Costs, Fees and Budgeting

Resubmission fee exemptions and whether one applies to you

7 min readBy PlanScope Editorial Team

The repeat application fee exemption in the 2012 Fees Regulations was removed for applications made on or after 6 December 2023. Other exemptions survive, including the Article 4 one, and they are routinely missed.

Do not budget on the basis of a free second attempt. The planning resubmission fee exemption, the provision practitioners called the free go, sat in regulation 9 of the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, and the amending Regulations that took effect on 6 December 2023 removed it for applications made on or after that date. Other fee exemptions survive, and some of them are more useful than the one that went. Check the current consolidated text of the 2012 Regulations on legislation.gov.uk before you advise a client either way.

That is the short answer. The longer answer matters because the exemption is still described as live in a lot of practice notes, and clients remember it.

What the exemption was designed to do

The free go existed to stop councils being paid twice for the same decision. If an application was refused and the applicant came back with a scheme of the same character on the same site, the authority had already done most of the policy work, so a second fee looked like a penalty on taking officer advice.

In practice it did two useful things. It paid for the risk of submitting a borderline scheme, and it made withdrawal before refusal a sensible tactic rather than an expensive one. Agents used it to test an officer's position on a single issue, usually massing or parking, without the client paying twice.

It also had a cost. Authorities argued that it funded repeat applications that should have been resolved at pre-application stage, and the 2023 fee uplift was presented alongside its removal as a package intended to put more money into planning departments.

The conditions that applied to applicant, site and description

Where you are still dealing with an application made before 6 December 2023, or reading an older decision, the tests were cumulative and strictly applied.

  • Same applicant, or an application made on behalf of the same applicant. A different company in the same group was treated as a different applicant.
  • The same site, meaning the same application site boundary. Adding or removing land from the red line usually defeated the claim.
  • Development of the same character or description as the earlier application. A rear extension replaced by a rear extension of different depth qualified. A rear extension replaced by a loft conversion did not.
  • The earlier application must itself have attracted a fee. You could not chain two exempt applications together.
  • One exemption only, per earlier application.

The phrase that generated the arguments was "same character or description". Officers read it narrowly, and a change of use application followed by an application for operational development on the same land was almost always treated as a different description.

The twelve-month clock and where it started

The period ran for twelve months from the date of the decision notice on the earlier application, not from the date of submission and not from the expiry of the appeal period. For a withdrawn application it ran from the date the earlier application was made.

That distinction caught people out. Withdraw an application eleven months after submitting it and your free go had already expired, because the clock started at submission. Agents who withdrew at the eleventh hour to avoid a refusal on the record sometimes lost the exemption they were protecting.

Appeals did not stop the clock. If you appealed a refusal and lost, the twelve months still ran from the original decision, which is why a parallel resubmission was often lodged at the same time as the appeal. Our note on resubmitting after a refusal and the cost decision looks at that choice in more detail.

Where the position changed

Change Effect Date
Fee uplift to most application types Higher base fees 6 December 2023
Removal of the repeat application exemption No free second application 6 December 2023
Annual indexation of fees Fees rise each year by a published measure From 1 April 2025

The indexation point is the one to build into fee letters. Because the Regulations now provide for an annual uplift, a fee quoted in a January appointment letter may be wrong by the time the application is submitted in April. Quote the fee as at the date of the letter, state that it is indexed annually, and point the client at the published schedule rather than carrying the risk yourself.

The exemptions that are still there

Several fee exemptions and reductions in the 2012 Regulations have nothing to do with resubmission, and they are routinely missed.

  1. Applications required only because permitted development rights were withdrawn, either by an Article 4 direction or by a condition on an earlier permission, attract no fee.
  2. Applications made solely for works to provide access for disabled people to a building to which the public has access, or for the welfare of a disabled person at a dwellinghouse, attract no fee.
  3. Applications for listed building consent attract no fee, which is why a combined application for a listed building takes only the planning fee.
  4. Consent for works to trees protected by a Tree Preservation Order, and notices of works to trees in a conservation area, attract no fee.
  5. Applications under section 73 to vary a condition and under section 96A for a non-material amendment carry flat fees rather than a fee calculated on floorspace or units, which can make a section 73 route cost far less than a fresh application for a large scheme.

The Article 4 exemption is the most valuable of these for anyone working in a conservation area or an HMO direction area, because it applies to the whole application, not to a part of it.

How councils check eligibility

Validation officers check three fields: the applicant name as given on the form, the site address and the red line area, and the description of development. They compare those with the earlier case on the register, and if any of the three has moved they invoice.

Disputes are resolved by the authority in the first instance, and there is no appeal against a fee determination as such. If a council refuses to validate because it says the fee is unpaid, the practical remedies are to pay under protest and seek a refund, or to argue the point in writing and accept that the eight-week clock has not started. Neither is attractive, which is why the covering letter matters.

What to put in the covering letter

Where you claim any fee exemption, say so on the first page rather than burying it. Give the regulation, the earlier application reference, the decision or submission date, and a one-line statement that the applicant, site and description are unchanged. Attach the earlier decision notice.

For an Article 4 claim, state the direction by name and date and confirm that the works would otherwise fall within the relevant class of Schedule 2 to the General Permitted Development Order. Validation officers are not planning officers and will not look the direction up for you.

And price the work on the assumption that there is no free second attempt. The commercial answer to the loss of the free go is to spend more at pre-application stage: a written officer response on the single contentious issue, obtained before submission, now costs less than a refusal. A Planning Statement that engages with the officer's stated concern, rather than restating the scheme, is where that money goes.

Budgeting a pack of supporting documents is a separate exercise, and PlanScope pricing sets out what drafting them costs: one free report, £50 per report, or £150 per month for unlimited reports on the Professional tier.

This is general guidance, not legal advice. Fee regulations change and are indexed annually, so check the current schedule and the consolidated Regulations before relying on any figure, and confirm the position with your local planning authority.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is there still a free resubmission after a planning refusal?

No, for applications made on or after 6 December 2023. The amending Regulations that took effect on that date removed the repeat application exemption from the 2012 Fees Regulations at the same time as raising fees. Check the current consolidated text of those Regulations before advising a client, because fee provisions are amended often.

Did the twelve months run from the decision or the submission?

From the date of the decision notice on the earlier application where it was determined, and from the date the earlier application was made where it was withdrawn. Appeals did not pause the clock, so an applicant who appealed and lost often found the period had already run out against the original decision date.

Which planning fee exemptions still exist?

Applications needed only because permitted development rights were withdrawn by an Article 4 direction or by condition carry no fee. Nor do applications solely for disabled access or welfare works, listed building consent applications, or consent for works to protected trees. Section 73 and section 96A applications carry flat fees rather than floorspace-based ones.

How do I claim the Article 4 fee exemption?

State it on the first page of the covering letter, name the direction and its date, and confirm that the works would otherwise fall within the relevant class of Schedule 2 to the General Permitted Development Order. Validation officers check the form, the site boundary and the description, and they will not research the direction for you.

Are planning fees now indexed each year?

Yes. The 2023 amendment introduced annual indexation of application fees from 1 April 2025, so a figure quoted early in a project may be out of date by submission. Quote the fee as at the date of your letter, say that it is indexed, and refer the client to the published schedule rather than guaranteeing the amount.

Can I appeal against a council's fee decision?

There is no appeal against a fee determination in the way there is against a refusal. If the authority will not validate because it treats the fee as unpaid, the options are to pay and seek a refund, or to argue it in writing while the determination period has not started. Both cost time, so claim exemptions clearly up front.

Sources and further reading

planning feesresubmissionfee exemptionvalidationarticle 4costs

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

Budgeting an ecology package across the survey seasons

Ecology cost is driven by which month you start, not by day rates. Commission the appraisal in autumn, book spring survey slots, and price a second season as a named line.

Read article →
Costs, Fees and Budgeting8 min read

What an appeal actually costs beyond the Inspectorate

No fee is payable to lodge an appeal in England, so the budget is professional time, expert evidence and months of delay. The step from written representations to an inquiry is not incremental.

Read article →
Costs, Fees and Budgeting8 min read

How a community infrastructure levy charging schedule works

Levy liability is arithmetic rather than negotiation. The money is won or lost on the floorspace measurement, the in-use building offset and the order in which the forms are submitted.

Read article →
Costs, Fees and Budgeting7 min read

How full application fees are calculated by units and area

Dwellings are charged per unit, other buildings on floorspace created, outline applications on site area. Mixed schemes add the categories together rather than merging them.

Read article →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →