved matters applications attract only a flat further-application fee.

Read that carefully, because it means the first reserved matters submission on a large scheme is expensive. It is charged as if it were a full application for the whole development, not for the phase in front of you, unless the regulations provide otherwise for the way you have framed it. Get the fee confirmed in writing by the authority before submission rather than discovering the number when the application is invalidated for underpayment.

Phasing costs more than a single submission

Phasing is normal and often unavoidable. It also multiplies the transaction costs.

Each reserved matters application is a separate submission with its own drawings, its own supporting documents, its own consultation period and its own eight or thirteen week determination period. The fee is one line in that cost. The larger numbers are the professional time spent producing each pack and the programme risk of a phase slipping past a condition trigger.

  1. Work out the phasing before the outline is submitted, and reflect it in the phasing plan and the conditions.
  2. Ask the authority to word the conditions so that discharge can be phase by phase, not scheme-wide.
  3. Where several matters can be submitted together, submit them together.
  4. Keep a running record of fees paid against the aggregate, because the authority will not do it for you.

The point of the third one is not the fee saving alone. It is that a combined submission is assessed as a coherent design, and split submissions invite the officer to reserve judgement on each part until the next arrives.

Indexation and which schedule applies

Planning fees in England were increased in December 2023, and the regulations introduced annual indexation from April 2025. That means the figures change each year on a set date, and the applicable fee is the one in force when the application is received rather than when the cheque was budgeted.

For a scheme running over three or four years from outline to final reserved matters, assume the later submissions cost more than the earlier ones. Build an inflation allowance into the development appraisal rather than a fixed figure.

Pre-application advice is charged separately and is not set by the national regulations at all. Councils publish their own scales, they usually attract VAT, and the bands vary widely between authorities. A planning performance agreement is different again: a negotiated contract with a defined resource commitment and timetable, priced by the authority, which on a strategic site is often the largest single planning fee in the budget.

Refunds and the determination guarantee

The fee regulations have included a mechanism refunding the fee where an authority fails to determine an application within 26 weeks and no extension of time has been agreed. This has been amended more than once, so check the current position before relying on it.

Two practical points survive whatever the detail says. Agreeing an extension of time removes the entitlement, and authorities ask for extensions routinely on major applications. And on a scheme with a funding deadline, a refund is worth far less than a decision, so trading the extension for a committed date is usually the better bargain.

Budgeting the sequence

Set the budget out as a sequence rather than a single number: pre-application charge, outline fee, reserved matters fees across the phases, condition discharge fees for each tranche of conditions, any section 73 variation, section 96A non-material amendments, and the planning performance agreement if there is one.

Then add the evidence base, which on a major application dwarfs the statutory fees. That is the number worth attention. See what a report costs on PlanScope if you are pricing the drafting side, or browse the report types to work out which ones the site's constraints will trigger. A well-scoped Planning Statement at outline stage also reduces the volume of work needed at reserved matters, because the policy case has already been made and does not need rebuilding for each phase.

Fees are indexed annually, so confirm the current amounts on the national fee guidance or the Planning Portal fee calculator before submitting anything. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How is the fee for an outline application calculated?

On the site area shown by the red line, charged per 0.1 hectare, with a lower rate for area above a threshold and an overall maximum. Part hectares round up. Unit numbers do not enter the calculation at outline stage, which is why the red line drawing has a direct effect on the fee payable.

Does land I am not building on count towards the fee?

Yes, if it is inside the red line. Access land, landscape buffers, drainage areas and ecological mitigation all count towards the site area. On sites below the fee cap that can be a real cost, so decide what the application site needs to include before the plan is drawn rather than afterwards.

How are reserved matters fees worked out?

As though the submission were a full application for the development, subject to a minimum. Where matters are submitted in more than one application, the total paid is measured against what a single combined application would have cost, and further submissions after that point attract only a flat further-application fee.

Do planning fees go up every year?

Fees were increased in December 2023 and the regulations introduced annual indexation from April 2025, so the schedule changes on a set date each year. The fee that applies is the one in force when the application is received. On a scheme running several years, build an allowance for that into the appraisal.

Can I get the fee back if the council takes too long?

The regulations have included a refund where an authority fails to determine an application within 26 weeks with no agreed extension, but the provision has been amended more than once, so check the current position. Agreeing an extension removes the entitlement, and on a funded scheme a committed decision date is usually worth more than a refund.

Sources and further reading

planning feesoutline applicationreserved mattersdevelopment appraisalmajor developmentbudgeting

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →
Costs, Fees and Budgeting7 min read

Costing an employment land assessment for an allocated site

On an allocated employment site the fee sits in evidence gathering, not analysis. This covers the marketing records councils expect, the suitability tests that decide it, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

Costing an odour assessment for a kitchen or waste use

The fee for an odour assessment depends on whether the council accepts a qualitative risk based appraisal or expects dispersion modelling. Here is what sits behind each, and how to scope the work before you commission it.

Read article →
Costs, Fees and Budgeting6 min read

Costing a telecommunications compliance declaration for a mast

An ICNIRP declaration is produced by the operator's own radio engineers and closes the health issue. Siting and appearance are the only matters the council can decide on.

Read article →
Costs, Fees and Budgeting6 min read

Costing an equalities impact assessment for a public applicant

The public sector equality duty is continuing, so an equalities impact assessment has to be revisited at every material change. Budgeting for one document is the common mistake.

Read article →