Refusals and Appeals

Resubmitting after a planning refusal using the free go

7 min readBy PlanScope Editorial Team

After a refusal you can usually submit one revised application for the same development on the same site without a second fee, if you get it in within twelve months and meet four conditions.

If your householder application has been refused, you can usually submit one revised application for the same development on the same site without paying a second fee, provided it goes in within twelve months of the decision. That is the free go. It is set out in regulation 9 of the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, and it exists so that applicants can respond to a refusal without being charged twice for the same scheme. Most householders who resubmit after refusal use the free go without realising it has conditions attached, and those conditions are where people trip up.

What the fee exemption actually covers

The exemption removes the application fee. It does not remove anything else. You still need the full set of drawings, the ownership certificate, the site location plan at a recognised scale and whatever your council's validation list demands for a householder application. If the refusal was partly because the submission was thin, resubmitting the same thin bundle with no fee attached will simply produce a second refusal.

The exemption also applies once per earlier application. One refusal buys one free resubmission, not an open account. If the revised scheme is refused in turn, the next application is chargeable, and the twelve month clock on the original refusal does not restart.

Councils apply this at validation. Your agent, or you, should state on the covering information that the application is a revision of a named reference number and is submitted under the fee exemption. Leave that off and the application sits in the unpaid queue until someone chases you, which can cost a fortnight.

The twelve month clock and when it starts

The window runs from the date of the decision notice on the earlier application, not from the date you received it and not from the date of the committee meeting. Check the notice. Twelve months sounds generous, and then a structural engineer is slow, a neighbour consultation period falls over Christmas, and the deadline arrives with the drawings half finished.

Where the earlier application was withdrawn rather than refused, the window runs from the date of withdrawal. Where you appealed against non-determination, different wording applies, and the sensible move there is to ring the planning support team and ask them to confirm the date they are working from before you submit.

What has to stay the same

Four things have to hold for the exemption to bite, and they are worth checking in this order.

  1. The applicant must be the same person, or the application must be made on their behalf. If the house has been sold, the new owner does not inherit the free go.
  2. The site must be the same, or part of the same site. Shrinking the red line is fine. Adding a strip of a neighbour's garden is not.
  3. The development must be of the same character or description. A rear extension that becomes a rear extension with a smaller footprint qualifies. A rear extension that becomes a detached annexe does not.
  4. A fee must actually have been paid on the earlier application, and that earlier application must not itself have been a free resubmission.

The third test is the one that produces arguments. Officers read character or description broadly where the use and the form of development are unchanged, and narrowly where the revision changes the nature of what is proposed. Reducing a two storey side extension to a single storey side extension is a revision. Replacing it with a dropped kerb application is a new application with a new fee.

Where the exemption does not apply

The exemption attaches to applications for planning permission. It does not cover a listed building consent application, a lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990, or a discharge of conditions submission. If your refused scheme touched a listed building, you will be paying again for the consent even if the planning application itself is free.

It also does not help where the first application was never validated. An application that was returned as invalid was never determined, so there is no decision to resubmit against, though councils will normally refund or carry forward the fee in that situation if you ask promptly.

And it does nothing about the cost of the professional input. A refusal on overlooking grounds may need a revised daylight study. A refusal on design grounds may need the elevations redrawn. The fee is often the smallest line in the budget.

Resubmission or appeal

These are alternatives, and choosing between them is a judgement about why the council said no.

Situation Usually better
Officer identified a specific, fixable harm Revised resubmission
Refusal cited a clear development plan policy conflict you can design out Revised resubmission
Members refused against an officer recommendation to approve Appeal
Refusal turns on a policy interpretation you think is wrong Appeal
You need a decision before a fixed date Appeal only if the householder route applies

Householder appeals run on a twelve week timetable and use a simplified written procedure, so they are faster than most people expect. But an inspector decides the scheme in front of them, with no negotiation and no chance to amend. If the fix is obvious and small, a free resubmission with a short covering statement is nearly always quicker and less fraught than arguing it out. Where members went against their officer, the arithmetic changes, and our note on committee refusals against officer advice sets out why.

You can also do both, in sequence. Appeal the refusal and submit a revised application while the appeal runs. It costs more in time and drawings, and it occasionally annoys the case officer, but for a scheme with a fixed funding deadline it hedges the risk.

Making the changes answer the refusal

Take the reasons for refusal as a numbered list and answer each one in writing. Not in general terms. Reason by reason, with the drawing reference that shows the change.

A refusal that says the extension would appear as a dominant addition to the host dwelling and would harm the character of the street scene is telling you three things: the bulk is wrong, the relationship to the original house is wrong, and the judgement is being made from the public footway. Setting the ridge below the main roof, pulling the flank back from the boundary and showing a verified street elevation deals with all three. Adding a rooflight does not.

Where the refusal cited an appeal decision or a design guide, read it. Inspectors' reasoning on similar schemes is a legitimate material consideration, and using appeal decisions in a planning application is routine practice for agents. It is not binding, and it should be described as indicative rather than as precedent.

A short Planning Statement is the efficient way to carry that argument. For a householder resubmission it does not need to be long: the planning history, the reasons for refusal, the change made in response to each, and the development plan policies the revised scheme now accords with. Two or three pages of that is worth more to a case officer than twenty pages of policy recitation.

As an illustrative example, a rear extension on a 1930s semi refused for a 4 metre projection that breached a 45 degree line from the neighbour's nearest habitable room window might come back at 3 metres with the same internal layout, a flat roof instead of a pitch, and a plan showing the 45 degree test passed. Same character, same site, same applicant, no fee. The drawing does the work, and the statement explains it.

One honest uncertainty: the fee regulations have been amended repeatedly, including the uplift that took effect in December 2023 and the annual indexation that began in April 2025, and the exemption for repeat applications has been the subject of consultation. Check the current consolidated version of the 2012 Regulations on legislation.gov.uk and your council's published fee page before you rely on a free resubmission. This is general guidance rather than legal advice, so confirm the position with your local planning authority or a qualified professional before acting on it.

Once you know which documents the revised application needs, enter your postcode on PlanScope to see which reports the site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How long do I have to use the free go after a refusal?

Twelve months from the date on the decision notice, not from the date you opened the post. Where the earlier application was withdrawn, the window runs from the date of withdrawal. If the deadline is close and your drawings are not ready, ask the planning support team to confirm in writing the date they are working from before you submit anything.

Can I use the free go twice on the same site?

No. One earlier application buys one fee-exempt resubmission. If the revised scheme is also refused, the next application is chargeable, and the original twelve month window does not start again. The earlier application must also have been one on which a fee was actually paid.

Does the free go cover listed building consent?

No. The exemption attaches to applications for planning permission. Listed building consent, lawful development certificates under sections 191 and 192 of the Town and Country Planning Act 1990 and discharge of conditions submissions are charged separately, so a refused scheme affecting a listed building will still carry a consent fee.

Should I appeal or resubmit after a refusal?

Resubmit where the officer identified a specific harm you can design out, because it is faster and cheaper. Appeal where the refusal turns on a policy interpretation you think is wrong, or where members refused against an officer recommendation to approve. An inspector cannot negotiate amendments, so a fixable scheme is better revised than appealed.

Can I change the applicant name on a free resubmission?

Not if you want the exemption. The revised application must be made by or on behalf of the same applicant as the earlier one. A buyer who takes over a site after a refusal does not inherit the free go, so if a sale is in progress it is worth submitting the revision before completion.

Sources and further reading

planning refusalresubmissionplanning feeshouseholder applicationappeals

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals7 min read

Varying or withdrawing an enforcement notice

An authority can withdraw an enforcement notice at any time, or relax its requirements, under section 173A. An inspector can correct and vary it on appeal. Which route applies changes everything.

Read article →
Refusals and Appeals7 min read

Varying a planning condition imposed by an inspector

The inspector has no continuing role once the appeal is decided. A section 73 application to the local planning authority is how an appeal condition gets varied.

Read article →
Refusals and Appeals7 min read

Taking apart a reason for refusal

A refusal notice is a set of separate claims, not a verdict. Split each reason into facts, judgement, policy and evidence gaps, and the route between appeal and resubmission chooses itself.

Read article →
Refusals and Appeals7 min read

What a planning inquiry actually costs to run

Sitting days drive every other line in an inquiry budget. How advocacy, witnesses, case management and event costs behave, and the issues to close before committing.

Read article →
Refusals and Appeals7 min read

Arguing the presumption in favour of sustainable development

The tilted balance only helps if you prove the trigger and then show the harm does not clear the raised threshold. A practitioner's sequence for building that case on evidence.

Read article →
Refusals and Appeals8 min read

Refusal on fire safety information at Gateway One

A Gateway One refusal is usually about what is missing from the drawings rather than anything wrong with the building, which makes it a drafting failure with a determination period attached.

Read article →