Which Reports Do I Need

Reports needed for a nursery in a former bank unit

6 min readBy PlanScope Editorial Team

Moving a day nursery into a former bank unit rarely needs permission for the change of use itself. The evidence the council will want covers the works, outdoor play space, drop-off and extraction.

The reports needed for a nursery change of use into a former bank unit usually cost more effort than the application itself, because in most cases the change of use needs no planning permission at all. A bank is a Class E(c)(i) financial services use. A day nursery is Class E(f). Both sit inside the same use class, so moving between them is not development under section 55 of the Town and Country Planning Act 1990.

That is the starting point rather than the answer. Physical works, outdoor play space, drop-off arrangements and extraction each trigger their own evidence, and any one of them can put you back in front of a planning committee.

Which class a day nursery falls into

Schedule 2 of the Town and Country Planning (Use Classes) Order 1987, as amended in September 2020, puts a creche, day nursery or day centre in Class E(f). A bank or building society falls in E(c)(i). Article 3(1) of the Order means a change from one use within a class to another use within the same class is not development.

Three things break that rule, and you must check all three before relying on it.

  1. A condition on an earlier permission restricting the unit to a named use. Banks in 1990s retail parades often carry one. If it exists, you need a planning application to vary or remove it under section 73.
  2. An Article 4 direction removing the flexibility, which some authorities have made to protect town centre frontages.
  3. The unit not being lawfully in Class E in the first place. A former bank with a flat above that was itself converted without consent is a different problem.

Where the position is arguable, apply for a certificate of lawfulness of proposed use under section 192. It costs a fraction of a full application, and a landlord's solicitor will want it before a lease completes.

What the works need

Change of use may be free. The works usually are not. Replacing a bank shopfront with glazing, fitting a new entrance door, installing an external canopy or enclosing a yard with 1.8 metre acoustic fencing are all operational development that normally require permission in their own right.

In a conservation area, or where the building is listed, add advertisement consent for signage and listed building consent for internal alterations to a listed shell. Banking halls in listed buildings frequently retain counters, screens and joinery that count as fixtures.

Where an application is needed for the works, it carries a Design and Access Statement and, in a heritage context, a heritage assessment. The application then invites the council to comment on the use as well, which is why some operators prefer to keep the works within permitted development and confirm the use separately.

Outdoor play space and the evidence expected

The Early Years Foundation Stage statutory framework requires providers to offer access to an outdoor play area or, failing that, daily outdoor activities. Ofsted registration turns on it. Planning officers know this, and a nursery application with no outdoor provision and no explanation invites a refusal on the quality of the setting.

A former bank unit rarely has a garden. Options in descending order of acceptability are a private enclosed yard, a roof terrace with appropriate balustrading, a demarcated area of an adjoining car park with a physical barrier, and a written programme of supervised trips to a nearby park.

The evidence to submit is a plan showing the area with dimensions, a schedule of the indoor floor areas set against the EYFS space standards for each age band, the proposed maximum number of children, and the proposed use hours for the outdoor space. Where the council asks for it, a Play Space Assessment sets the provision against the relevant local standard.

Drop-off, parking and the highway objection

Nurseries generate a short, intense peak. Almost all arrivals fall in a 45 minute window in the morning and a longer window in the late afternoon, with a high proportion by car in suburban locations. That concentration, rather than the total daily trips, is what the highway authority objects to.

A unit this size will not approach PlanScope's Transport Assessment thresholds of 50 or more dwellings or 2,500 m², so a Transport Statement is the right document. It should cover the proposed number of places, staff numbers, a realistic arrival profile, the existing on-street controls, and the layby or forecourt arrangement for drop-off.

Where the parade already has parking stress, a Parking Survey run over the relevant weekday periods is worth doing before you submit rather than after the objections arrive. A staff travel plan and a staggered session start time are the two mitigations that most often win a highway officer round.

Noise, plant and extraction

Two separate noise questions arise, and they use different methods.

Plant noise from air source heat pumps, air conditioning condensers or a mechanical ventilation unit is a straightforward industrial and commercial source. BS 4142:2014+A1:2019 applies, with a rating level compared to the background sound level at the nearest noise sensitive façade. That belongs in a Noise Impact Assessment.

Children's play noise is not an industrial source and BS 4142 sits awkwardly with it, because the rating penalties for tonality and impulsivity were not designed for voices. Acousticians usually present absolute levels at the nearest residential façade, with the assessment method agreed with the environmental health officer in advance. Agree it in writing before the survey, or you will pay for two.

If the nursery prepares hot meals on site rather than reheating, the extract system needs a route to a suitable discharge point, usually at roof level, with odour control sized to the cooking type. A Ventilation and Extraction Statement covering duct route, termination height, abatement and maintenance is the document environmental health will read. A simple milk kitchen serving reheated food normally does not need one.

The bundle and the conditions to expect

For an application covering the works, with the use relying on Class E flexibility, a typical submission is: application forms and certificates, location and block plans, existing and proposed elevations, the design and access statement, a transport statement, a noise assessment for any plant, an extraction statement where hot food is cooked, and the outdoor space plan with the EYFS schedule.

For the use itself, where a condition or an Article 4 direction forces an application, add a Planning Statement addressing town centre frontage policy, the loss of a financial services unit and the contribution of childcare to the local plan's social infrastructure objectives.

Conditions commonly attached to nursery permissions restrict the maximum number of children on site at any time, fix opening hours (commonly 7.30am to 6.30pm on weekdays only), limit the hours the outdoor area may be used, require the travel plan to be implemented, and require plant to meet a stated noise limit. Read the numbers carefully before you accept them. A cap set at your opening year roll leaves no room to grow, and varying it later means a section 73 application and a fresh round of consultation.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate is the only formal way to confirm that a change of use is lawful.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. The same Class E questions arise for other professional occupiers taking shop units, and the pattern of evidence is similar.

Frequently asked questions

Do I need planning permission to turn a bank into a nursery?

Usually not for the change of use. A bank is Class E(c)(i) and a day nursery is Class E(f), and movement within Class E is not development. Check for a condition on an earlier permission restricting the unit to a named use, and for an Article 4 direction. A certificate of lawfulness under section 192 confirms the position formally.

Does a nursery have to have outdoor play space?

The Early Years Foundation Stage statutory framework requires access to an outdoor play area, or failing that daily outdoor activities. Planning officers treat the quality of the setting as a material consideration. Submit a dimensioned plan of the proposed area, the indoor floor areas against the EYFS space standards, and the proposed maximum number of children.

Will the council assess noise from children playing?

Usually yes, where there are residential neighbours. BS 4142 is designed for industrial and commercial sound and sits awkwardly with children's voices, so acousticians normally present absolute levels at the nearest residential facade using a method agreed with the environmental health officer beforehand. Agreeing that method in writing before the survey avoids paying for a second one.

Do I need an extraction statement for a nursery kitchen?

Only where hot food is cooked on site rather than reheated. A cooking kitchen needs a duct route to a suitable discharge point, usually at roof level, with odour abatement sized to the cooking type and a maintenance regime. A milk kitchen serving reheated meals normally does not require a ventilation and extraction statement.

What conditions are typically imposed on a nursery permission?

A maximum number of children on site at any one time, fixed opening hours, limits on when the outdoor area may be used, implementation of a staff travel plan, and a noise limit for external plant. Check the child numbers cap carefully, because increasing it later needs a section 73 application and fresh consultation.

Sources and further reading

nurserychange of useclass euse classeschildcarecommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →