Flood, Drainage and SuDS

Safe access and egress in a flood event

7 min readBy PlanScope Editorial Team

A scheme can have floor levels well above the flood and still fail on access. The assessment is about people leaving, arriving and being reached during the event.

Safe access and egress is assessed separately from finished floor levels, and it is the limb that catches schemes whose flood risk assessment otherwise looks solid. Raising a building above the design flood level protects the building. It says nothing about how the people inside get out, how emergency services reach them, or what happens when the access road floods two hours before the site does.

Those are different questions, and they need their own evidence.

What safe access means in flood risk terms

The requirement comes from the second limb of the exception test and from the general expectation in national policy that development should be safe for its lifetime. The Planning Practice Guidance on flood risk and coastal change treats safe access and egress as a matter for the local planning authority to judge, informed by its consultees.

In practice three outcomes are recognised, in descending order of strength.

A dry route, where occupants can walk from the building to land outside the floodplain without entering flood water at any point during the design event.

A wet route, where the route floods but the depth and velocity remain within a low hazard band for the whole event, and the route is short, well defined and usable by the people who will need it.

Refuge in place, where occupants remain in the building above the flood level, with a means of raising the alarm and, where necessary, of being reached by boat or high axle vehicle.

Say which one the scheme relies on, in those words, early in the Flood Risk Assessment. Officers spend a lot of time working out which case is being made.

Dry routes, wet routes and refuge in place

A dry route has to be demonstrated, not asserted. Draw it on a plan with levels along its length, show the modelled flood extent for the design event including the climate change allowance, and state the lowest point on the route in metres above ordnance datum against the flood level at that point.

The common failure is a route that is dry across the site and floods 200 metres away on the lane. Extend the assessment to the point where the route reaches land that does not flood, even where that is outside the application site.

For a wet route, the analysis is about hazard rather than presence of water. Give depth and velocity at intervals along the route, the resulting hazard band, and the duration for which each condition persists. A route that is passable for the first hour and impassable for six is a route that has to be used early or not at all, and that changes the evacuation plan.

Refuge in place is the weakest position and is not usually acceptable for more vulnerable development where people may be less able to help themselves. Where it is proposed, the refuge has to be above the flood level, of adequate size, reachable internally without passing through flood water, and provided with a means of communication.

Depth and velocity thresholds used to judge safety

Hazard is a function of depth and velocity together, and the standard approach combines them into a hazard rating with an allowance for debris. The output is banded, running from low hazard, through danger for some people, danger for most people, and danger for all including emergency services.

Two practical points follow.

Shallow fast water is dangerous. A 250 millimetre depth moving at two metres per second is a serious hazard to an adult on foot, and considerably worse for a child. Assessments that report depth alone are incomplete.

The band that matters depends on who is using the route. A route rated as dangerous for some may be acceptable for a scheme of self-contained flats occupied by working adults and unacceptable for a care home or a school.

Report the numbers rather than the conclusion. Give depth, velocity, hazard rating and band at the critical points, and let the consultee check the arithmetic.

The emergency planning officer's role

The council's emergency planning officer, and in some areas the local resilience forum, comments on whether an evacuation proposal is deliverable. Their questions are practical rather than hydraulic.

Who issues the instruction to leave. How occupants are contacted at 3am. Where they go, and whether that place has capacity. Who checks that everyone has left. What happens to people with mobility difficulties. Whether the route is lit and signed. How the plan survives a change of ownership.

Answer those in the plan itself rather than in the flood risk assessment, and share a draft before submission. An emergency planning officer who has seen the plan and had their comments taken up is far more likely to support it than one who receives it during consultation.

Flood warning services and lead times

Warning lead time is often the decisive practical factor. On a large lowland river with a formal flood warning service, several hours of notice may be available, which makes a managed evacuation realistic. On a small flashy catchment or where surface water is the mechanism, there may be no meaningful warning at all, and a plan that depends on one is not a plan.

Establish three things: whether the site is within an Environment Agency flood warning area, what the typical lead time is for that area, and what the mechanism is by which residents will actually receive the message. Sign-up to the warning service should be a condition of occupancy in the plan, with responsibility allocated to a named role.

Where no warning service covers the site, say so and design the response accordingly. That usually pushes the scheme towards a dry route or towards refuge with a carefully specified means of communication.

Where evacuation plans are secured by condition

Councils secure the plan by condition, normally requiring it to be submitted and approved before occupation and to be implemented and maintained thereafter. Some authorities also require periodic review.

For a single dwelling the plan is short. For a managed development it needs a responsible role, a testing regime and a mechanism for passing the obligation to a successor management company. Draft it so it survives the developer leaving the site.

Where the drainage design has a role in the answer, keep the two documents consistent. Exceedance routing in the Drainage Strategy should not send surface water down the route you have described as the dry means of escape.

Presenting the case where a fully dry route is impossible

Plenty of sites cannot achieve a dry route, and applications do succeed without one. What distinguishes the successful ones is that they engage with the problem rather than describing around it.

Set out, in order: the constraint that prevents a dry route, the alternatives considered and rejected, the hazard analysis of the route relied on, the warning lead time available, the evacuation or refuge arrangements, and the residual risk that remains after all of it. Then say plainly what the residual risk is and who bears it.

Cross-reference the conclusion to the Exception Test where one applies, because safe access is part of the second limb rather than a separate policy hurdle, and pull the whole argument together in the Planning Statement so the officer has one place to look.

An illustrative example: a brownfield site with 120 flats where the access road floods to 180 millimetres at a velocity of 0.3 metres per second for around three hours during the design event, with a four hour warning lead time from a formal flood warning area, a refuge on the first floor and above for every unit, and a plan requiring managed evacuation on receipt of a flood warning. That combination has a coherent story. The same site with no warning service and no refuge does not.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

What does safe access actually mean?

A route by which occupants can leave the site, and emergency services can reach it, during the design flood event without being exposed to unacceptable hazard. The preferred form is a route that stays dry throughout. Where that cannot be achieved, the assessment considers depth, velocity, route length, lighting, the users involved and how the route is managed during a flood.

Is a dry route always required?

No, but it is the strongest position. National guidance treats safe access as a matter of judgement for the local planning authority, informed by the Environment Agency and the emergency planning officer. Less vulnerable uses, and sites with reliable warning lead times and a refuge above the flood level, have succeeded without a fully dry route.

How is flood hazard measured?

Using a hazard rating that combines depth and velocity, with an allowance for debris. The result is banded, running from low hazard through danger for some, danger for most and danger for all. Fast shallow water can be more dangerous than deep still water, which is why depth alone is not an adequate test.

Who decides whether the route is acceptable?

The local planning authority, as decision maker. The Environment Agency comments on flood risk and often on the principle of the route, and the council's emergency planning officer comments on evacuation practicality. Where those two disagree, the council has to reach a view, so it helps to have engaged with both before submission.

What is a flood warning and evacuation plan?

A written document setting out who receives warnings, how they are received, what happens at each stage, where people go, who is responsible for triggering the plan, and how it is tested and updated. Councils normally secure it by condition and require it to be in place before occupation. For managed sites, name the role rather than the individual.

Sources and further reading

safe accessegressflood riskevacuation planhazard rating

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Flood, Drainage and SuDS

View all →
Flood, Drainage and SuDS8 min read

Local resilience forums and flood emergency planning

Flood emergency planning sits with local resilience forums under the Civil Contingencies Act, not with the planning system. Here is how the two meet.

Read article →
Flood, Drainage and SuDS8 min read

Sewerage design standards and sewer adoption approval

Adoptable sewers are designed to the sewerage undertaker's standards, not the council's. Here is what governs the layout, how the application runs and where the programme slips.

Read article →
Flood, Drainage and SuDS6 min read

Flood Re and what buyers will ask about

Homes built on or after 1 January 2009 cannot use Flood Re, so new build insurance rests on the open market. What to hand over at completion and what not to promise.

Read article →
Flood, Drainage and SuDS7 min read

Trash screens and the liability they create

Screens protect a culvert and introduce a new flood risk upstream. How blockage is modelled, which designs degrade gracefully, and who maintains the structure afterwards.

Read article →
Flood, Drainage and SuDS7 min read

Car park change of use and surface water retrofit

An existing impermeable site protects you from a greenfield requirement but not from a betterment expectation. How to evidence the baseline discharge and what the strategy must show.

Read article →
Flood, Drainage and SuDS7 min read

Attenuation under an adopted highway: what is allowed

Highway authorities rarely accept attenuation storage under an adopted carriageway. The reasons, the technical bar where it is considered, and the alternatives that keep storage inside the site.

Read article →