Costs, Fees and Budgeting

When a second application is free after a refusal

6 min readBy PlanScope Editorial Team

One further application of the same character, on the same site, by the same applicant, within 12 months of a refusal or withdrawal, carries no statutory fee. The character test is where most claims fail.

If your application has been refused, you can usually submit one further application on the same site without paying another fee, provided it is of the same character and description, made by the same applicant, and submitted within 12 months of the earlier decision. The concession sits in the planning fees regulations and applies once. It is not a right to keep resubmitting until something sticks, and councils check the conditions carefully before accepting a nil fee.

What the concession covers

The exemption is available after a refusal, after a withdrawal, and after an appeal against the council's failure to determine. The 12 months runs from the date of the decision notice, the date of withdrawal, or the expiry of the determination period, depending on which applies.

Four conditions have to be satisfied together. The further application must relate to the same site. It must be made by, or on behalf of, the same applicant. It must be for development of the same character or description as the earlier application. And it must arrive within the 12-month window.

The earlier application must also have been a chargeable one that was paid for. You cannot claim a free application off the back of an application that was itself free, which is what stops the concession running indefinitely.

The same character and description test

This is where most claims fail, and the test is applied by the council rather than by you.

A redesign that keeps the same use, the same broad scale and the same position on the site will usually qualify. Reducing a two-storey rear extension to single storey, changing the roof form, moving a window, altering materials, or pulling an extension back from a boundary are all changes within the same character.

What tends to fall outside it is a change of use, a change in the number of units, a substantially different site area, or a scheme so altered that the council would describe the development differently on the decision notice. If you find yourself rewriting the description of development, the concession is probably gone.

The red line matters. Extending the application site to bring in extra land changes the site, and some authorities treat that as fatal to the claim even where the building is similar.

Change from the refused scheme Usually within the concession
Reduced depth, height or footprint Yes
Different roof form or materials Yes
Repositioned within the same plot Usually
Additional dwelling added No
Different use proposed No
Site boundary materially extended Usually not

The 12-month window and how it is counted

The clock runs from the date on the decision notice, not from the date you received it, and not from the date the officer told you the recommendation. Where the earlier application was withdrawn, it runs from the date of withdrawal confirmed by the council.

Twelve months sounds like plenty and is not. A householder redesign needs a conversation with the architect, revised drawings, possibly a fresh survey, and a pre-application discussion if the refusal was contentious. Book the work in the first month rather than the eleventh.

Where the deadline is close, submit within the window even if the drawings could be better. An application received on day 360 with a small revision left to make is in better shape than a perfect one on day 370, because the second one costs the full fee.

One free application per permission

The concession is available once against each earlier chargeable application. Use it, and the next application on that site attracts the full fee again.

That has a strategic consequence worth thinking about before you spend it. If your refusal turned on a single design point that the officer has clearly explained, and you are confident the revision answers it, use the free application now. If the refusal turned on something contested, where the council's position may change after a pre-application discussion or after the adoption of a new local plan policy, holding the concession back can be the better play. There is no way to pause the 12 months, so this is a judgement rather than an option.

Note also that a free statutory fee is not the same as a free submission. Where you apply through the Planning Portal, the Portal's own service charge is separate from the statutory fee and is still payable. Check the current figure at the point of submission.

Where a council disputes eligibility

Claims are refused more often for procedural reasons than for substantive ones. Deal with that by claiming clearly.

  1. State in the covering letter that the application is submitted under the fee exemption for a further application of the same character.
  2. Give the earlier application reference and the date of the decision or withdrawal.
  3. Confirm the applicant is the same person or entity, and explain any change of agent.
  4. Describe in two sentences what has changed from the refused scheme and why it remains the same character.
  5. Attach a comparison of the refused and revised drawings if the changes are extensive.

If the validation team says the fee is payable, ask which limb of the test they consider unsatisfied. There is no right of appeal against a validation decision, so the exchange has to be resolved by discussion. Where the programme matters more than the money, pay under protest, say so in writing, and ask for a refund once the point is agreed.

