Which Reports Do I Need

Reports needed for a dog day care or boarding business

7 min readBy PlanScope Editorial Team

Barking is the objection that decides these applications. Build the submission around a proper noise assessment and the rest follows more easily.

Dog day care and boarding almost always need planning permission, because animal boarding has long been treated as sui generis, falling outside every class in the Use Classes Order. Day care without overnight accommodation is generally treated the same way. Sui generis uses have no permitted development route into them, so a change of use from a Class E unit, a farm building or anything else requires a full application.

The application turns on noise. Barking is intermittent, tonal and loud, and it is the ground on which these proposals are refused. Everything else in the submission exists to clear the way for the noise case.

Which class the use falls in and why it is often sui generis

The Town and Country Planning (Use Classes) Order 1987, as amended in 2020, lists the classes. Boarding kennels and catteries do not appear in any of them, which makes the use sui generis and places it outside Class E flexibility.

Two consequences follow for an occupier. A unit with an existing Class E consent cannot simply be switched to dog day care, even though the building may be physically suited to it. And once permission is granted for the sui generis use, it is specific to that use, so a later change back into Class E will itself need permission.

The boundary cases are worth confirming with the authority before you spend anything. A dog grooming business with no boarding and no day care is arguably a retail or service use within Class E. A veterinary practice is a different question again. Where day care is a small element of a grooming or pet retail business, the planning unit analysis matters, and an officer's written view on it is worth having.

Ask the question in writing at pre-application stage, describing capacity, hours and whether dogs stay overnight. Those three facts drive the answer.

Barking noise and how it is assessed

Barking does not behave like plant noise, and an assessment that treats it as a steady source will be rejected.

A competent assessment usually does three things. It establishes the existing background sound level at the nearest noise-sensitive receptors, measured over representative periods. It predicts the specific sound level from the proposed use, using source data for barking dogs and the proposed building and enclosure design. And it applies the character corrections in BS 4142:2014+A1:2019 for tonal, impulsive and intermittent sound, which for barking are rarely small.

Maximum event levels matter as much as averages. A single dog barking at night produces a peak that wakes people, and officers increasingly ask for an analysis of maximum levels at bedroom windows alongside the rating level comparison. Internal guideline values for bedrooms and living rooms are the usual reference point.

A Noise Impact Assessment is the document for this, and councils expect a suitably qualified author. Professional review is strongly advised, because the environmental health officer reading it will be an acoustician or will take advice from one.

Mitigation that actually works, in rough order of effectiveness: no external kennelling at any time, a sound-insulated building with lobbied entrances and mechanical ventilation so doors and windows stay closed, a limit on the number of dogs, acoustic fencing to outdoor exercise areas, and restricted use of those areas by time of day.

Hours, capacity and outdoor exercise areas

Expect conditions on all three, and propose them yourself.

  • Opening hours, including separate limits for drop-off and collection, which is when vehicle movements and barking coincide.
  • Maximum number of dogs on site at any time, which the noise assessment should be based on.
  • Whether any dogs stay overnight, since boarding and day care are assessed quite differently.
  • Times during which outdoor exercise areas may be used, and supervision arrangements.
  • A prohibition on external kennelling, if the noise case depends on it.

The outdoor area is where applications fail quietly. An otherwise acceptable scheme with an unrestricted yard adjoining a garden boundary generates a stream of complaints after opening, and the authority then has an enforcement problem it will remember next time.

Set the capacity figure deliberately. A number chosen to match the noise assessment and the licence is easier to defend than a round figure that leaves the operator wanting a variation within a year.

Waste and drainage from kennels

Dog waste from a commercial operation is commercial waste, so it needs a registered carrier and a waste transfer arrangement rather than the household bins. Set out the storage location, the container type and the collection frequency.

The drainage question is the one applicants miss. Kennel floors are washed down, and the resulting effluent carries solids, hair and detergent. Discharging it to the foul sewer normally needs the agreement of the sewerage undertaker, and a trade effluent consent may be required depending on volume and content. Surface water from exercise yards used by animals should not go to a soakaway or watercourse without treatment.

