Which Reports Do I Need

Reports needed for a farm diversification scheme

6 min readBy PlanScope Editorial Team

Diversification is supported in principle. What decides the application is the access, the landscape, the drainage and the noise, and each is evidenced separately.

The reports for farm diversification depend less on what the new business is than on where it sits and what it brings down the lane. National policy supports sustainable rural economic growth, including diversification of agricultural and land-based businesses, so the principle is rarely the obstacle. The obstacles are the access, the landscape, the drainage and the noise, and every one of them is evidenced separately. Work out which of those four your scheme actually touches before you commission anything.

Establishing the existing agricultural use

Start with what you have. The lawful use of each building and parcel decides which route is open to you, and the answer is not always what the farm office assumes.

Buildings in agricultural use may qualify for permitted development under Part 3 of Schedule 2 to the General Permitted Development Order 2015. Class R allows change from an agricultural building to a flexible commercial use, subject to a floorspace limit, a requirement that the building was in agricultural use on a stated date, and a prior approval process for larger changes. The class was widened in 2024, both in the uses it covers and in the floorspace allowed, so check the current text rather than an older summary.

Where Class R does not fit, the route is a full planning application for change of use. That is often the better answer anyway, because prior approval gives you a flexible commercial use with conditions attached and no opportunity to shape the description.

Evidence the agricultural use with dated photographs, subsidy records, movement records for livestock buildings and contractor invoices. If the building has been used for storage of non-agricultural goods for years, say so now rather than discovering it during validation.

Policy support for rural diversification

Read three layers. National policy supports diversification in principle and asks that sites be well related to existing settlements or businesses. The local plan will have a rural economy policy with criteria, usually covering scale, the reuse of existing buildings over new build, traffic and landscape. And any neighbourhood plan may add its own.

The criterion that fails most schemes is scale relative to the holding. A farm shop selling produce from the farm and a small range of local goods is diversification. A retail unit on a farm that buys in everything and draws customers from 20 miles away is a shop in the countryside, and the sequential and impact tests for retail may engage.

Say what the link to the holding is and evidence it. Two sentences in the covering letter is not enough on a contested application.

Landscape and visual evidence in open countryside

Anything visible from a public road, a footpath or a National Landscape boundary needs a landscape response proportionate to its scale.

For a small conversion, that means a design that reads as a farm building: existing openings retained, no domestic detailing, materials matched, no urban kerbs or lighting columns. For a new building, a caravan site, a wedding venue or a glamping field, it means a proper Landscape and Visual Impact Assessment with viewpoints agreed with the officer, winter and summer conditions considered, and cumulative effects assessed where other diversification already exists nearby.

The evidence that persuades is the viewpoint analysis, not the assertion. Agree the viewpoints before the photography is commissioned, because a reshoot in the wrong season costs six months.

Highway access on a rural road

This is the single most common reason a diversification scheme is refused or delayed.

The highway authority will look at three things. Visibility at the access, measured against the recorded speed of traffic rather than the speed limit, which on a national speed limit lane can mean a splay far longer than the frontage allows. The suitability of the approach roads for the vehicles the use will generate, including coaches, delivery lorries and horse boxes. And parking and turning within the site, so that nothing reverses onto the carriageway.

Trip generation evidence matters. For most small schemes a Transport Statement with a trip rate drawn from a recognised database, plus a traffic count and a speed survey at the access, is proportionate. Larger visitor attractions move into transport assessment territory with junction modelling.

Where the frontage hedge has to be cut back into land you own, say so and show it. Where it does not belong to you, the scheme has a problem that no report will solve. The same access questions arise for other rural change of use proposals, and the pattern is much the same as the one described in the notes on which reports a children's nursery change of use needs.

Drainage, foul water and utilities off mains

Most farms are off the public sewer, and a diversification use puts a different load on the existing arrangement.

Foul drainage needs a stated solution. A septic tank or package treatment plant discharging to ground or to surface water is regulated by the Environment Agency, and small discharges may fall under the general binding rules if they meet the conditions, with a permit needed otherwise. A tank sized for a farmhouse will not serve a tea room, and the environmental health officer will ask.

Surface water from new hardstanding, roofs and parking has to be dealt with on site. Infiltration first, then a watercourse with consent from the lead local flood authority or riparian owner, then, rarely, a sewer.

Water supply and power both need checking early. A private borehole serving a food business engages drinking water quality requirements, and a three-phase supply upgrade for a processing unit can take longer to deliver than the planning permission takes to obtain.

Noise and lighting in a dark rural setting

Rural baselines are low, so a plant item that would be inaudible in a town is audible at 300 metres across a valley.

Plan for a noise assessment where the proposal includes extraction, refrigeration, a biomass boiler, an events use or anything with amplified music. The usual method compares the rating level of the specific sound against the measured background, and the background survey has to be done at the times the use will operate, which for a wedding venue means late evening and night.

Lighting is the quieter problem. Rural areas fall into the darkest environmental zones in the professional guidance, and the limits on obtrusive light are correspondingly tight. Specify downward-directed luminaires, low colour temperature, no upward light, and controls that turn the scheme off outside operating hours. Offer that as a condition rather than waiting to be asked.

Business evidence and how much is expected

Less than people fear, and more than a paragraph.

For most diversification schemes the authority wants to understand the link to the holding, the scale of the operation, the jobs created and the reason an existing building is not suitable where new build is proposed. A short business case covering those points, with the farm's own figures, does the job.

A full viability assessment is rarely needed. Where it is, usually because affordable housing or a planning obligation is in dispute, it is specialist work prepared to the relevant professional standard, and professional review is strongly advised.

Two documents most farms forget: an agricultural land classification note where the proposal takes best and most versatile land out of production, and an ecology appraisal for barn conversions, because barn owls and bats are the reason a straightforward conversion turns into a two-season programme.

Browse all 66 PlanScope report types and start a draft, or enter your postcode to see which reports the site is likely to need. This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Can I convert a farm building to commercial use without planning permission?

Sometimes. Class R of Part 3 of the GPDO 2015 allows change from an agricultural building to a flexible commercial use, subject to a floorspace limit, a requirement about agricultural use on a stated date and a prior approval process above a threshold. The class was widened in 2024, so check the current text before relying on an older summary.

What usually causes a diversification scheme to be refused?

Access. Highway authorities look at visibility measured against recorded traffic speeds rather than the speed limit, the suitability of the approach roads for the vehicles the use generates, and whether parking and turning can be accommodated on site. A frontage that cannot deliver the required splay is a problem no report will solve.

Do I need a landscape and visual impact assessment?

It depends on scale and visibility. A small conversion usually needs a design that reads as a farm building rather than a formal assessment. A new building, glamping field, caravan site or events venue visible from public vantage points needs a proper assessment, with viewpoints agreed with the officer before photography is commissioned.

How is foul drainage handled on a farm off the public sewer?

A septic tank or package treatment plant discharging to ground or surface water is regulated by the Environment Agency, and small discharges may fall under the general binding rules where they meet the conditions. Otherwise a permit is needed. A tank sized for a farmhouse will not serve a tea room or a visitor attraction.

Does the council expect a full viability assessment?

Rarely. For most diversification schemes the authority wants to understand the link to the holding, the scale of the operation, the jobs created and why an existing building will not serve. A short business case using the farm's own figures is normally enough. Full viability work is specialist and only arises where an obligation is disputed.

Sources and further reading

farm diversificationrural economyclass rhighwaysdrainagewhich reports

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →