Comparisons

Strategic Environmental Assessment or Sustainability Appraisal

7 min readBy PlanScope Editorial Team

A local plan appraisal discharges two duties at once: strategic environmental assessment under the 2004 Regulations and sustainability appraisal under section 19(5). Only one has sharp legal teeth.

The strategic environmental assessment or sustainability appraisal question has a short answer for anyone reading a local plan: there is one document and two legal duties sitting inside it. Strategic environmental assessment is a requirement of the Environmental Assessment of Plans and Programmes Regulations 2004. Sustainability appraisal is a requirement of section 19(5) of the Planning and Compulsory Purchase Act 2004. Local planning authorities satisfy both through a single integrated sustainability appraisal that incorporates the environmental assessment, which is why the document is usually titled "Sustainability Appraisal incorporating Strategic Environmental Assessment".

Knowing which duty a given passage discharges matters when you are drafting a representation, because the environmental assessment duty is the one with the sharper legal teeth.

Two appraisal duties on one plan

The environmental assessment duty is narrow and prescriptive. It applies to plans and programmes likely to have significant environmental effects, it lists the environmental topics that must be covered, it prescribes the content of the environmental report, and it requires consultation with specified bodies. Failure to comply properly is a ground for challenge, and plans have been quashed on it.

The sustainability appraisal duty is broader and less prescriptive. Section 19(5) requires an authority to carry out an appraisal of the sustainability of a local plan and to prepare a report of the findings. It brings in social and economic effects alongside environmental ones, and it is the vehicle through which authorities demonstrate that they have pursued sustainable development objectives.

So one is a compliance exercise with a defined checklist and the other is a judgement exercise with a wide remit. Integrating them is efficient and is what the Planning Practice Guidance expects. It also means a weakness in the environmental assessment part can be buried in a long appraisal document, and finding it is the reader's job.

Neighbourhood plans are different and are dealt with below.

What the environmental assessment duty requires

The 2004 Regulations set out a staged process with a defined output. The stages in practice:

  1. Screening, to determine whether the plan is likely to have environmental effects at that level at all.
  2. Scoping, including consultation with the three statutory consultation bodies.
  3. Preparation of an environmental report describing those likely effects.
  4. Consultation on the plan and the report together.
  5. Taking the report and the consultation responses into account in adopting the plan.
  6. A post-adoption statement explaining how environmental considerations were integrated and how the report and responses were taken into account.
  7. Monitoring of the environmental effects of implementation.

The statutory consultation bodies for England are the Environment Agency, Historic England and Natural England. Scoping consultation with those three is not optional and the responses should be visible in the scoping report.

The environmental topics the report must address include biodiversity, population, human health, fauna, flora, soil, water, air, climatic factors, material assets, cultural heritage including architectural and archaeological heritage, landscape, and the interrelationship between them. A report that omits soil, or treats cultural heritage only as listed buildings, is vulnerable.

What sustainability appraisal adds

The appraisal extends the frame to social and economic effects and to the plan's own objectives. In a typical integrated appraisal this appears as a framework of sustainability objectives, often fifteen to twenty-five of them, against which plan policies and site options are scored.

The additions that matter:

  • Economic effects such as employment land supply, town centre vitality and infrastructure delivery.
  • Social effects such as housing affordability, access to services, deprivation and community cohesion.
  • Health, which overlaps with the environmental duty but is usually developed further here, and at application stage feeds a Health Impact Assessment.
  • Equalities considerations, which connect to the public sector equality duty under the Equality Act 2010 and are sometimes appraised separately in an Equalities Impact Assessment.
  • Cumulative and combined effects across the plan as a whole.

Scoring frameworks are where appraisals attract criticism. A matrix of plus and minus symbols against twenty objectives can look thorough and say very little, particularly where the reasoning behind each score is not recorded. The useful test to apply as a reader: for any score, can you find the sentence that explains it.

Reasonable alternatives and how they are tested

This is the part of the process that generates most legal argument, and it belongs to the environmental assessment duty. The Regulations require the environmental report to identify, describe and evaluate the likely effects of implementing the plan and of reasonable alternatives at that threshold, taking into account the plan's objectives and geographical scope.

Three points recur in practice.

Alternatives must be reasonable, not exhaustive. An authority does not have to appraise every possible option, but it must appraise the ones that are realistically capable of delivering the plan's objectives, and it must say why others were discarded.

Alternatives must be appraised at the same level of detail as the preferred approach. Appraising the chosen strategy thoroughly and the alternatives in two sentences each is the most common substantive failing, and it is the one most likely to succeed on challenge.

The appraisal has to inform the choice rather than justify it after the fact. Where the appraisal of alternatives postdates the decision in the plan-making record, the inference is obvious and inspectors notice.

For site allocations, the alternatives question becomes concrete. If a site was rejected and a comparable one allocated, the appraisal should show the environmental reasons for the difference. That is often the strongest line of attack, or defence, available at examination.

Who is consulted and when

The consultation architecture runs in parallel with the plan-making stages.

Stage Who is consulted What on
Screening The three statutory bodies, where the authority concludes no such effects arise The screening determination
Scoping The three statutory bodies The scope and level of detail of the report
Publication Statutory bodies and the public The draft plan and the environmental report together
Submission and examination Representations go to the inspector Soundness and legal compliance
Post-adoption Public notification The post-adoption statement

Scoping responses have a long tail. A Natural England or Historic England scoping comment that is not addressed turns up again as a representation at publication stage and then as an issue at examination.

The environmental report has to be consulted on at the same time as the plan, not afterwards. Publishing an appraisal three weeks into a six-week consultation is a procedural error that is simple to spot and simple to raise.

Neighbourhood plans and screening

Neighbourhood plans are not subject to the section 19(5) sustainability appraisal duty, because that applies to local plans prepared by the local planning authority. They can still require strategic environmental assessment under the 2004 Regulations where environmental effects at that threshold are likely.

In practice this means a screening exercise for every neighbourhood plan. The qualifying body, with the local planning authority's help, prepares a screening report, consults the three statutory bodies, and publishes a determination. Where the plan only repeats local plan policy and allocates nothing, a determination that no such effects arise is common. Where it allocates sites, or is in or near a designated European site, assessment is likely.

Habitats regulations assessment is a separate and parallel question under the Conservation of Habitats and Species Regulations 2017, and a neighbourhood plan near a protected site can need that even where environmental assessment is screened out. The basic conditions for a neighbourhood plan include compliance with EU-derived environmental obligations as retained in domestic law, so screening out wrongly puts the plan at risk at examination.

Using the documents in representations

For an applicant or an agent, these documents are evidence you can use rather than process you have to tolerate.

Three practical uses. First, the appraisal of a rejected site often records the environmental constraints the authority considered decisive, including designations such as a Local Green Space, and whether those constraints have since changed is a legitimate argument. Second, the scoping responses from statutory bodies tell you what the Environment Agency, Historic England and Natural England think about the area, which is useful well before you consult them on a site. Third, the monitoring commitments in the post-adoption statement are a measurable yardstick for whether the plan is delivering, which feeds into housing land supply arguments.

When objecting to a plan on appraisal grounds, be specific. Name the alternative that was not appraised, or appraised at a lesser level of detail, and point to the paragraph. A general complaint that the appraisal is inadequate will not get traction at examination.

One honest caveat. The law in this area has developed through case law as much as through the Regulations, and the treatment of reasonable alternatives in particular has been refined by the courts. Check the current position before building a challenge on it. The report index shows which assessment documents accompany an application once a plan is adopted.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Are strategic environmental assessment and sustainability appraisal the same thing?

No, though they are usually delivered in one document. Strategic environmental assessment is required by the Environmental Assessment of Plans and Programmes Regulations 2004 and is narrow and prescriptive. Sustainability appraisal is required by section 19(5) of the Planning and Compulsory Purchase Act 2004 and is broader, adding social and economic effects to the environmental ones.

Who are the statutory consultation bodies?

In England, the Environment Agency, Historic England and Natural England. They must be consulted at screening where the authority concludes that no such effects arise, and at scoping on the scope and level of detail of the environmental report. Their scoping responses should be visible in the scoping report and addressed in the appraisal.

What counts as a reasonable alternative?

An option realistically capable of delivering the plan's objectives within its geographical scope. Authorities need not appraise every conceivable option, but they must appraise the realistic ones and record why others were discarded. Crucially, the alternatives must be appraised at the same level of detail as the preferred approach.

Do neighbourhood plans need a sustainability appraisal?

Not under section 19(5), which applies to local plans prepared by the local planning authority. A neighbourhood plan can still require strategic environmental assessment under the 2004 Regulations where environmental effects at that threshold are likely, so a screening exercise and determination is needed for every plan, consulting the three statutory bodies.

What are the most common failings in an appraisal?

Appraising alternatives in far less detail than the preferred strategy, omitting prescribed environmental topics such as soil, treating cultural heritage only as listed buildings, scoring matrices with no recorded reasoning behind each score, and publishing the environmental report partway through the consultation period rather than alongside the plan.

How can an applicant use these documents?

The appraisal of a rejected site records the environmental constraints the authority thought decisive, which is useful if those constraints have changed. Scoping responses tell you what the statutory bodies think about the area before you consult them. Monitoring commitments in the post-adoption statement give a measurable yardstick for plan delivery.

Sources and further reading

strategic environmental assessmentsustainability appraisallocal plansneighbourhood plansplan makingexamination

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons6 min read

Extension of time agreement or renewing a permission

Two things that get confused. Extending the determination period is routine; extending the life of a permission is impossible, and section 73 cannot do it either.

Read article →
Comparisons7 min read

Deed of variation or a section 106A application

Two routes to change a planning obligation, with very different tests. Why section 106A is not a viability hearing, and when a fresh application beats both.

Read article →
Comparisons7 min read

Building notice or full plans application to building control

Two routes to building control approval under the Building Regulations 2010. What each involves, where a building notice is unavailable, and how completion certificates and regularisation work.

Read article →
Comparisons8 min read

Dropped kerb approval or permission for a front hardstanding

The crossover is licensed under the Highways Act 1980. The driveway behind it is permitted development only if it is porous or drains inside your boundary. Most people need both approvals.

Read article →
Comparisons7 min read

Environmental permit or planning permission for a waste use

The Environment Agency permits the operation. The waste planning authority decides whether the use belongs there. Both are needed, and a registered exemption is not a planning permission.

Read article →
Comparisons7 min read

Felling licence or consent for works to a protected tree

A felling licence regulates timber volume under the Forestry Act 1967. Consent under a Tree Preservation Order protects amenity. Woodland can need both, and the exemptions do not carry across.

Read article →