Refusals and Appeals

Varying or withdrawing an enforcement notice

7 min readBy PlanScope Editorial Team

An authority can withdraw an enforcement notice at any time, or relax its requirements, under section 173A. An inspector can correct and vary it on appeal. Which route applies changes everything.

A local planning authority can withdraw an enforcement notice at any point, before or after it takes effect, and it can also waive or relax any requirement in the notice, including extending the period for compliance. Both powers sit in section 173A of the Town and Country Planning Act 1990, and the authority has to notify everyone who was served with the original notice. Separately, on appeal, an inspector can correct defects and vary the terms of a notice, provided that can be done without injustice to either side. Those are three different routes to the same practical question, and which one applies determines whether you are negotiating, appealing or ignoring the document.

The power to withdraw

Withdrawal is entirely in the authority's gift. There is no application, no form and no appeal against a refusal to withdraw. An officer who realises the notice names the wrong land, describes the wrong breach or requires something the authority cannot lawfully require will usually withdraw rather than defend it.

Two consequences follow, and the second one catches people out.

Withdrawal extinguishes the notice. Any appeal against it falls away, because there is nothing left to appeal, and the Planning Inspectorate closes the case.

But withdrawal does not prevent a further notice. An authority that withdraws a defective notice is often doing so to issue a properly drafted one, with the same requirements and a fresh compliance period. So pointing out a drafting defect to the enforcement team may improve the notice rather than remove the problem. That is a judgement to make with advice, not a reflex.

Waiving or relaxing a requirement

The relaxation power is the one that gets used most and discussed least. It lets the authority reduce what the notice requires, or extend the time allowed to comply, without withdrawing anything.

For a landlord facing a notice requiring the removal of a rear extension within three months, the realistic outcomes are rarely binary. A longer compliance period to allow a retrospective application to be determined. A reduced requirement substituting alterations for demolition. An agreement to hold the notice while a different scheme is submitted. All of those are available under section 173A and all of them need the officer to be persuaded rather than compelled.

Get any relaxation in writing, in the form of a notice of variation under the section, and check that it names the same notice, the same land and the same requirements. An email saying the council will not press for compliance is worth less than it appears and binds nobody after the officer moves on.

Correction and variation on appeal

Section 176 lets the Secretary of State, in practice an inspector, correct any defect, error or misdescription in a notice, or vary its terms, if satisfied that the correction or variation can be made without injustice to the appellant or the authority.

That power is wide. Inspectors routinely correct the description of the breach, adjust the steps required, extend the compliance period and delete requirements that go further than remedying the breach. An appellant who expects a notice to be quashed over a typographical error is usually disappointed.

Defect Likely outcome on appeal
Misdescribed breach that is clear in substance Corrected
Compliance period too short for the works required Extended
A requirement going beyond remedying the breach Deleted or narrowed
Wrong land identified, where the right land is obvious Corrected
Notice that does not identify the land or the steps at all Nullity, not correctable

The appeal grounds in section 174 are where the substance is argued, and the inspector's reasoning on similar breaches elsewhere is a legitimate consideration, as our note on using appeal decisions in a planning application sets out.

Nullity and invalidity are not the same thing

This distinction decides whether you need to appeal at all, and getting it wrong is expensive.

A notice that is a nullity is no notice. It is so defective on its face that it cannot be understood: it fails to identify the land, or fails to state the breach, or fails to specify the steps required. The courts described the test in Miller-Mead v Minister of Housing and Local Government: if the notice tells the recipient fairly what they have done wrong and what they must do to put it right, it is not a nullity, whatever else is wrong with it. A nullity cannot be corrected on appeal because there is nothing to correct.

A notice that is invalid is a real notice with a defect. It takes effect unless appealed, and the defect is argued on the appeal grounds and dealt with under the correction power.

The practical problem is that treating a notice as a nullity and declining to appeal is a gamble on a legal conclusion. If you are wrong, the appeal period expires, the notice takes effect, and non-compliance becomes a criminal offence under section 179. Very few notices are true nullities. Appeal and argue nullity as part of the appeal, rather than staking everything on it.

Effect of withdrawal on a live appeal

Where the authority withdraws mid-appeal, the appeal ends. You keep nothing from it: no decision, no findings, no determination of the planning merits.

That matters where you were relying on the appeal to obtain a deemed planning application decision. An appeal on ground (a), that permission ought to be granted, carries a deemed application for permission for the development, and winning on that ground produces permission. Withdrawal removes that route, and you are back to making an application.

So before agreeing that a withdrawal is good news, work out whether you wanted the ground (a) decision. On a scheme you intend to keep, you often did.

Costs where a notice is withdrawn late

The Planning Inspectorate can award costs where a party has behaved unreasonably and caused another party to incur wasted expense. Withdrawing an enforcement notice after statements of case and proofs have been exchanged is one of the clearer examples.

