Which Reports Do I Need

Which reports a dog day care business needs

6 min readBy PlanScope Editorial Team

Barking is the only issue that really decides a dog day care application. Here is the evidence that answers it, and the documents you can safely leave out.

Dog day care planning reports come down to one document doing the heavy lifting: a noise assessment that deals honestly with barking. Day care for dogs is not a use that falls within any class in the Use Classes Order, so it is sui generis and a change of use application is needed whatever the building was used for before. And because barking is loud, sudden and tonal, it is the issue that decides the application almost every time.

The licensing regime is separate. Providing day care for dogs is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018, and holding that licence does not authorise the planning use. Councils issue both, often from different departments, and neither consent implies the other.

How the use is classified

There is no class for animal day care, boarding or kennels, so the use sits outside the Use Classes Order entirely. That has two consequences worth understanding before you sign a lease.

Changing to a sui generis use always needs permission, so there is no route in through the flexible movements within Class E or through any permitted development right. A former office, shop, light industrial unit or warehouse all require an application.

And the flip side is that once permission is granted, the use is tied to what the permission describes. A permission for dog day care does not allow overnight boarding, which is a different activity with different noise and welfare characteristics, and authorities routinely condition against it. If overnight boarding is part of the business plan, apply for it at the outset rather than adding it later.

Industrial estate units are the easiest sites to permit and the hardest to find, because they put distance between the dogs and any dwelling. A unit in a terrace of shops with flats above is the hardest case, and honest advice to anyone considering one is that the noise case is very difficult to make.

Noise assessment methodology for barking

The standard for industrial and commercial sound, BS 4142, is written for plant and process sound and is not designed for noise from people or animals. That does not mean it is irrelevant, and many assessments use its framework of rating level against measured background while making the limitation explicit. The important point is that a barking dog is impulsive, tonal and intermittent, so an assessment that applies acoustic feature corrections honestly will produce a rating level well above the measured sound level.

What a defensible assessment contains:

  1. A baseline survey at the nearest residential facades, covering the proposed opening hours and the quietest period within them.
  2. Sound power data for barking taken from published measurement work, with the source cited, rather than an assumed figure.
  3. An assumption about how many dogs bark at once, stated plainly, and a sensitivity test at a higher number.
  4. The building fabric performance for the walls, roof and any rooflights, because barking inside a steel portal frame unit passes straight through a thin roof sheet.
  5. Treatment of door openings, which is where most of the sound escapes in practice.
  6. The outdoor exercise area assessed separately, because no building envelope helps there.

The honest uncertainty in all of this is the number of simultaneous barks. Nobody can predict it, and a report that pretends to has lost the reader. Say what you have assumed, test a worse case, and propose a management regime and a condition that limits the number of dogs.

The outdoor exercise area

The exercise area is where applications fail. Dogs outside are unattenuated, and a 1.8 m close-boarded fence does very little at the frequencies that carry.

Design responses that councils accept include an acoustic fence of sufficient mass with no gaps at the base, siting the yard on the far side of the building from the nearest dwellings, a canopy or partially enclosed run, restricting outdoor use to defined hours in the middle of the day, and capping the number of dogs outside at any one time. Surfacing matters for a different reason: a free-draining, washable surface with a drainage point is what keeps the odour and waste question manageable.

Expect a condition limiting outdoor use, commonly to a window such as 09:00 to 17:00 on weekdays with tighter weekend hours, and expect it to be enforced if neighbours complain.

Odour, waste and drainage

Dog waste from a commercial operation is not household waste, and it cannot go into a domestic bin. It is a commercial waste stream collected under the duty of care, so the application needs a provision for storage in sealed containers in a ventilated store, a stated collection frequency and the contractor arrangement in principle.

Washdown water from the exercise yard and from indoor pens should discharge to foul sewer rather than to surface water, which usually needs the undertaker's consent, and in some cases a trade effluent consent. Set the storage calculation, the collection arrangement and the washdown drainage out in a Waste Management Strategy rather than leaving it as a line in the covering letter.

Parking for drop-off and collection

The trip profile is the thing to explain, because it is unusual. Day care generates two sharp peaks, a morning drop-off typically between 07:00 and 09:00 and an afternoon collection between 16:00 and 18:30, with almost nothing in between. Each visit is short, often two or three minutes, and the vehicle is almost always a car.

Evidence What it shows
Maximum dog numbers and average vehicle occupancy How many vehicle movements each peak generates
Drop-off bay layout That vehicles can stop, turn and leave in forward gear
Staff parking That staff do not occupy the drop-off area during peaks
Peak overlap with neighbouring uses Whether the industrial estate peak coincides with yours

A short Transport Statement covering those four points is usually enough. Where on-street parking is the only option and the street is already under pressure, a parking survey using a recognised methodology is the evidence that answers the objection rather than a statement that visits are brief.

Numbers and hours conditions

The conditions to expect, and to offer:

  • A maximum number of dogs on the premises at any one time.
  • Opening hours, usually tied to the drop-off and collection peaks.
  • Restricted hours for use of the outdoor exercise area.
  • No overnight boarding, unless that is what you applied for.
  • Doors and windows to the dog areas to be kept closed except for access.
  • A management plan covering supervision, the response to persistent barking and the complaints procedure.

Offer the numbers condition yourself with a figure you can live with for several years. Authorities set lower numbers when the applicant leaves it to them.

What to submit and what to leave out

The pack for a typical unit is a Planning Statement, a Noise Impact Assessment, a short transport statement, a waste and drainage note, a site and floor plan showing the pen layout and the exercise area, and a management plan.

What you are unlikely to need is an air quality assessment, an ecology survey on a hardstanding industrial unit, a flood risk assessment where the site is in flood zone 1, a heritage statement on a modern unit, or a transport assessment. Councils occasionally ask for items from the local validation list that do not apply to a change of use within an existing building, and a short, reasoned paragraph explaining why each is not needed is a legitimate response.

This is general guidance, not legal advice. Licensing requirements, validation lists and local noise standards change, so check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is dog day care?

None. Day care, boarding and kennels fall outside the Use Classes Order, so the use is sui generis and permission is always needed whatever the previous use was. No permitted development right or flexible movement within Class E applies. A separate licence is also required under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018.

How is barking noise assessed for a planning application?

Usually within the framework of BS 4142, comparing a rating level with the measured background, while acknowledging that the standard is written for plant rather than animals. Barking is impulsive and tonal, so acoustic feature corrections apply and push the rating level up. The assessment should state the assumed number of simultaneous barks and test a worse case.

Can I run dog day care from a shop unit with flats above?

It is the hardest case to permit. Sound transmission through a party floor and the absence of any buffer distance make the noise case very difficult, and outdoor exercise is normally impossible. Industrial units set away from dwellings are far easier to permit. Take acoustic advice before committing to a town centre unit.

Will the council limit how many dogs I can take?

Yes, in most cases, through a condition capping the number on the premises at any one time, and often a separate cap on the number outdoors. Propose a figure yourself that you can work with for several years, because authorities set a lower number when the applicant leaves the figure to them. Changing it later needs a section 73 application.

Where does dog waste and washdown water go?

Dog waste from a commercial operation is commercial waste collected under the duty of care, stored in sealed containers in a ventilated store with a stated collection frequency. Washdown water from pens and the exercise yard should discharge to foul sewer rather than surface water, which usually needs the water undertaker's agreement and sometimes a trade effluent consent.

Sources and further reading

dog day caresui generisnoise assessmentchange of useanimal licensingcommercial occupier

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →