Solar farms on farmland: the land quality argument

7 min readBy PlanScope Editorial Team

Provisional land quality mapping does not separate grade 3a from 3b, and that distinction decides solar applications. Survey early or lose a season.

Solar farm applications on agricultural land are decided on two things: what the land is worth for farming, and what the scheme looks like from the footpath. The second gets the objections. The first decides the officer's recommendation, and it is the one developers are least prepared for, because the answer is not available from any published map.

Best and most versatile land means grades 1, 2 and 3a. The published provisional classification mapping does not separate 3a from 3b. It shows a single grade 3, and on lowland arable England a great deal of the country falls into it. So the map cannot tell you whether your site is best and most versatile, and the whole policy argument turns on that distinction.

What the classification measures

The system grades land by the degree to which physical characteristics limit its agricultural use. Climate comes first and cannot be mitigated: rainfall, temperature, exposure, altitude. Site factors come next: gradient, flood risk, microrelief. Soil factors come last and take the most work: texture, depth, stoniness, and wetness class derived from the interaction between soil and climate.

Those combine into grades 1 through 5, with grade 3 divided into 3a, good quality, and 3b, moderate quality.

The interaction between soil and climate is what makes provisional mapping unreliable at site level. A soil that is grade 2 in a dry eastern county can be grade 3b in a wetter western one, because wetness class depends on rainfall. Mapping produced at a small scale for regional purposes cannot capture that at field level.

Commissioning the survey properly

A detailed survey means fieldwork. Auger borings on a grid, conventionally at a density of around one per hectare, with soil pits dug to confirm the profile at representative points, and each boring described for texture, stone content, depth and mottling.

Three points on programme.

Commission it at option stage. The result can kill a site, and it is far better to know that before the grid connection deposit is paid.

Protect the window. The ground has to be augerable, which rules out frozen and saturated conditions. On heavy land in a wet winter the survey simply cannot be done, and a scheme waiting on it loses months.

Use someone qualified. Councils expect the survey to be carried out by a soil scientist working to the recognised guidelines, and the survey report should include the boring locations, the field descriptions, the grade assigned to each parcel and a plan showing the graded areas. Set out the results in an Agricultural Land Classification report rather than as an appendix nobody reads, and expect professional review of the work.

The result is frequently better than feared. Sites shown as provisional grade 3 often survey out as substantially 3b, and that finding does more for an application than any amount of policy argument.

Framing the temporary and reversible case

Where some best and most versatile land is affected, the argument that carries weight is that a solar farm is not a loss of that land. It is a change in its use for a defined period.

Make that concrete rather than asserting it.

State the period. Permissions are commonly sought for a defined operational life with a condition requiring decommissioning and restoration at the end, and the period should be stated in the description of development.

Describe the construction method. Piled or screw foundations rather than concrete pads. Cable trenches reinstated with topsoil and subsoil returned in sequence. Internal tracks built over a geotextile so that the material can be lifted and the soil profile recovered. Minimal permanent structures, with substation and storage compounds sited on the poorest land available.

Describe soil protection during construction. A soil resource survey, a soil management plan setting out when machinery may travel and how soils are stripped and stored, and a named person responsible for stopping work when conditions are too wet.

Describe the end. A decommissioning and restoration scheme secured by condition, including removal of all above ground and below ground infrastructure to an agreed depth, decompaction, and reinstatement to agricultural use.

Then say what happens in between: sheep grazing, wildflower understorey, hedgerow restoration and the soil carbon benefit of taking arable land out of cultivation for a generation.

Landscape, and the mitigation that is available

Solar farms are low, wide and regular. They are rarely visible from far away and they are very visible from close by, particularly from public rights of way crossing or bounding the site.

A Landscape and Visual Impact Assessment prepared to the recognised guidelines is standard for a scheme of any size. Two things determine its usefulness: viewpoints agreed with the council rather than chosen, and honest treatment of the years before planting matures.