A Waste Management Strategy covers the solid waste arrangements. Where the site is not on mains drainage, the foul drainage solution needs its own evidence, and that is a larger piece of work on a rural site than most operators expect.

Odour is a related but separate matter. Where the operation is large, or close to housing, an Odour Assessment addressing the kennel ventilation discharge and the waste storage point is proportionate, and again councils look for a suitably qualified author.

Parking and drop-off arrangements

Trip generation for day care is concentrated rather than heavy. Most of the day's movements happen in two short peaks, which coincide with the morning and evening commuter periods, and that is what the highway officer will focus on.

What the submission needs: the number of staff and customer spaces, the turning provision so vehicles leave in forward gear, the visibility splays at the access, and a drop-off arrangement that does not involve parking on the highway. Where capacity is more than modest, a Transport Statement setting out the trip profile and the access geometry is the right level of evidence.

Staggered drop-off windows are a useful offer. An operator who commits to collection slots across an hour rather than everyone arriving at 8am reduces the peak, and that commitment can be secured through the operational conditions.

Licensing under the animal welfare regime

Running boarding or day care for dogs is a licensable activity under the animal activities licensing regime in England, administered by the same local authority through its licensing team rather than its planning department. Licences are rated, inspected and renewed, and the statutory guidance sets standards for space, staffing ratios, exercise and record keeping.

Two points of coordination.

The licence standards drive the building design, particularly on floor area per dog, separation of individual animals and exercise provision. Design to the licensing standards before you fix the layout for the planning application, or you will be applying to vary the permission to meet the licence.

And a licence is not a planning permission. Holding one does not make the use lawful in planning terms, and planning officers are unimpressed by the argument that the licensing team was content.

The document set to submit

For a typical conversion of a building to dog day care near housing:

  1. Application form, location plan, block plan and existing and proposed drawings showing kennel layout, exercise areas and acoustic treatment.
  2. A planning statement covering the use class position, the policy case and the operational controls offered as conditions.
  3. A noise impact assessment to BS 4142 with character corrections and maximum event analysis, by a suitably qualified acoustician.
  4. An operational management plan covering hours, capacity, supervision, outdoor area use and complaint handling.
  5. A waste and drainage statement, with the sewerage undertaker's position where washdown is to the foul sewer.
  6. A transport statement or access appraisal where the capacity justifies it.
  7. An odour assessment where the scale or proximity to housing makes it relevant.

Check the council's local validation list, because requirements vary. If the proposal involves subdividing or taking part of a larger commercial unit, the planning unit questions overlap with those we cover in reports for subdividing a retail unit within Class E.

Browse all 66 PlanScope report types to see which of these your site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

This is general guidance rather than legal advice, and use class questions turn on the facts, so check the position with your local planning authority before relying on it.

Frequently asked questions

Is dog day care a Class E use?

No. Animal boarding has long been treated as sui generis, falling outside every class in the Use Classes Order, and day care without overnight accommodation is generally treated the same way. That means there is no permitted development route and a full planning application is needed, even from an existing Class E unit.

How is barking noise assessed?

Usually by establishing the background sound level at the nearest sensitive receptors, predicting the specific level from the proposed operation and applying the character corrections in BS 4142:2014+A1:2019 for tonal, impulsive and intermittent sound. Maximum event levels at bedroom windows are assessed alongside the rating level comparison.

Does an animal activities licence make the use lawful?

No. The licence is issued by the council's licensing team under the animal activities licensing regime and deals with welfare standards, staffing and record keeping. It says nothing about planning. The use still needs planning permission, and holding a licence is not an argument that carries weight with planning officers.

What happens to washdown water from kennel floors?

It is trade effluent in substance, carrying solids, hair and detergent. Discharging to the foul sewer normally needs the sewerage undertaker's agreement and may require a trade effluent consent depending on volume and content. Yard drainage used by animals should not reach a soakaway or watercourse without treatment.

Which conditions should I expect?

Opening hours including separate drop-off and collection limits, a maximum number of dogs on site, whether overnight boarding is permitted, restrictions on when outdoor exercise areas may be used, and often a prohibition on external kennelling. Propose these yourself, set to match the noise assessment and the licence standards.

Sources and further reading

change of usesui generisnoisedog day carecommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →