Which Reports Do I Need

Report bundle for a bin and cycle store on flats

7 min readBy PlanScope Editorial Team

Blocks of flats have no householder permitted development rights, so a refuse or cycle store needs an application. Here is the evidence it turns on.

A bin store or cycle store on a flatted block needs planning permission, and the reason catches owners out every time. Part 1 of Schedule 2 to the General Permitted Development Order 2015 gives householder rights to dwellinghouses, and a building containing flats is not a dwellinghouse for those purposes. There are no incidental building rights, so a brick refuse enclosure in the front garden of a converted Victorian house in three flats is development requiring an application, however modest it looks. The documents that matter are a collection route plan with distances, cycle parking to the local standard, and an honest treatment of the frontage.

Start with the waste team's standards rather than with the architect's sketch.

Why these works need permission on flats

The classes that would cover a shed, a store or a hard surface in a garden all apply to dwellinghouses. A block of flats, a converted house in flats and a maisonette block are outside them.

So three things follow. Any enclosure, however small, is development if it is a building or structure. A boundary treatment may be covered by the fence, wall and gate class with its own height limits, but a roofed store is not. And where the building is listed, works affecting its character as a building of special interest also need listed building consent, which includes a store attached to or built against it.

Leasehold consent runs alongside. The forecourt and the communal garden are usually retained by the freeholder, so a licence to alter is needed whatever the planning position. Planning permission grants nothing in private law.

Collection distances and the waste team's standards

This is the technical heart of the application and the thing most often got wrong. Two distances govern the layout: how far a resident has to carry waste to the store, and how far the collection crew has to move a container from the store to the vehicle.

Approved Document H of the Building Regulations deals with solid waste storage and sets out the carry and collection distances that designs are expected to work to, and most local authorities publish their own waste storage and collection guidance that is tighter or more specific. Take the figures from the current Approved Document and from the authority's own guidance rather than from an earlier scheme, because local standards vary and are revised.

What the drawing has to show is straightforward once the standards are in hand:

  1. The store position, with internal dimensions and the number and size of containers it holds.
  2. The resident carry route from each entrance, dimensioned.
  3. The collection vehicle standing position, with the drag distance from the store to the vehicle dimensioned.
  4. Door and gate opening widths, and the clear manoeuvring space in front of the store.
  5. Container sizes by waste stream, matching what the authority actually collects.

Container numbers come from the authority's standard per dwelling and per stream, multiplied by the number of flats, not from what the current residents happen to use. A store sized for today's bins fails as soon as a new recycling stream arrives. A short Waste Management Strategy setting out the calculation, the streams and the collection arrangement answers the officer's question before it is asked.

Cycle parking standards and stand types

Cycle parking is assessed against the local standard, which in London is set by the London Plan and elsewhere by the local plan or a parking supplementary document. The standards distinguish long stay spaces for residents from short stay spaces for visitors, and they specify numbers per dwelling by bedroom count.

Stand type matters as much as number. Sheffield stands in a secure, covered, lit enclosure with adequate spacing are the benchmark. Two-tier racks fit more cycles into a smaller footprint and are routinely resisted, because lifting a cycle onto an upper tier excludes many users. Semi-vertical and wall-mounted systems have the same problem. Where a scheme relies on them to hit a number, expect the officer to ask whether the spaces are usable in practice.

Provide for larger cycles. Cargo cycles, adapted cycles and trailers need a longer, wider space with level access, and most current standards require a proportion of spaces to accommodate them. A store reached by three steps provides nothing for those users.

Two practical notes. Secure means a lockable enclosure with a controlled access arrangement, not a hoop in an open forecourt. And covered means roofed, not a tree.

Visual impact on the frontage

On a street of consistent terraces or villas, a front garden store is the most visible change the building will see for years. Officers look at height, bulk, the material, the proportion of the frontage it occupies and whether the boundary wall and railings survive.

Four moves make these applications succeed. Keep the store below the top of the existing boundary wall where possible, so it reads as part of the enclosure rather than a new structure. Use a material that matches the building or a recessive one such as dark-stained timber. Set it to one side rather than centring it on the entrance path. And keep planting in front of it.

In a conservation area or where the building is listed, a short Heritage Statement assessing the effect on significance is needed, and a Design and Access Statement covering the material and detailing helps. Where an Article 4 direction applies, check its schedule, because some directions cover works in front gardens specifically.

Drainage, washdown and odour

A refuse store needs a floor that can be cleaned and water that can get away. Specify a hard, impermeable floor with a fall to a trapped gully connected to foul drainage, not to a surface water system, and provide an external tap within reach.

Ventilation matters for odour. Louvred doors or a ventilated gap at high and low level moves air through the store, and the position should keep the openings away from habitable room windows and from the main entrance. A store built hard against a ground floor bedroom window will generate complaints even if it is dimensionally perfect.

Vermin proofing is worth a line in the specification: a solid floor, no gaps at the base, and self-closing doors.

Trees and root protection

Front gardens on flatted blocks frequently contain a mature street tree or a protected specimen, and the store is often proposed exactly where the roots are.

Where a tree is protected by a Tree Preservation Order or stands in a conservation area, work within the root protection area needs arboricultural input, and the no-dig construction principles in the relevant British Standard are what an arboriculturist will apply. A store on a cellular confinement system or a suspended deck over the root area is often achievable where a strip foundation is not. An Arboricultural Impact Assessment is a report councils usually expect from a suitably qualified author where protected trees are affected, and professional review is strongly advised.

Highway trees belong to the highway authority, which has its own process. Check ownership before assuming the tree is yours to build near.

Accessibility and door widths

Residents using wheelchairs, pushing buggies or carrying shopping all have to use the same route to the store.

Provide a level or gently graded approach, a clear door width that allows a container to be pulled through without turning it, and a manoeuvring space in front of the door that is not on a slope. Doors that open outwards across a narrow path cause problems. A store with a 700 millimetre door and a 1,100 millimetre wide container is a drawing error that survives to construction more often than it should.

What to submit

For a typical application on a block of six to twelve flats, expect: a planning statement explaining the need and the design response, a site plan showing the store, the carry routes and the collection vehicle position with distances, plans and elevations of the store at a proper scale, a waste storage calculation and strategy, a cycle parking schedule against the local standard, a heritage statement where the building is listed or in a conservation area, and arboricultural information where a protected tree is nearby.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. Enter the building postcode on PlanScope to see which documents the constraint check flags for your block before you commission drawings.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for a bin store on a block of flats?

Yes, where the store is a building or structure. Part 1 of Schedule 2 to the General Permitted Development Order 2015 gives incidental building rights to dwellinghouses, and a building containing flats is not a dwellinghouse for those purposes. A boundary treatment may fall within the fence, wall and gate class, but a roofed enclosure does not.

What collection distances should the design work to?

Approved Document H of the Building Regulations sets out the carry distance for residents and the distance from the collection vehicle to the store, and most authorities publish their own waste storage guidance that is tighter or more specific. Take both from the current documents, and dimension the carry route and the drag distance on the site plan.

How many containers does the store need to hold?

Work from the authority's standard per dwelling for each waste stream, multiplied by the number of flats, rather than from what current residents happen to use. Sizing the store for today's bins means it fails when a new recycling stream is introduced. Set out the calculation in a short waste management strategy with the stream types named.

Are two-tier cycle racks acceptable?

They are routinely resisted, because lifting a cycle onto an upper tier excludes many users, and the same objection applies to semi-vertical and wall-mounted systems. Sheffield stands in a secure, covered, lit enclosure with adequate spacing are the benchmark. Provide a proportion of longer, wider spaces with level access for cargo and adapted cycles.

Can a store be built over tree roots?

Sometimes, with arboricultural input. Where a Tree Preservation Order applies or the site is in a conservation area, work in the root protection area follows the no-dig construction principles in the relevant British Standard, and a cellular confinement system or a suspended deck is often achievable where a strip foundation is not. Check whether the tree belongs to the highway authority.

Where should the store not be sited?

Hard against a ground floor habitable room window, across the main entrance path, on a slope where containers have to be manoeuvred, or anywhere the collection vehicle cannot reach within the authority's distance. Also avoid positions where the drainage would have to connect to a surface water system rather than to foul.

Sources and further reading

bin storecycle parkingflatswaste storagepermitted developmentfrontage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need8 min read

Reports for a nursery in a former community hall

A community hall sits in Class F2 and a day nursery in Class E(f), so the change needs permission. The reports that decide it turn on the drop-off peak and on how children's voices are assessed.

Read article →
Which Reports Do I Need7 min read

Reports for a car body repair workshop near housing

Panel beating is impulsive noise and a spray booth discharges solvent vapour near bedroom windows. Those two facts set the evidence base for a body shop application beside housing.

Read article →
Which Reports Do I Need7 min read

Reports for a climbing centre in a redundant church

A climbing centre in a redundant church turns on three documents: the heritage case for fixings into historic fabric, the fire strategy for a tall single volume, and the structural evidence behind both.

Read article →
Which Reports Do I Need8 min read

Reports for a mosque in a converted warehouse

A warehouse-to-mosque change of use stands or falls on the Friday peak. Here is how to build the parking, highway, noise and capacity evidence a case officer will test.

Read article →
Which Reports Do I Need7 min read

Reports for a veterinary hospital with overnight care

Overnight care changes the use class question and the evidence base. Animal noise at night is the issue that refuses these applications, and it needs structural mitigation.

Read article →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →