Flood, Drainage and SuDS

Rainwater harvesting in a drainage and water strategy

6 min readBy PlanScope Editorial Team

A harvesting tank cuts mains water use. It does not reliably attenuate, because on the day of the design storm it may already be full. Present it accordingly.

Rainwater harvesting earns its place in a drainage and water strategy as a demand reduction measure, not as attenuation storage. That distinction decides how you present it, and getting it wrong is the fastest way to have a strategy returned by a lead local flood authority.

A harvesting tank reduces the volume of mains water a building uses. It does not reliably reduce peak run-off, because on the day of the design storm the tank may already be full.

What harvesting contributes to water efficiency

Part G of the Building Regulations sets a water efficiency requirement for new dwellings, expressed as litres per person per day, with a tighter optional requirement that a local planning authority can impose by condition where the adopted plan justifies it. Compliance is demonstrated using the published water efficiency calculator.

The calculator works mainly on fittings: the flush volume of the WC, the flow rate of the taps and shower, the capacity of the bath, the consumption of the dishwasher and washing machine. A rainwater or greywater system attracts a credit within the methodology, calculated on the basis the methodology sets out rather than on your own estimate of yield.

That credit is real and sometimes decisive on a scheme that is a litre or two over the target. It is rarely the least costly way to get there. Specifying a 4/2.6 litre dual flush WC and a lower flow shower usually costs less than a tank, a pump, a filter and a second pipework circuit.

So the honest framing for a design and access or sustainability narrative is that harvesting supports the water strategy alongside fittings and, in water stressed areas, alongside the wider demand case set out in a Water Supply Assessment.

Whether harvested storage counts as attenuation

Almost never, and the reason is simple. Attenuation storage has to be available when the storm arrives. A harvesting tank is designed to hold water, so its available volume at any moment depends on recent rainfall and recent demand, neither of which you can guarantee.

Drainage guidance, including the widely used CIRIA SuDS manual, treats retained volume in a harvesting tank as unavailable for attenuation unless the design ensures it is empty before the event. That is why most lead local flood authorities allow no credit at all for a standard system.

There is a design that does earn credit. A dual-purpose tank splits the volume: a lower retention volume that stores water for use, and an upper attenuation volume above it that is emptied by a controlled outlet after each event. The attenuation volume is always available because it drains down, and the calculations can show that.

If you propose one, show the split explicitly on the section, state the control device and its discharge rate, and run the storm calculations on the attenuation volume alone. Present the retention volume as having zero attenuation benefit. That approach survives scrutiny, and it is the approach that sits well with what the lead local flood authority checks in a drainage strategy.

Sizing against demand rather than roof area

The common mistake is to size the tank from the roof. A large roof produces a large yield figure, the yield figure produces a large tank, and the tank never empties.

Size it from the demand it will serve. For a house that means the WC flushes, the washing machine if it is connected, and outside taps. For an apartment block it means the same list multiplied by occupancy, plus any landscape irrigation and communal cleaning.

The standards give two workable approaches. BS 8515 remains the familiar UK code of practice for rainwater harvesting systems, and BS EN 16941-1 covers on-site non-potable water systems using rainwater. Both point in the same direction: calculate the yield from the collection area and the local rainfall, calculate the demand from the intended uses, and size the storage as a proportion of the smaller of the two over a defined period.

Two sanity checks are worth running.

  • If the tank would take more than a few weeks of typical demand to empty, it is too big
  • If the connected demand is only WC flushing in a two-person flat, the payback on a full system rarely justifies it

State the occupancy assumption in the strategy. A reviewer who cannot see the assumed occupancy cannot check the sizing, and will ask.

Maintenance, water quality and backflow

Harvested rainwater is non-potable and must be kept separate from the wholesome supply. The Water Supply (Water Fittings) Regulations 1999 govern that separation, and a rainwater system is treated as a high risk fluid category, which means a physical air gap at the point where any mains top-up enters the system rather than a valve.

The other water quality elements are a leaf and debris filter before the tank, a calmed inlet to avoid disturbing settled sediment, an overflow with a trap and a rodent guard, and clearly marked non-potable pipework and outlets.

Maintenance is the part that fails in occupation. Filters need cleaning, tanks need periodic inspection and desludging, pumps need servicing, and mains top-up controls need checking. On a block of flats that duty falls to the management company, and it belongs in the same conversation as SuDS adoption and maintenance, because the same party usually ends up holding both.

Where a council conditions the installation, expect the condition to require retention and maintenance in perpetuity, so the maintenance schedule needs to be written before the condition is discharged.

Where harvesting helps a water neutrality case

In catchments where water neutrality applies, and in areas of serious water stress, demand reduction carries weight it does not carry elsewhere. Harvesting becomes one of the measures an applicant can point to, alongside high efficiency fittings, leak detection, metering and, where the policy requires it, offsetting.

Be careful about how much you claim. A neutrality case is arithmetic, and the arithmetic has to hold. Credit only the demand the system will actually serve, using the same methodology the authority accepts, and do not assume the system yields through a dry summer without storage to match.

The wider position on what applicants have to demonstrate is set out in the guidance on water neutrality, and the harvesting element should be consistent with it rather than making a separate claim.

Presenting it honestly in the strategy

Put the harvesting section in one place in the Drainage Strategy, and give the reviewer everything needed to check it.

  1. The collection area, with the roof types and any excluded surfaces.
  2. The demand calculation, with the occupancy assumption and the connected uses.
  3. The tank volume and the basis on which it was sized, naming the standard followed.
  4. A section showing retention and attenuation volumes separately if the tank serves both.
  5. The attenuation credit claimed, which for a standard system is zero.
  6. The maintenance regime and the party responsible for it.

And say plainly what the system does not do. A strategy that claims a harvesting tank solves both water efficiency and surface water attenuation reads as overselling, and the reviewer then examines every other number in the document. One that states the attenuation credit is nil, and then shows the separate SuDS train that provides the attenuation, gets approved.

Browse the drainage and sustainability report types on PlanScope to see what a scheme in a water stressed area typically needs.

This is general guidance rather than legal advice. Check the position with your local planning authority, the lead local flood authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does a rainwater harvesting tank count as attenuation storage?

Normally no. Attenuation volume has to be available when the storm arrives, and a harvesting tank is designed to hold water, so its free volume depends on recent rainfall and demand. Most lead local flood authorities allow no credit for a standard system. A dual-purpose tank with a separate drained-down upper volume can earn credit.

How should I size a harvesting tank?

From the demand it will serve rather than from the roof area. Calculate the yield from the collection area and local rainfall, calculate demand from the connected uses and occupancy, and size storage as a proportion of the smaller figure over a defined period. If the tank would take more than a few weeks of demand to empty, it is oversized.

Does harvesting help meet the water efficiency requirement?

Yes. The water efficiency calculator used to demonstrate compliance with Part G allows a credit for a rainwater or greywater system, calculated on the methodology's own basis. It is rarely the least costly route to the target, because efficient fittings usually cost less than a tank, pump, filter and second pipework circuit.

What backflow protection does a rainwater system need?

Harvested rainwater is non-potable and is treated as a high risk fluid category under the Water Supply (Water Fittings) Regulations 1999. Any mains top-up must enter the system through a physical air gap rather than a valve, and non-potable pipework and outlets must be clearly marked throughout the building.

Who maintains the system after occupation?

On a single dwelling, the householder. On a block of flats, the management company, which is usually the same party holding the SuDS maintenance duty. Filters need cleaning, tanks need inspection and desludging, pumps need servicing and top-up controls need checking. Write the maintenance schedule before discharging the condition.

Sources and further reading

rainwater harvestingdrainagewater efficiencysudssustainability

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Flood, Drainage and SuDS

View all →
Flood, Drainage and SuDS8 min read

Blue roofs in the drainage calculation

The hydraulics of roof attenuation are straightforward; getting the volume credited is not. This covers storage depth against structural loading, flow control modelling, failure modes and the drawings reviewers expect.

Read article →
Flood, Drainage and SuDS7 min read

Choosing between the central and upper end climate allowance

The Environment Agency publishes bands rather than a single climate uplift. This explains how vulnerability classification, flood zone and catchment select the allowance, and how to document the choice so a reviewer can check it.

Read article →
Flood, Drainage and SuDS8 min read

Local resilience forums and flood emergency planning

Flood emergency planning sits with local resilience forums under the Civil Contingencies Act, not with the planning system. Here is how the two meet.

Read article →
Flood, Drainage and SuDS8 min read

Sewerage design standards and sewer adoption approval

Adoptable sewers are designed to the sewerage undertaker's standards, not the council's. Here is what governs the layout, how the application runs and where the programme slips.

Read article →
Flood, Drainage and SuDS6 min read

Flood Re and what buyers will ask about

Homes built on or after 1 January 2009 cannot use Flood Re, so new build insurance rests on the open market. What to hand over at completion and what not to promise.

Read article →
Flood, Drainage and SuDS7 min read

Trash screens and the liability they create

Screens protect a culvert and introduce a new flood risk upstream. How blockage is modelled, which designs degrade gracefully, and who maintains the structure afterwards.

Read article →