Protected building: the 400 metre farm rule explained

7 min readBy PlanScope Editorial Team

Part 6 of the General Permitted Development Order uses protected building to mean a permanent building people normally occupy. It sets a 400 metre buffer around livestock housing and slurry storage, measured from the curtilage.

A protected building, on a farm, has nothing to do with listed buildings. It is the term Schedule 2 Part 6 of the General Permitted Development Order 2015 uses for a permanent building normally occupied by people, and it creates the 400 metre buffer that stops you putting up a livestock building or a slurry store under agricultural permitted development rights. Measure from the wrong point and a building you were told was permitted turns into a full planning application, usually after the slab has been poured.

The definition is short. Its consequences are not.

What the term means

Part 6 defines a protected building as any permanent building that is normally occupied by people, or would be so occupied if it were in use for the purposes for which it is apt. Two things are then carved out of that definition: a building within the agricultural unit itself, and a dwelling or other building on another agricultural unit that is used for or in connection with agriculture.

So the test runs in two stages. First, is the building one that people normally occupy. Then, is it excluded because of who farms it.

A neighbour's house in the village down the lane is a protected building. So is the village hall, the primary school, the parish church and the small office unit on the edge of the settlement. Your own farmhouse, sitting inside the unit you are building on, is not. Neither is the farmhouse on the holding next door, provided it is occupied in connection with that farm.

The phrase "apt for occupation" does real work. An empty cottage standing between tenants is still a protected building, because it is a dwelling and people would normally occupy it. A roofless stone barn with no consent for residential use is not, because nothing about it is apt for occupation by people.

Where it comes from in law

The definition sits in the interpretation paragraph at the end of Part 6, and the restriction it feeds sits in the conditions attached to Class A (agricultural development on units of five hectares or more) and Class B (units between 0.4 and five hectares). In both classes, development is not permitted if it consists of or includes the erection, construction, alteration or extension of a building or structure for the accommodation of livestock, or for the storage of slurry or sewage sludge, within 400 metres of the curtilage of a protected building.

Note what is caught and what is not. The restriction bites on livestock housing and on slurry and sewage sludge storage. A grain store, a machinery shed, a straw barn or a workshop is outside it, and can sit 50 metres from a cottage and still be permitted development, subject to the other Class A limits.

Those other limits matter at the same moment. Class A caps the ground area of a new building at 1,000 m², sets a height limit of 12 metres (three metres within three kilometres of an aerodrome), keeps development 25 metres back from the metalled part of a trunk or classified road, and excludes separate parcels of less than one hectare. Class A also carries a prior approval step: for a new building you notify the authority and it decides within 28 days whether it wishes to approve the siting, design and external appearance.

How it is applied in practice

Measurement is the part people get wrong. The 400 metres runs from the curtilage of the protected building, not from its walls, and curtilage includes the garden, the drive and the domestic outbuildings that go with the house. A cottage whose front door is 430 metres away can easily have a garden hedge at 370 metres. That cottage defeats the right.

Measure from the nearest point of the curtilage to the nearest part of the proposed building or structure, and include the structure, not just the enclosed floor area. A feed passage, an external slurry channel or a covered yard counts.

Case officers check this with mapping. If your plan shows 402 metres and theirs shows 396 metres, theirs wins unless you can show the curtilage boundary is drawn wrongly. Put a measured radius on the block plan and label the point you measured from.

An illustrative worked example

Take a 60 hectare holding, all in one block, with a proposed 900 m² cattle building and an adjoining above-ground slurry store. This example is illustrative.

The nearest third-party dwelling is a cottage on the lane. Its gable is 415 metres from the proposed building. Its rear garden boundary, fenced and mown, lies 378 metres away. The curtilage controls, so the development falls inside the 400 metre radius and Class A is not available for either the cattle building or the store.

Two routes out. Shift the building 30 metres north-east, re-measure to 408 metres, and the right is restored for both structures. Or keep the preferred siting and apply for full planning permission, accepting that the council will then assess odour, ammonia, traffic on the lane and landscape impact on their merits rather than through the prior approval filter. On a dairy unit that choice often turns on whether the preferred siting is driven by the existing collecting yard, in which case the extra haulage of moving the building is worse than the application.

Common misuse of the term

The commonest error is reading "protected" as "designated". A protected building under Part 6 has no connection to listing under the Planning (Listed Buildings and Conservation Areas) Act 1990, to conservation areas, or to scheduled monuments. A Grade II farmhouse inside your own agricultural unit is not a protected building for these purposes, even though it is very much a protected building in ordinary speech.

The second error is the reverse: assuming your own farmhouse triggers the buffer, concluding that no livestock building is possible anywhere on the holding, and applying for permission you never needed.

The third is treating 400 metres as a general odour standard. It is not. Under a full application there is no magic distance, and an authority can refuse a cattle building 600 metres from housing if the evidence on odour and ammonia is poor, or approve one at 200 metres if it is good. Where odour is the live issue, an Odour Assessment is the document that answers it, and the reasoning belongs in the Planning Statement rather than in a covering email.

Term What it governs Where it sits
Protected building 400 metre buffer for livestock housing and slurry or sewage sludge storage GPDO 2015 Schedule 2 Part 6
Listed building Consent for works affecting special interest Planning (Listed Buildings and Conservation Areas) Act 1990
Agricultural unit Land occupied as a unit for agriculture, including the five hectare and 0.4 hectare thresholds GPDO 2015 Schedule 2 Part 6
Curtilage Land attached to and serving a building, decided on the facts Case law, not statute
Sensitive receptor A location where odour or noise effects are judged Assessment practice, no statutory distance

Soil quality sits in a different frame again, and if the siting question turns on which part of the holding you can afford to build over, the grading matters as much as the buffer. Our note on wetness class and how it decides land quality covers that side of it.

Separately, the Water Resources (Control of Pollution) (Silage, Slurry and Agricultural Fuel Oil) (England) Regulations 2010 impose their own siting rules for slurry stores, including distance from watercourses and notification to the Environment Agency. Those duties run alongside planning and are not satisfied by holding permitted development rights.

Where to check the current position

Read the current text of Part 6 on legislation.gov.uk rather than a summary. The Order has been amended many times since 2015 and the class conditions have moved.

Check three other things before relying on the right. Whether an Article 4 direction has withdrawn it. Whether a condition on an earlier permission removed agricultural permitted development on the holding. And whether the land carries a designation that modifies the Order.

If the margin is tight, a lawful development certificate for proposed use or development under section 192 of the Town and Country Planning Act 1990 is the only way to put the question beyond argument, and it costs a fraction of building the wrong thing. Enter your postcode on PlanScope to see which reports a farm building proposal is likely to need, or browse the full list of report types first.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a protected building the same as a listed building?

No. The term in Part 6 of the General Permitted Development Order 2015 means a permanent building that people normally occupy, such as a house, school or village hall. Listing is a separate heritage designation under the Planning (Listed Buildings and Conservation Areas) Act 1990. A listed farmhouse inside your own agricultural unit is not a protected building for Part 6 purposes.

Does the 400 metre rule apply to a grain store?

No. The restriction catches buildings and structures for the accommodation of livestock and for the storage of slurry or sewage sludge. A grain store, machinery shed or workshop falls outside it and can be built closer, so long as the other Class A limits on ground area, height, road distance and parcel size are met.

Where exactly do you measure the 400 metres from?

From the curtilage of the protected building to the nearest part of the proposed building or structure. Curtilage usually includes the garden, driveway and domestic outbuildings, so the measuring point is often a garden boundary rather than a wall. Mark the point and the radius on the block plan so the case officer can check it.

What happens if my building falls inside the 400 metres?

Permitted development under Class A or Class B is not available for that structure, so you either move it far enough away or apply for full planning permission. On a full application the authority assesses odour, ammonia, traffic and landscape on the evidence, and there is no fixed separation distance that guarantees either outcome.

Can a derelict cottage still be a protected building?

Often yes. The definition covers buildings normally occupied by people, or that would be if used for the purposes for which they are apt. A dwelling standing empty between occupiers remains apt for occupation. A roofless barn with no residential consent is not, because nothing about it suits occupation by people.

Sources and further reading

permitted developmentagriculturalgpdorural planningslurryglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary8 min read

Hope value and how planning status affects land value

Hope value is the slice of a land price that reflects the prospect of future planning permission. Allocation in a local plan usually moves it more than the permission itself.

Read article →
Glossary7 min read

Ransom strips and severance in planning terms

Permission does not confer a right to build. What a ransom strip is, how severance drives its retention, and the certificates, conditions and checks that follow.

Read article →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →
Glossary7 min read

Extant planning permission and how to keep it alive

A permission is extant while it can still be lawfully implemented. Here are the section 91 and 92 time limits, what counts as a material start, and the options once a consent has gone.

Read article →
Glossary6 min read

Design review panel and its weight

Panel reports are advice, not decisions. What gives them weight is independence, composition and whether the scheme in front of the council is the one the panel saw.

Read article →
Glossary6 min read

Open book viability appraisal

Open book means the authority and the public see your inputs. National guidance expects publication, redaction is the exception, and review mechanisms capture what the appraisal got wrong.

Read article →