Urban greening factor and canopy cover targets
The greening factor is a weighted average of surface cover across a site. How to run the calculation, what the weightings reward and where the measure stops being useful.
The urban greening factor is a scoring method that measures how much of a site is covered by vegetation, weighted by the quality of that cover. In London it operates through London Plan policy G5, which sets target scores of 0.4 for predominantly residential development and 0.3 for predominantly commercial development, and the urban greening factor planning requirement now appears in a growing number of local plans outside London too. It is a quantity measure. That is both its usefulness and its limit.
What the factor measures
Each surface type on the site is given a factor between 0 and 1. Semi-natural vegetation retained or established on the ground scores at the top. Sealed surfaces score zero. Everything else sits in between, with deeper substrates, more established planting and greater soil volume scoring higher.
The score is the weighted average across the site. Multiply each area by its factor, add the results, divide by the total site area. A site of 2,000 m² needs the sum of area multiplied by factor to reach 800 to hit a 0.4 target.
That arithmetic drives the design conversation, because it tells you immediately that a small area of high-scoring cover cannot compensate for a large sealed yard. Covering a quarter of a site with rain gardens does less for the score than people expect, and sealing an access road costs more than they expect.
Working the calculation
Take the factors from the adopted policy or supplementary document rather than from memory, because the tables differ between the London Plan and the local plans that have adapted it.
An illustrative worked example, using assumed factors that you should replace with the adopted values for your area:
| Surface | Area | Assumed factor | Contribution |
|---|---|---|---|
| Retained trees and understorey | 200 m² | 1.0 | 200 |
| Intensive roof, substrate over 150 mm | 300 m² | 0.8 | 240 |
| Amenity grass | 250 m² | 0.4 | 100 |
| Permeable paving | 400 m² | 0.1 | 40 |
| Sealed surfaces and building footprint | 850 m² | 0.0 | 0 |
| Total | 2,000 m² | 580 |
That gives 580 divided by 2,000, or 0.29, well short of a 0.4 residential target. Moving 200 m² of permeable paving to deeper-substrate roof planting, and upgrading the amenity grass to species-rich meadow, closes most of the gap without reducing the development.
Submit the calculation as a table in exactly this form, with areas cross-referenced to a colour-coded plan. A score asserted without the arithmetic is the most common reason the condition gets drafted tightly.
Surface types and the weightings behind them
The weightings reward three things. Soil depth, because it determines what can grow and how long it survives. Connectivity to the ground, because planting over structure has a shorter life and more constrained root volume. And habitat quality, because species-rich planting supports more than mown grass.
Hence the hierarchy. Retained ground-level vegetation beats new planting. Deep substrate beats shallow. Species-rich beats amenity grass. Green walls score modestly, because their maintenance dependency is high and their failure rate is real.
Permeable paving is where most arguments happen. It scores low because it provides a drainage benefit rather than a greening one, and applicants who have used it to satisfy the drainage strategy often assume it counts twice. It does not. A Drainage Strategy and a greening score measure different things, and the overlap is smaller than it looks.
Tree canopy and how it is counted
Canopy is normally measured as the projected canopy area at a stated point in the tree's life rather than at planting, which is why the specification of the tree and its pit matters as much as the number of trees.
Two conditions usually attach to counting canopy at maturity. The soil volume must be adequate for the species, commonly expressed as a proportion of the projected canopy area multiplied by a rooting depth, and the pits should be connected rather than isolated. The second requirement is the one that fails on podium schemes, where individual planters give a tree no room to develop.
A tree survey for the existing trees and a planting schedule for the new ones should agree with the greening calculation. Where a retained tree is credited at its current canopy, check that the construction will not reduce the root protection area to the point where that canopy cannot be sustained.
Canopy cover targets in local plans work differently from the greening factor. A target expressed as a percentage of site area under canopy is a separate test, and a scheme can pass one and fail the other.
Reconciling the score with parking and drainage
Three tensions come up on nearly every site.
- Surface parking. Sealed bays score zero and permeable bays score little, so the score pushes parking underground or off site, which has a cost the appraisal has to carry.
- Drainage. Attenuation basins planted as wet meadow score well, while below-ground tanks score nothing, so the drainage design and the greening score should be developed together rather than sequentially.
- Fire service access. Hard standing for appliance access is non-negotiable and scores zero, and it is often the single largest sealed area on a constrained urban site.
The resolution is usually vertical. Deep-substrate roof planting over the parts of the building that can carry the load, with the structural implications picked up early, is the only way many urban sites reach a 0.4 score. That is a structural decision, not a landscape one, and it has to be taken before the frame is designed.
Evidence to submit and the conditions that follow
A submission that holds up contains the calculation table, a plan colour-coded by surface type with areas annotated, a roof plan showing substrate depths, a planting schedule with species and sizes, soil volume calculations for trees, and a maintenance and management plan. Set it out in the Landscape Strategy or, where the scheme is larger, in a Green Infrastructure Plan.
Expect conditions requiring the approved substrate depths to be built as drawn, the planting to be carried out in the first planting season after occupation, and replacement of failures over a defined period. On larger schemes, monitoring reports for several years after completion are common.
The practical risk is value engineering. Substrate depth is invisible once built and is the first thing to be reduced on site, which turns a 0.4 score into something lower and puts the development in breach. Photographic evidence of the build-up at installation is the least costly insurance available.
Where the measure falls short
Say plainly what the greening factor does not do. It does not measure biodiversity value, so a site can score well with amenity grass and ornamental shrubs while delivering little for wildlife. It does not measure habitat connectivity. And it does not substitute for the statutory biodiversity metric, which is a different calculation with its own rules, dealt with in a Biodiversity Net Gain Assessment.
Nor does it measure survival. A score delivered on paper and lost to a failed green wall three summers later has achieved nothing, which is why the maintenance plan deserves more attention than it usually gets.
Used well, the factor is a useful early design discipline that forces greening into the structural grid rather than onto the leftover space. Used badly, it is a spreadsheet exercise. Browse all 66 PlanScope report types to see which landscape and ecology documents your scheme is likely to need.
For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
What urban greening factor score is required?
London Plan policy G5 sets target scores of 0.4 for predominantly residential development and 0.3 for predominantly commercial development. Local plans outside London have adopted similar approaches with their own targets and factor tables, so take both the target and the factors from the adopted policy that applies to your site.
How is the score calculated?
Multiply the area of each surface type by its factor, add the results and divide by the total site area. Factors run from 1.0 for semi-natural vegetation down to zero for sealed surfaces. Submit the arithmetic as a table cross-referenced to a plan colour-coded by surface type, with areas annotated.
Does permeable paving count towards the score?
It counts, but at a low factor, because it delivers a drainage benefit rather than a greening one. Applicants who have used permeable paving to satisfy the drainage strategy often assume it does double duty, and it does not. Plan the drainage design and the greening score together instead.
How is tree canopy measured for the score?
Normally as projected canopy area at a stated point in the tree's life rather than at planting, which makes the soil volume and the pit design as important as the number of trees. Connected pits with adequate volume for the species are usually required, and isolated planters on podium schemes frequently fail that test.
Does the greening factor replace biodiversity net gain?
No. The greening factor measures the quantity and type of green cover, while the statutory biodiversity metric measures habitat units and is calculated under separate rules. A scheme can score well on greening with amenity grass and ornamental shrubs while delivering little measurable biodiversity gain.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.