Self storage in Class B8 and the job density objection
Councils rarely dispute that self storage is Class B8. They dispute jobs per square metre. Here is the evidence base that answers an employment land objection.
Self storage sits within Class B8 of the Use Classes Order as storage or distribution, which means it is usually an employment use on employment land. The self storage employment land objection is therefore not about the use class at all. It is about jobs per square metre, and the officer's report will say that a store of several thousand square metres supports only a handful of staff while the general industrial units it replaces would have supported many more.
That objection is answerable. It needs evidence rather than assertion, and it needs to be in the submission rather than produced at committee.
Whether self storage really is Class B8
Class B8 covers use for storage or as a distribution centre. Self storage is the storage of goods, so the starting point is straightforward, and appeal decisions have generally treated self storage facilities as falling within B8. Treat that as the indicative position rather than a settled rule, because the facts of each operation matter.
Two features complicate it. The first is customer access: members of the public come and go, which gives the building a retail feel that a conventional warehouse does not have. The second is the sale of boxes, tape and padlocks at reception. Where that retail element is incidental to the storage use it stays ancillary, and the sensible approach is to offer a condition capping the retail floorspace and restricting sales to customers of the facility. Where a scheme proposes a trade counter, van hire and open retail of packaging to the public, a council can reasonably argue a mixed use outside any single class.
Describe the operation precisely in the application. Unit sizes and numbers, the proportion of business against domestic customers, staffing, opening hours, access arrangements and the proposed retail area. Vague descriptions invite the council to impose its own, usually narrower, interpretation.
The employment land policy test
Most adopted local plans protect allocated and existing employment land from loss to other uses, and many go further with policies seeking the most efficient use of employment floorspace. Self storage does not take land out of the employment portfolio, since B8 is an employment use, so the policy objection is rarely a loss argument. It is an efficiency argument.
Employment density is the metric officers reach for. Published density guidance gives floorspace per full time job for different uses, and self storage sits at the sparse end of the range because the building is mostly rented space with no production activity in it. A general industrial building of the same footprint will support considerably more direct employment. Officers are right about that, and a submission that denies it loses credibility.
The case therefore has to be built on four other grounds:
- What the alternative realistically is. If the site has been marketed for conventional industrial occupation without success, the comparison is not self storage against a busy factory. It is self storage against a vacant shed or a cleared site.
- Who the customers are. Where a material share of units serve small businesses, trades and online sellers who have no other storage option locally, the facility supports employment indirectly, and a customer profile from existing stores in the operator's portfolio is real evidence.
- Whether the floorspace is reversible. A steel framed, clear span building with level access can revert to conventional B8 or B2 occupation later, which a highly fitted specialist building cannot.
- Construction and fit out employment, stated honestly as temporary.
An Employment Land Assessment is the document that carries the first and third points, with the marketing history, the site's constraints and the supply position in the local plan evidence base. An Economic Impact Assessment carries the second and fourth. Keep them separate, because an officer reading a single document that mixes supply analysis with benefit claims tends to discount both.
Marketing evidence that actually persuades
Councils see weak marketing evidence constantly. What survives scrutiny is a record covering a sustained period, usually at least 12 months and often longer where the plan policy sets a period, with the agent named, the asking rent or price stated, the particulars attached, the enquiry log included and the reasons given by parties who looked and declined.
Where the site is physically unsuited to its allocated use, say why with measurements. Restricted yard depth, inadequate headroom, a weight restricted access, no HGV turning circle or a level difference that cannot be serviced are all reasons a shed cannot be let as a shed, and they carry more weight than a general statement about market conditions.
Trip generation and the servicing case
Self storage has one of the lowest trip rates of any commercial use per square metre, which is a planning advantage worth quantifying. Customer visits are intermittent, mostly in cars and small vans, and the weekend peak is usually higher than the weekday morning peak, so the development loads the network when it is quietest.
A Transport Statement should present trip rates from a recognised database for the correct land use category, applied to the proposed floorspace, with a comparison against the trip generation of the lawful or allocated use. Where the comparison shows a reduction against a notional industrial occupation, that is a material benefit and should be stated plainly. Set out the swept path for the largest vehicle expected at the loading bay, the number of parking spaces at the loading area rather than just the total, and the van hire fleet if one is proposed, because parked hire vans are a common source of objection and a common breach of condition.
Hours, amenity and the external design
Twenty four hour customer access is what operators want and what residential neighbours resist. The honest position is that most movements in the small hours are very few, and a condition restricting access hours where the site adjoins housing is usually acceptable commercially. Offer it rather than fight it.
The building itself is the other difficulty. A self storage box is tall, deep and largely blank, with the roller shutters internal and the only windows at the reception corner. On an industrial estate that is unremarkable. On an edge of centre site or a prominent corner it needs work: breaking the elevation into bays, a recessed and glazed entrance, a restrained colour palette rather than corporate branding across the full flank, and a landscape strip deep enough to hold trees that will grow. The Design and Access Statement should show long views along the street with the building in them.
Fire safety, sprinklers and what planning can control
Self storage buildings hold large volumes of unknown combustible material in a single compartment, so fire engineering matters. Most of it sits under the Building Regulations rather than planning, with Approved Document B governing compartmentation, means of escape, access for fire appliances and water supplies for firefighting.
Planning Gateway One and the Fire Statement requirement under Article 9A of the Development Management Procedure Order 2015 apply to relevant buildings in the residential sense, so a standalone self storage building does not normally trigger them. Where storage forms part of a mixed scheme with residential above a certain height, it does, and a Fire Statement must then be prepared by someone with the necessary fire engineering competence. A sprinkler installation is usually driven by the insurer and the fire service rather than by a planning condition, but access for appliances, hydrant provision and the turning area are site layout matters that planning does decide, so fix them on the layout drawing early.
The pack that answers the objection
For a self storage application on employment land, submit a planning statement that engages directly with the employment density point, an employment land assessment with the marketing record, an economic statement describing the customer base, a transport statement with a comparative trip generation, a drainage strategy and the design material. Add a lighting layout where the site adjoins housing or habitat, and a construction management plan.
PlanScope can draft the planning, employment, economic and transport documents from your site details and the answers in the guided flow, and it flags the site against flood, heritage and designated site data while you work. Fire engineering and any specialist acoustic input need a qualified professional, and the Fire Statement is a document the regulations expect a competent fire engineer to author.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Is self storage Class B8 or sui generis?
Self storage is the storage of goods, so Class B8 is the normal starting point and appeal decisions have generally treated it that way. Treat it as indicative rather than settled. A trade counter, van hire and open retail sales of packaging can push an operation towards a mixed use, so describe the operation precisely and offer a condition capping retail floorspace.
Why do councils object to self storage on employment land?
Because employment density is low. A store of several thousand square metres is mostly rented space and supports few direct jobs, while general industrial floorspace of the same size would support many more. The objection is about efficient use of employment land rather than loss of it, since B8 remains an employment use.
How much marketing evidence is needed?
Follow the period set by the adopted local plan policy, commonly at least 12 months. Include the agent's name, the asking rent or price, the particulars, a dated enquiry log and the reasons parties gave for not proceeding. Physical constraints such as restricted yard depth or no HGV turning circle carry more weight than general market commentary.
Does a self storage building need a Fire Statement?
Normally no. Planning Gateway One and the Article 9A requirement under the Development Management Procedure Order 2015 apply to relevant residential buildings, so a standalone store falls outside them. Where storage forms part of a taller mixed use scheme with homes, a Fire Statement is required and must be prepared by someone with fire engineering competence.
Will 24 hour customer access be allowed?
It depends on what the site adjoins. On an established industrial estate unrestricted access is often accepted. Next to housing, councils commonly condition access hours, and offering a restriction at submission is usually better than defending unrestricted access, since night movements at a store are few and the commercial loss is limited.