Which Reports Do I Need

Which reports for a basement under a Victorian terrace

7 min readBy PlanScope Editorial Team

Basements have their own local policy and their own report. The Basement Impact Assessment covers hydrology, hydrogeology and stability, and it is where the application is won or lost.

Basement extension planning reports are unlike any other householder submission, because the council is being asked to approve an engineering operation under an existing terrace with neighbours attached on both sides. The document that answers that is the Basement Impact Assessment, and in the boroughs that require one it is the report the case officer reads first.

There is no general permitted development right you can rely on for a basement. Excavation almost always involves external alteration, a light well, a new rear access or an altered floor level, and several London boroughs have Article 4 directions removing whatever rights might otherwise exist. Where you think the works might be permitted, apply for a lawful development certificate rather than starting.

Why basements have their own policy

Basements generate a specific set of harms that ordinary extensions do not: groundwater flow can be diverted, ground can move and crack the neighbours' walls, spoil removal fills a residential street with lorries for months, and tree roots under the garden are severed.

In response, a number of local planning authorities, mostly London boroughs with dense Victorian and Edwardian terraces, have adopted basement policies and supplementary guidance. These typically limit the extent of excavation under the garden, restrict the number of storeys, set requirements for soil depth over the structure where it extends beyond the footprint, and require a basement impact assessment prepared by qualified engineers.

Find the local document first. The policy will tell you what you can build before you spend money designing something the plan prohibits, and the guidance will tell you exactly what the assessment has to cover.

Inside a Basement Impact Assessment

The assessment follows a staged sequence that the borough guidance sets out, and each stage is a gate rather than a chapter.

Screening asks whether the proposal could affect subterranean water flow, surface water and flooding, or land stability, using a series of yes or no questions about the site and the surrounding area.

Scoping takes each question answered yes and defines what investigation is needed to answer it properly.

Site investigation carries out that work: boreholes or trial pits, groundwater monitoring over a period rather than a single reading, soil classification and testing, and a review of the historical ground conditions.

Impact assessment then models the effect of the proposed structure on groundwater flow, on surface water, and on the ground beneath and around the neighbouring properties, and sets out the mitigation.

The final section is the one neighbours read: the predicted ground movement at each adjoining property, expressed as a damage category on the recognised scale, with the target normally being negligible or very slight. A Basement Impact Assessment that reaches a higher category without explaining the mitigation will attract objections it cannot answer.

Ground conditions, soakaways and the water table

The ground under a Victorian terrace is rarely what the geological map suggests, because most of these streets sit on made ground over the natural stratum.

The investigation needs to establish the soil profile and its strength, the depth to groundwater and how it varies through the year, whether any perched water sits above an impermeable layer, and whether the site is underlain by clay that shrinks and swells. On London Clay the shrink-swell behaviour matters more than the water table. On river terrace gravels the water table matters more than anything else.

A Geotechnical Assessment prepared to Eurocode 7 gives the structural engineer the parameters for the retaining wall design and the sequence of works. Councils normally expect a suitably qualified author, and professional review is strongly advised.

Drainage changes too. A basement below the level of the sewer needs pumped drainage with a suitable failure arrangement, and any existing soakaway in the garden may be compromised by the new structure. Where the site increases impermeable area or alters infiltration, expect the drainage strategy to be conditioned.

One point that catches householders out. A basement used as habitable accommodation is treated as highly vulnerable development for flood risk purposes, so in Flood Zone 2 or 3 the sequential and exception tests come into play and a flood risk assessment is required regardless of how modest the works look.

Construction traffic and neighbour management

The construction phase generates more objections than the finished basement ever will. A single-storey basement under a mid-terrace produces a large volume of spoil, all of which leaves in lorries on a street with no off-street parking.

Councils address this with a construction management plan secured by condition, and on basement schemes the plan is usually required before any work starts rather than as a general condition. Expect it to cover working hours, vehicle routing away from schools and narrow streets, the number and timing of lorry movements, wheel washing, a road cleaning arrangement, hoarding, dust and noise control, and a named site contact with a published telephone number.

A Construction Management Plan prepared at application stage rather than after approval is worth the effort. It answers the objections while the officer is still writing the report, instead of leaving them unanswered on the register.

The Party Wall etc. Act 1996 runs entirely separately from planning. It requires notice to adjoining owners, and it produces an award with a schedule of condition and, usually, a requirement for the building owner to pay the neighbours' surveyors. It is not a planning matter and the council will not enforce it, but it is not optional and it takes weeks. Start it early.

Trees and root protection

Gardens behind Victorian terraces are full of mature trees, some of them protected by a Tree Preservation Order and all of them protected if the site is in a conservation area, where six weeks' notice is required before works.

A survey to BS 5837:2012 establishes each tree's category, its root protection area and the constraint that area places on excavation. Basement excavation within a root protection area is usually fatal to the tree, and neither hand digging nor a root barrier reliably saves a mature specimen once the retaining wall goes in.

The practical answer is to design the basement footprint to sit outside the root protection areas, and to demonstrate that on a drawing overlaying the excavation on the surveyed areas. A tree survey and arboricultural impact assessment sets out the method statement for any work within or near those areas, and councils normally expect an arboriculturist to prepare it.

Where a tree has to go, deal with it directly rather than hoping nobody notices. A replacement planting scheme with species, size and location, plus a maintenance period, is what officers ask for.

An illustrative pack for a single-storey basement

Take a three-bedroom mid-terrace in a London borough with a basement policy, in a conservation area, with a 12 metre rear garden and a mature apple tree. The proposal is a single-storey basement under the existing footprint plus a light well to the front. The example is illustrative.

The likely submission is a full planning application, supported by:

  • existing and proposed plans, sections through the property and the neighbouring walls, and a front elevation showing the light well and its railing
  • a basement impact assessment covering screening, scoping, site investigation and impact, with ground movement predictions at each adjoining property
  • a geotechnical report with borehole logs and groundwater monitoring data
  • a structural approach statement setting out the underpinning sequence and temporary works principles
  • a construction management plan with lorry routing and movement numbers
  • a tree survey to BS 5837 with the excavation overlaid on the root protection areas
  • a heritage statement addressing the conservation area and the front light well
  • a drainage note covering pumped drainage and any effect on existing soakaways

The three most common refusal reasons on schemes of this type are inadequate ground movement assessment, excavation extending under the garden beyond what the local policy allows, and a construction plan that cannot work on the street in question. Each is answerable at design stage and expensive to answer afterwards.

Browse the report types on PlanScope to see what a basement scheme on your property is likely to need before you appoint the engineer.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for a basement?

Almost always. Basement works normally involve external alterations such as a light well, altered access or changed levels, which take them outside any permitted development right, and several boroughs have Article 4 directions covering basements. Where you believe the works may be permitted, apply for a lawful development certificate before starting.

What is a Basement Impact Assessment?

It is a staged report required by boroughs with basement policies, covering screening, scoping, site investigation and impact assessment across three areas: subterranean water flow, surface water and flooding, and land stability. It concludes with predicted ground movement at each neighbouring property, expressed as a damage category with proposed mitigation.

Will a basement damage my neighbours' houses?

The assessment is designed to answer that question with figures rather than assurances. The target for a well-designed scheme is negligible or very slight damage on the recognised category scale, achieved through the sequence of works, temporary propping and monitoring. Neighbours also have separate protection under the Party Wall etc. Act 1996.

Does the Party Wall Act replace planning permission?

No. They are separate processes with separate purposes. Planning controls the development, while the Party Wall etc. Act 1996 governs your relationship with adjoining owners, requiring notice and usually producing an award with a schedule of condition. You need both, and the party wall process takes weeks, so start it early.

Can I build a basement under my garden?

That depends on the local policy. Boroughs with adopted basement guidance commonly limit excavation beyond the footprint of the house, restrict the proportion of the garden that can be built under, and require a minimum depth of soil above the structure so that planting survives. Read the policy before designing.

Sources and further reading

basementbasement impact assessmentground movementconstruction managementtreeshouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →