Site information a postcode cannot tell you
Designation layers load from a postcode. Levels, ground conditions, title, previous extensions and neighbouring window positions do not, and applications turn on them.
A postcode will tell you a great deal about a site. It will not tell you how much the garden falls from the house to the back fence, what is under the lawn, who owns the strip of land your access crosses, or where your neighbour's bedroom window sits. Every one of those is site information a planning application needs, and none of it arrives from a map.
That gap matters because the first part of preparing an application feels deceptively complete. Constraint data loads in seconds. The measured survey takes a fortnight and costs money. The temptation is to treat the fast part as the whole job.
What a postcode and an aerial image actually give you
Public datasets are good now. From a postcode you can establish the flood zone from the Environment Agency's Flood Map for Planning, whether the property is listed and at what grade from the National Heritage List, whether it sits in a conservation area, whether there is a site of special scientific interest nearby, and whether the area is covered by an air quality management area.
PlanScope checks those layers automatically, along with building footprints and street-level imagery within 500 metres, and uses them to flag which reports a project is likely to need. That is the designation picture, and it is reliable at the level it operates.
What it is not is a site survey. Designations tell you which rules apply. They say nothing about whether the thing you want to build fits, stands up, drains or affects anybody.
Levels and what has to be measured
Ground levels decide more householder applications than any other unrecorded fact. Ridge height is measured from existing ground level, and on a sloping plot the ground level at the front and the back of a house can differ by a metre or more. A rear extension designed on a flat drawing becomes a taller structure than the applicant intended, and the height limits in the permitted development regime are measured from the highest adjoining ground.
A topographic survey sorts it out. For a modest extension a measured survey of the house and its immediate curtilage is usually enough, and it should record levels at the boundaries as well as at the building.
Existing drainage runs, manhole positions and invert levels belong in the same exercise. Building over or near a public sewer changes what you can do and brings the water company into the process.
Ground conditions below the surface
Nothing about the ground shows on an aerial photograph. Made ground from a demolished outbuilding, a filled pond, shallow clay that shrinks in dry summers, an old fuel tank, a former orchard sprayed for decades: all of it is found by digging or by records, not by looking.
Historic mapping costs little and is often the most informative first step. A sequence of old plans showing the plot as a garage forecourt in 1960 tells you to expect a contaminated land assessment rather than discovering the issue when the council's environmental health officer reads the application.
But trial pits and boreholes come later, and they cost more. On a small extension they are rarely needed for planning, though foundation depth near trees is a separate question that the structural engineer will raise regardless.
Ownership, access rights and the certificates
Every planning application requires a certificate of ownership. Certificate A says the applicant owns the whole application site. Certificates B, C and D deal with land in other ownership, and they require notice to be served on the other owners. Getting this wrong makes the permission vulnerable, and an application with a false certificate can be challenged.
The underlying facts come from the title register and the title plan, not from the fence line. Boundaries on the ground move over decades. A driveway that has always been used may be used under an easement, under a licence, or under nothing at all.
Agricultural tenancies bring a further notice requirement, and shared accesses, rights of way and service media crossing third party land all need checking before the red line is drawn. Draw the red line around the land you need, including any land where works to form an access will happen, and confirm who owns it.
The existing building and its history
Construction date and build-up decide what is possible. A 1930s semi with solid nine inch brick walls, a 1970s house with a cavity and a timber first floor, and a Victorian terrace with lath and plaster all behave differently when you remove a wall or add a storey.
Whether the property has already been extended matters even more. Permitted development allowances are cumulative, and an earlier rear addition counts against the current proposal even if a previous owner built it. Council planning records and building control records are the place to look, and they are frequently incomplete for works before the 1990s.
Where a loft or garage conversion is proposed, a structural survey establishes whether the existing structure can take the change. That is not information any dataset holds.
Neighbouring windows and internal layouts
The tests that decide amenity objections depend on the neighbour's building, not yours. The 45 degree test is drawn from the nearest edge of the neighbour's habitable room window. The 25 degree line for daylight is taken from the centre of that window. Neither can be drawn without knowing which window serves which room and at what height it sits.
Aerial imagery does not show window positions on a rear elevation with any reliability, and it never shows which room is behind the glass. A photograph from the applicant's own garden, taken with permission and a tape measure, answers it in ten minutes.
Boundary treatment matters too. A two metre close boarded fence, a mature hedge or an existing outbuilding changes the visual relationship, and officers visit the site to see it.
Commissioning surveys in the right order
Sequence the work so that each survey informs the next rather than repeating it.
- Pull the public constraint data and the title register first, because they are quick and they shape everything else.
- Commission the measured and topographic survey, including levels at the boundaries and drainage.
- Look at historic mapping and council records for previous extensions, ground history and any earlier refusals.
- Add specialist surveys only where a constraint or the design triggers them, such as trees, bats or contamination.
- Photograph the neighbouring elevations and the boundary treatment before the drawings are finalised.
An AI-assisted draft can be written around missing facts, and PlanScope inserts a clear to be confirmed flag rather than inventing a figure where site data has not been supplied. That is a safeguard, not a substitute. Every one of those flags is a question somebody has to answer with a measurement, a title document or a photograph before the application is submitted.
Where the answer needs professional judgement, the reviewers listed in the professional directory are the route to a signed-off document, and the pricing page sets out what a draft costs before that review.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.
Frequently asked questions
What can be checked from a postcode alone?
Flood zone from the Environment Agency's Flood Map for Planning, listed building status and grade from the National Heritage List, conservation area coverage, nearby sites of special scientific interest and air quality management areas. That is the designation picture. It tells you which rules apply, not whether your proposal works on the ground.
Do I need a topographic survey for a house extension?
Usually yes on anything but a level plot. Height limits in the permitted development regime are measured from the highest adjoining ground, and a garden that falls a metre from house to boundary changes what counts as compliant. A measured survey of the house and curtilage, with boundary levels and drainage, is the normal scope.
Why does the ownership certificate matter?
Every application needs one, and it must be accurate. Certificate A applies where the applicant owns the whole site. Certificates B, C and D cover land in other ownership and require notice to be served. A false certificate leaves the permission open to challenge, so work from the title register rather than from the fence line.
How do I find out if a house has already been extended?
Check the council's online planning register and, where available, building control records, then compare against historic mapping. Permitted development allowances are cumulative, so an extension built by a previous owner counts against yours. Records before the 1990s are often patchy, which is why a physical inspection of the building matters.
What does a to be confirmed flag in a draft report mean?
It marks a place where site-specific information has not been supplied, so the draft has left a gap rather than inventing a figure. Each flag is a question that needs answering with a measurement, a title document, a survey or a photograph before submission. A reviewer should check that none remain in the final report.