Choosing between a resubmission and an appeal

Both routes are open after a refusal, and they suit different problems.

A resubmission is right where the refusal reason can be designed out. It is faster, the determination period is eight weeks for a householder application, you keep control of the scheme, and the case officer already knows the site. It also lets you respond to the officer's report, which usually explains the objection more clearly than the reasons for refusal do.

An appeal is right where the council has misapplied policy, where the objection cannot be designed out without losing the point of the project, or where the relationship with the authority has broken down. It takes months rather than weeks and it puts the decision with someone who has never seen the site before.

Running both is legitimate. Lodging an appeal to protect the deadline while a revised application is determined happens often, and it costs nothing extra beyond the work.

A Planning Statement that addresses the previous refusal directly, reason by reason, is the single most useful document to submit with a resubmission. Where the refusal pointed at missing technical evidence rather than at design, work through the report types index to identify what was absent. PlanScope's pricing is one free report, £50 per report, or £150 per month for the Professional tier, which sits separately from the statutory application fee.

This is general guidance, not legal advice. Fee exemptions are set out in the national fees regulations and applied by each council, so check the position with your local planning authority before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How long do I have to use the free application?

Twelve months from the date on the decision notice, from the date the earlier application was withdrawn, or from the expiry of the determination period where an appeal was made against non-determination. The clock runs from the notice date rather than from when you received it, and there is no way to pause it.

What does same character or description mean?

The development must be recognisably the same proposal. Reducing the size, changing the roof form, altering materials or repositioning within the plot usually qualifies. Adding a dwelling, changing the use or materially extending the red line site does not. If you are rewriting the description of development, the concession has probably gone.

Can I use the concession more than once?

No. It is available once against each earlier chargeable application, and you cannot claim it off the back of an application that was itself free. Decide deliberately whether to spend it now on a straightforward redesign or hold it while a contested point is resolved through pre-application discussion.

Do I still pay anything if the fee is nil?

Where you submit through the Planning Portal, the Portal's own service charge is separate from the statutory fee and remains payable. Any professional fees for revised drawings and supporting documents also stand. Check the current service charge at the point of submission rather than assuming the whole exercise is free.

How do I claim it so the application is not invalidated?

Say so in the covering letter. Give the earlier application reference and the decision or withdrawal date, confirm the applicant is unchanged, and explain in two sentences what has altered and why it remains the same character. Attaching a drawing comparison helps where the revisions are extensive.

Sources and further reading

planning feesresubmissionrefusalhouseholdervalidation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

Section 192 certificates and the half fee rule

The fee for a section 192 certificate of lawfulness for proposed development is half the corresponding planning application fee. Here is what the certificate can confirm, how precisely to describe the proposal, and when a planning application is the better buy.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a scheme that needs a habitats regulations assessment

The assessment is the council's duty and the applicant's cost. Why mitigation cannot be counted at screening, what secures it for the lifetime of the development, and how to programme the obligation.

Read article →
Costs, Fees and Budgeting7 min read

Who pays when a consultee asks for more work

Consultee requests arrive after validation because validation never tested adequacy. The scoping agreement and the additional services clause decide who pays, and a condition is often the better answer.

Read article →
Costs, Fees and Budgeting7 min read

Discharging an archaeological condition in phases

An archaeological condition has three limbs and each is a separate discharge. How to secure phased approval, what the curator charges for, and where the post-excavation tail hides.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting for Active Travel England engagement

The statutory thresholds are 150 dwellings, 7,500 m² of floorspace or 5 hectares. What the assessment tool looks for, which design changes follow an objection, and how to programme the engagement.

Read article →
Costs, Fees and Budgeting7 min read

Temporary traffic orders and construction access costs

Construction access runs on statutory timetables set by the highway authority. Which works need an order, what the lead times are, and the charges that overrun on urban sites.

Read article →