Make the application for costs at the right time and in the right form, with the wasted expenditure itemised and evidenced: fees, surveys, counsel, the appeal management work that is now worthless. A general complaint about the council's conduct does not get there. An itemised schedule tied to the dates on which the authority knew the notice was defective does.

Third parties who became involved in the appeal have their own position, which our note on third party involvement in someone else's appeal covers.

Negotiating a varied notice

Enforcement officers have more discretion than their letters suggest, and the approach that works is practical rather than adversarial.

  1. Establish what the authority actually wants. Usually it is the harm removed, not the structure demolished.
  2. Identify the immunity position. The 2023 Act extended the immunity periods in England to ten years, and which limit applies depends on when the breach occurred, so establish the dates with evidence before arguing anything.
  3. Offer a deliverable alternative: screening, a reduced footprint, a restriction on hours or use, a planting scheme.
  4. Ask for a compliance period that matches the time an application and any appeal would take.
  5. Put a retrospective application in alongside, supported by a Planning Statement that addresses the harm identified in the notice rather than the development in the abstract.
  6. Record the agreement as a formal variation under section 173A.

As an illustrative example, a landlord served with a notice requiring removal of an unauthorised third flat within a converted house might negotiate a relaxed requirement allowing retention of two flats with the third returned to ancillary accommodation, a nine month compliance period to carry out the works, and a retrospective application for the two flat layout running in parallel. The authority gets the overdevelopment resolved. The landlord keeps two lettable units instead of losing three.

Where the use is capable of being made acceptable, that is almost always a better outcome for both sides than an appeal fought to a decision. Where it is not, appeal and argue it properly, and browse the report types by category to work out what evidence the ground (a) case needs.

This is general guidance rather than legal advice, so take advice on the notice and the appeal deadline immediately on receipt. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a council withdraw an enforcement notice after it takes effect?

Yes. Section 173A of the Town and Country Planning Act 1990 allows withdrawal whether or not the notice has taken effect, and the authority must notify everyone served with the original. Withdrawal ends any appeal against it, but it does not prevent the authority from issuing a further, better drafted notice.

What is the difference between a nullity and an invalid notice?

A nullity is so defective on its face that it is no notice at all, because it fails to identify the land, the breach or the steps required. An invalid notice is a real notice with a defect, which takes effect unless appealed. Nullity cannot be corrected on appeal, because there is nothing to correct.

Can an inspector change the terms of a notice?

Yes. Section 176 allows correction of any defect, error or misdescription and variation of the terms, provided it can be done without injustice to either party. Inspectors routinely correct the description of the breach, extend compliance periods and delete requirements going beyond remedying the breach.

What happens to my appeal if the notice is withdrawn?

It ends, and you keep nothing from it. That matters where you were relying on ground (a), which carries a deemed application for planning permission, because winning on that ground produces permission. If you wanted that decision, a withdrawal is not necessarily good news.

Can I recover costs if the council withdraws late?

Possibly. The Planning Inspectorate can award costs where a party has behaved unreasonably and caused wasted expense, and withdrawal after statements and proofs have been exchanged is a clear example. Itemise the wasted expenditure and tie it to the dates on which the authority knew the notice was defective.

Should I ask the council to withdraw a defective notice?

Take advice first. An authority that withdraws usually does so to reissue a properly drafted notice with the same requirements and a fresh compliance period. Pointing out a drafting defect can therefore improve the notice rather than remove the problem.

Sources and further reading

enforcementenforcement noticeappealslandlordsplanning process

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals6 min read

Costs awards against objectors and parish councils

Objecting and losing is not unreasonable behaviour. The costs risk for a neighbour or parish council starts with rule 6 status, unevidenced allegations and requesting a hearing then not attending.

Read article →
Refusals and Appeals7 min read

Preparing for a planning hearing without cross examination

The hearing procedure gives you a round-table discussion rather than a contest between advocates. The preparation that wins it is policy analysis, printed properly, and short answers on the day.

Read article →
Refusals and Appeals7 min read

Re-running a refused scheme under changed policy

Section 38(6) requires the decision to follow the plan in force when it is made, so a refused scheme can succeed unchanged. What to evidence, and the section 70A trap.

Read article →
Refusals and Appeals6 min read

Suggesting conditions to a planning inspector

An inspector allowing an appeal has to impose conditions. A schedule agreed with the authority controls the wording you will live with, and a well-drafted condition can answer a reason for refusal.

Read article →
Refusals and Appeals7 min read

Appeals where the council refused against officer advice

A refusal contrary to the officer recommendation leaves the authority defending reasons its own adviser rejected. The procedural consequences, the costs grounds and the evidence to gather first.

Read article →
Refusals and Appeals7 min read

Submitting a section 106 obligation during an appeal

Where a refusal reason turns on the absence of a planning obligation, the appeal needs a completed unilateral undertaking before the Inspectorate's deadline. The vehicle, the tests and the drafting.

Read article →