Tree surveys in leaf and out of leaf

6 min readBy PlanScope Editorial Team

Structural assessment is year round, crown condition is not. What a winter tree survey can and cannot tell you, and how to sequence one before a spring submission.

Tree survey timing is less restrictive than ecology timing, which is why it gets left too late. A BS 5837:2012 survey can be done in any month. What changes with the season is the confidence attached to parts of the assessment, and whether the arboriculturist has to come back.

The short version for programming a scheme. Survey between late autumn and early spring for structural detail and quick access, survey in full leaf for crown condition, and allow for a second visit if the trees are important to the layout and the first visit fell in the wrong season.

What a BS 5837 survey actually records

The standard sets out the information a survey should capture for each tree or group within influencing distance of the proposals. Reference number, species, height, stem diameter measured at 1.5 m, branch spread at four points, crown clearance, age class, physiological and structural condition, preliminary management recommendations, and an estimated remaining contribution expressed in bands of years.

From that the arboriculturist assigns a category. U for trees that should be removed regardless of development, and A, B or C in descending order of quality, each with subcategories covering arboricultural, landscape and cultural or conservation value.

The survey also produces the root protection area for each retained tree, calculated as a radius of 12 times the stem diameter and capped at 707 m2. That figure drives the layout, the foundation design and the construction exclusion zone, which is why the survey needs to exist before the site plan is fixed rather than after.

The output is a schedule, a tree constraints plan and, once a layout exists, an Arboricultural Impact Assessment with a method statement and protection plan.

Work that can be done in any month

Most of the survey is season-neutral. Measuring stem diameter, recording height and spread, identifying deciduous species from bark and bud, locating trees by survey or GNSS, assessing root protection areas and mapping constraints all happen as readily in January as in July.

Structural inspection is often better in winter. With the crown bare the arboriculturist can see included bark unions, historic failures, deadwood, cavities, bark loss and the true branch architecture. Ivy is the exception. A heavily ivy-clad stem hides defects in any season, and the honest response is a recommendation to clear the ivy and re-inspect.

Checks that need the tree in leaf

Crown condition is the one assessment that depends on foliage. Leaf density, leaf size, dieback in the outer crown, discolouration and early autumn colour are the indicators of stress and root damage, and none of them can be judged from a bare tree.

Several fungal indicators are also seasonal. Some brackets persist year-round, but many fruiting bodies appear only in late summer and autumn, so a February survey can miss decay that an October visit would find.

The practical consequence is a caveat in the report rather than a failed survey. A winter survey will say that condition has been assessed on structural grounds and that crown condition should be confirmed in leaf. An officer reading that caveat on a scheme where a category A oak sits beside the proposed dwelling will often ask for the confirmation before determination.

Bat potential noted during a tree inspection

An arboriculturist inspecting a tree records features that could support roosting bats. Woodpecker holes, frost cracks, lifted bark, rot cavities, dense ivy. That is a preliminary note, not a bat survey, and it does not satisfy the requirement for ecological assessment.

Winter is the better season for spotting those features from the ground, because the crown is visible. Assessing whether they are used is a separate exercise under the Bat Conservation Trust guidelines, carried out by a licensed ecologist, usually beginning with a Preliminary Ecological Appraisal and followed by aerial inspection or emergence surveys in the appropriate season. All bat species are protected under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017, so tree work that might affect a roost needs that separate assessment and, where a roost is confirmed, a licence.

Flag potential roost features early. Where a tree survey in November identifies three features on trees due for removal, the emergence survey window may not open until May, and the programme consequence is immediate. A Protected Species Survey has to be commissioned by a suitably licensed ecologist, and the draft documents a planning consultant prepares cannot substitute for it.

How long a survey stays current

There is no statutory validity period. Authorities commonly expect a survey carried out within the previous 12 months, and many will accept up to 24 months where the trees are stable and nothing on site has changed.

Four things shorten that. A storm between survey and submission, tree work carried out in the interim, a change to the layout that brings new trees within influencing distance, and a long gap between outline permission and reserved matters. An update visit is far quicker than a repeat survey, and a dated addendum letter usually satisfies the case officer.

Record the survey date prominently in the report and on the constraints plan. Officers check it.

Programming a spring submission

Working backwards from a target submission in April:

  1. Commission the survey in September or October, while trees are still in leaf and fungal fruiting bodies are visible
  2. Issue the tree constraints plan to the design team in November, before the layout is fixed
  3. Resolve layout conflicts through December, adjusting building positions rather than reducing root protection areas
  4. Prepare the impact assessment, method statement and tree protection plan in January and February against the settled layout
  5. Commission any ecology work identified by the tree survey as soon as the features are recorded, not after the design is finished
  6. Check in March whether anything on site has changed, and issue a short addendum if it has

That sequence also avoids the most expensive mistake on small sites, which is designing a layout first and then asking an arboriculturist to justify it. Root protection areas are not negotiable in the way that a parking space is.

Conditions that require checks before work starts

Permissions affecting trees routinely carry pre-commencement conditions. Tree protection fencing installed and inspected before any equipment arrives, an arboricultural method statement approved in writing, supervision by an arboriculturist at stated points, and a pre-commencement check for nesting birds where clearance falls in the breeding season between March and August.

Build those checks into the programme rather than treating them as paperwork. The fencing inspection in particular has to happen before groundworks, and a contractor who has already brought a tracked excavator onto the root protection area has created a breach that cannot be undone. Trees protected by a Tree Preservation Order or standing in a conservation area carry separate consent requirements, and works without consent can attract prosecution.

PlanScope drafts arboricultural and ecological supporting documents structured to UK planning policy, with site facts flagged rather than assumed. Survey work and the professional judgement behind it stay with your arboriculturist and ecologist. Browse all 66 report types to see what a tree-constrained site usually needs.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a tree survey be done in winter?

Yes. Stem diameter, height, spread, species identification, root protection areas and structural assessment are all done readily with the crown bare, and winter often gives a clearer view of unions, cavities and deadwood. The report will caveat that crown condition has not been assessed in leaf, and an officer may ask for that confirmation.

How long is a BS 5837 survey valid?

There is no statutory period. Most authorities expect a survey from within the previous 12 months, and many accept up to 24 months where nothing has changed. A storm, interim tree work, a layout change bringing new trees into play, or a long gap before reserved matters all call for an update visit and a dated addendum.

How is the root protection area calculated?

Under BS 5837:2012 the root protection area is derived from a radius of 12 times the stem diameter measured at 1.5 m, with the resulting area capped at 707 square metres. It defines the construction exclusion zone and constrains foundations, service runs and site compounds, so it needs to be plotted before the layout is settled.

Does a tree survey cover bats?

No. An arboriculturist may record features with potential to support roosting bats, such as woodpecker holes, frost cracks or lifted bark, but that is a preliminary note. Assessing whether those features are used requires a licensed ecologist working to the relevant guidelines, with aerial inspection or emergence surveys in season.

When should I commission a survey for a spring application?

Commission in September or October, while the trees are still in leaf and fungal fruiting bodies are visible. That gives the design team a constraints plan by November, time to resolve layout conflicts over the winter, and a settled layout for the impact assessment and method statement in the new year.

Sources and further reading

tree surveybs 5837arboriculturesurvey seasonroot protection areaprogramme

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Seasonal Calendar

View all →
Seasonal Calendar7 min read

Archaeological evaluation and winter ground conditions

Saturated ground flattens the soil differences evaluation depends on. Here is what still works in winter, what does not, and how to programme around it.

Read article →
Seasonal Calendar7 min read

Air quality baseline monitoring and the twelve month year

Annual mean objectives need annual data. Here is how bias adjustment, annualisation and the council's published monitoring fit into a realistic programme.

Read article →
Seasonal Calendar7 min read

The annual five year housing land supply position

A published five year housing land supply is a snapshot at a base date, usually 1 April. Testing it means working site by site through the schedule rather than arguing about optimism in general.

Read article →
Seasonal Calendar7 min read

Housing Delivery Test publication and what it triggers

The Housing Delivery Test measurement triggers an action plan below 95 per cent, a 20 per cent supply buffer below 85 per cent and the presumption in favour of sustainable development below 75 per cent.

Read article →
Seasonal Calendar8 min read

Timing a submission around the planning committee cycle

The date that matters is the agenda publication deadline, and the officer report deadline before that. Work backwards from the committee meeting you want and the submission date falls out of it.

Read article →
Seasonal Calendar8 min read

CIL indexation and the figure that applies to your scheme

The rate in the charging schedule is not the rate you pay. Indexation runs from the year relevant to the permission, and the commencement notice is the deadline that costs the most to miss.

Read article →