The mitigation available is limited but effective. Set the array back from field boundaries. Reinforce existing hedgerows and let them grow taller rather than planting new belts that read as suburban. Keep the array off ridgelines and out of the skyline from the nearest footpath. Screen the substation compound properly, since it is the tallest and most industrial element. Use dark, non-reflective fencing and keep security lighting to a passive system triggered only by intrusion.

Cumulative effect is the argument that defeats schemes in areas already carrying solar. Map the consented and operational schemes within the study area and assess the combined effect rather than waiting for an objector to do it.

Community response and the pre-application step

Objections to solar farms cluster around three themes: loss of farmland, the appearance of the site from homes and footpaths, and construction traffic through villages. All three are answerable, and all three are answered better before the application than after it.

Run the consultation early enough to change something. A meeting held after the layout is fixed produces the same objections with more anger attached. A meeting held while the array boundary is still movable frequently ends with a hedge in a different place and one fewer objector.

Bring the land survey findings to it. The single most effective thing a developer can say at a village hall meeting is that the site was surveyed, that the results are published in the application, and that the panels sit on the poorer land. It converts an argument about principle into a conversation about detail.

The workstreams that run in parallel

Glint and glare assessment is expected where the site is near an aerodrome, a railway or a road on an alignment that could receive reflection. Aerodrome safeguarding consultation, including defence safeguarding where relevant, runs on its own timetable and should start early.

Biodiversity net gain applies, and a solar farm is unusually well placed to deliver it on site through grassland creation and hedgerow planting. Get the Biodiversity Net Gain Assessment done by a competent person as the Environment Act 2021 regime requires, and design the habitat scheme alongside the array rather than after it.

Grid connection, archaeology, drainage and construction access all have their own lead times, and the construction traffic route through a village is a common reason for objection.

Finally, scale determines the consent route. Above the statutory capacity threshold, solar generating stations in England are nationally significant infrastructure projects consented by development consent order under the Planning Act 2008 rather than by the local planning authority. That threshold has been the subject of change, so confirm the current figure before deciding which route a scheme takes.

Pull the whole case together in a Planning Statement that leads with the land classification finding, sets the temporary and reversible framing early, and deals with landscape and cumulative effect head on. To see which documents a rural energy scheme is likely to need, check a site by postcode.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

What counts as best and most versatile agricultural land?

Grades 1, 2 and 3a in the agricultural land classification system. Grade 3b, 4 and 5 land falls outside the category. The distinction between 3a and 3b is the one that matters for solar development, and it can only be established by a detailed site survey, because the published provisional mapping combines them into a single grade 3.

Does national policy prohibit solar on good farmland?

No. Policy asks that where development of agricultural land at scale is shown to be necessary, poorer quality land is preferred to higher quality land, and that the economic and other benefits of the best and most versatile land are recognised. It is a preference to be weighed, not a prohibition, and successive ministerial statements have addressed the subject, so check the current position.

When can the land survey be done?

Any time the ground can be augered, which rules out frozen and waterlogged conditions. In practice that means avoiding a wet winter, and on heavy clay land the window can be narrow. Commission it at the point the site is optioned rather than when the application is being assembled, because a delayed survey delays everything behind it.

How is reversibility demonstrated?

Through the construction method and the conditions. Piled foundations rather than concrete bases, cable trenches reinstated with soils returned in sequence, tracks built on a geotextile so they can be lifted, a soil management plan governing when machinery may travel, and a decommissioning and restoration scheme secured by condition with a defined end date for the permission.

Can the land still be farmed?

Sheep grazing between and beneath panels is common and is usually offered as part of the scheme, along with wildflower seeding and hedgerow planting. Arable cropping is not compatible with a conventional layout. Where grazing is proposed, describe the stocking arrangement and who will manage it rather than asserting it in a sentence.

Sources and further reading

solar farmagricultural land classificationbmv landrural planninglandscape

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Rural and Agricultural

View all →
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →