Energy, Sustainability and Carbon

Thermal bridging evidence in a planning energy statement

7 min readBy PlanScope Editorial Team

Default junction values quietly cost you fabric performance. What a planning energy statement should say about psi values, their source and the drawings they sit on.

Linear thermal bridging is one of the few parts of a Part L calculation that can move a planning energy statement from compliant to non-compliant without changing a single wall build-up. If you rely on default junction values, the calculation punishes you. If you rely on calculated psi values, the officer is entitled to ask who calculated them, to which convention, and how the detail will survive the site. Getting thermal bridging evidence into an energy statement properly is a half-day exercise at design stage and an expensive retrofit of the submission if you leave it.

The question an officer is really asking is whether the percentage improvement claimed over the Part L baseline is deliverable. Thermal bridging is where that claim is most often thin.

Why bridging appears at planning stage

An energy statement reports modelled performance against the Building Regulations baseline. For dwellings that means the target emission rate and the target fabric energy efficiency generated from the notional building, with the design figures set against them. For non-domestic buildings it means the BRUKL output from an approved dynamic or SBEM calculation.

Linear thermal transmittance at junctions feeds into both the fabric figure and the emissions figure. The aggregate effect is expressed as a y-value in watts per square metre kelvin, derived from each junction's psi value multiplied by its length and divided by the total exposed envelope area. On a compact block of flats the junction lengths are short relative to the envelope. On a terrace of narrow houses with a lot of openings, the junctions dominate, and a scheme that looks fine on U-values can fail on fabric efficiency.

Authorities that set a percentage reduction target, London boroughs applying the London Plan energy hierarchy among them, are effectively auditing the inputs. The hierarchy asks for lean measures to be exhausted before clean and green ones, so a fabric number propped up by renewables invites a challenge at the first stage.

Default values and the penalty they carry

The calculation methodology lets you take default psi values for each junction type without doing any modelling. They are set conservatively, on the basis that an unmodelled junction could be built badly, and the resulting y-value is markedly worse than a reasonably detailed junction would achieve.

Three consequences follow for a planning submission. The fabric energy efficiency figure drops, so the headroom for meeting a local percentage target disappears. The design team then compensates with photovoltaic area or a larger heat pump, which pushes the scheme up the hierarchy in exactly the direction policy discourages. And the statement ends up describing a building nobody intends to build, because the eventual construction will use published or calculated details anyway.

Defaults have one honest use. At outline stage, where the elevations and junction types are still undecided, a default-based calculation is a defensible worst case, provided the statement says so and the reserved matters strategy explains how the figure improves. Carbon reporting at outline stage has its own conventions, and how carbon is reported in an outline application sets out what an officer can reasonably expect before the detail exists.

Calculated junction values and the evidence behind them

There are two credible routes to better numbers. The first is a published set of construction details with psi values already assigned, used exactly as drawn. The second is bespoke numerical modelling of each junction, carried out to the recognised conventions for calculating linear thermal transmittance and temperature factors, with the geometry, material conductivities and boundary conditions recorded.

Either way the statement should carry a short schedule rather than a sentence. Set out, for each junction type, the psi value used, its source, and the drawing reference where that junction appears:

Junction Psi value source Drawing reference
Ground floor to external wall Numerical model, report reference A-501
Window jamb Published detail, used as drawn A-514
Eaves, insulation at ceiling level Numerical model, report reference A-520
Party wall to external wall Published detail, used as drawn A-530

That table is what distinguishes an energy statement that survives consultation from one that attracts a holding objection. Officers rarely check the arithmetic. They check whether the inputs are traceable to a document and a drawing.

Where a junction is modelled, the output should include the temperature factor as well as the psi value, because a junction can perform acceptably on heat loss while sitting close to the surface condensation threshold. Flagging both in the same schedule saves an argument with building control later.

Where the calculation changes the result

The junctions that move the number are the long ones and the repeated ones. Window and door perimeters on a heavily glazed elevation, the ground floor junction on a shallow-plan dwelling, and balcony or walkway connections on a residential block are the usual culprits.

Balconies deserve particular attention. A continuous reinforced concrete slab projecting through the envelope is a severe bridge, and a structural thermal break assembly changes both the psi value and the structural detail. That is a planning-stage decision because it affects slab edge depth and therefore elevation, not a detail-stage one. The same applies to recessed entrances and to parapet details on flat roofs.

Separating wall junctions in terraces and semi-detached pairs behave differently again, since the party cavity can act as a bypass unless it is fully filled and edge sealed. Treating that junction with a default value on a scheme of narrow terraces is often the single reason a fabric target is missed.

Buildability and the site risk

A calculated psi value is a promise about workmanship. Insulation continuity around a window jamb assumes the cavity closer is installed the right way round, with the insulation line unbroken and the seal continuous.

Design out the dependence where you can. Simple junction geometry, a consistent insulation line and fewer penetrations give a result that tolerates ordinary site tolerances. Where the detail is demanding, say so in the statement and describe how it will be checked, for example junction-specific inspection points in the quality plan. An officer who sees that paragraph is more likely to accept calculated values at face value.

The honest limitation is that nothing in the planning process verifies as-built performance. The statement models an intention. Building control checks the calculation and the certificate at completion, and the gap between the two is a known weakness of the system rather than something an applicant can close.

Conditions securing the detail

Expect one of three forms of condition. A straightforward requirement to construct in accordance with the submitted energy statement, which is weak but common. A requirement to submit junction details and the supporting psi value calculations before superstructure works, which is the form that actually bites. Or a requirement to submit as-built calculations and the completion certificate, which addresses verification rather than design.

Where the authority applies a percentage improvement target, a condition tying the development to the modelled reduction is normal, and the wording matters. A condition drafted against a numbered revision of the energy statement locks in the inputs, so check the revision number on the certificate before the decision notice is issued. Baselines cause more confusion in this area than the measures do, and why the notional building confuses officers explains the trap before you negotiate wording.

Presenting the data

Keep the thermal bridging material to two pages inside the Energy Statement and put the modelling outputs in an appendix. The two pages should state the route taken, the schedule of junctions with sources and drawing references, the resulting y-value, and the sensitivity of the headline reduction to that y-value.

Pair it with the fabric section rather than the renewables section, because the two are read together. The U-values an officer looks for and the junction treatment behind them are a single argument, and the fabric figures officers check first is where that argument starts. Where overheating is also in play, the glazing decisions that help the bridging case can work against the Overheating Risk Assessment, so model both before fixing the elevations.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Compliance modelling itself needs an accredited assessor, and this article is general guidance rather than advice on a specific scheme, so check requirements with your local planning authority or a qualified professional. Enter your postcode on PlanScope to see which reports your site is likely to need.

Frequently asked questions

What is a y-value and how is it derived?

The y-value expresses the aggregate effect of linear thermal bridging across a building, in watts per square metre kelvin. Each junction's psi value is multiplied by its length, the results are added, and the total is divided by the exposed envelope area. It feeds both the fabric energy efficiency figure and the emissions figure in a Part L calculation.

Can I use default psi values in an energy statement?

Yes, and the calculation will accept them, but they are set conservatively and worsen the resulting y-value. That reduces headroom against a fabric target and pushes the design towards renewables to compensate. Defaults are defensible at outline stage as a stated worst case, provided the statement explains how the figure improves at reserved matters.

Who should calculate bespoke junction values?

Numerical modelling of junctions should be done by someone competent in the recognised conventions for linear thermal transmittance and temperature factors, and the compliance calculation itself needs an accredited assessor. Record the geometry, conductivities and boundary conditions used, because an officer or a reviewer may ask for the model output rather than the headline number.

Which junctions usually decide the outcome?

Long and repeated junctions dominate. Window and door perimeters on heavily glazed elevations, ground floor to wall junctions on shallow-plan dwellings, balcony and walkway connections on residential blocks, and separating wall junctions on narrow terraces. Projecting concrete slabs are the most severe, and resolving them affects slab edge depth and therefore the elevation.

How is the detail secured after permission?

Usually by condition. The forms that bite require junction details and supporting psi value calculations to be submitted before superstructure works, or as-built calculations at completion. Check that any condition refers to the correct numbered revision of the energy statement, since the inputs are locked to that document once the decision notice is issued.

Sources and further reading

energy statementpart lthermal bridgingfabric performancearchitects

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon7 min read

Heat network pipe routes and the highway consents needed

Where distribution pipework leaves your site, three consents are needed and none of them comes from the planning authority. What to evidence at application stage.

Read article →
Energy, Sustainability and Carbon6 min read

Overshading a neighbour's solar array as a consideration

There is no civil right to solar access for roof panels, so the planning objection is the only route. This covers materiality, how to model the shading effect, the design changes that resolve it and what a decision usually turns on.

Read article →
Energy, Sustainability and Carbon6 min read

Metering strategy for communal heating and the condition

The planning condition secures the approved energy strategy while the 2014 heat metering Regulations bind the eventual heat supplier. This covers riser and plant consequences, enforceable condition wording and the completion evidence pack.

Read article →
Energy, Sustainability and Carbon6 min read

Demolition carbon, site waste and the pre-redevelopment audit

The quantities in a pre-redevelopment audit drive the reuse percentages you commit to and the pre-construction demolition carbon figure. Record them while the building is still standing, and keep the evidence trail for the condition.

Read article →
Energy, Sustainability and Carbon7 min read

Energy and overheating evidence for student and co-living

Purpose-built student accommodation and co-living are sui generis uses assessed as rooms for residential purposes, which changes the Part L route, the TM59 occupancy profile and the corridor criterion that usually decides the scheme.

Read article →
Energy, Sustainability and Carbon7 min read

Why Class MA conversions struggle with overheating

Office to residential conversions under Class MA inherit deep floorplates, fixed glazing and single-aspect layouts. The noise strategy then closes the windows that would purge the heat.

Read article →