Wales: minerals and aggregates policy in applications

7 min readBy PlanScope Editorial Team

Welsh minerals applications run on MTAN 1, the regional technical statements and the well-being duty. What to assess and what the submission has to contain.

This article is about Wales. Minerals policy in Wales runs on a different set of documents from England, and the one that governs most aggregates applications is Minerals Technical Advice Note 1, which sits under Planning Policy Wales. If you are promoting a quarry extension, a new sand and gravel working, or a development that would build over a safeguarded resource, that document and the regional technical statement for your area are where the answer starts.

The Welsh policy framework for minerals

The development plan in Wales has two statutory parts: Future Wales, the national plan, and the local development plan, with strategic development plans emerging in some regions. Planning Policy Wales sets national policy, and the minerals technical advice notes give the detailed guidance, with MTAN 1 covering aggregates and MTAN 2 covering coal.

Overlaying all of it is the sustainable development duty under the Well-being of Future Generations (Wales) Act 2015, which applies to the planning authority as a public body and shapes how applications are framed in Wales. A minerals application that reads as a purely technical submission, with no engagement with the well-being goals, misses something Welsh officers expect to see addressed.

Supply is managed through the regional technical statements prepared by the aggregates working parties for north and south Wales. These apportion need between authorities and set out the landbank position, and MTAN 1 expects a landbank of at least ten years for crushed rock and seven years for sand and gravel. Check the current regional technical statement and its latest review before building a need case, because the apportionment for your authority is the figure the case rests on.

Safeguarding areas and prior extraction

Local development plans in Wales identify mineral safeguarding areas covering known resources. The purpose is to stop other development sterilising a resource that may be needed later.

Two consequences follow for a developer who is not in the minerals business at all.

A housing or commercial application inside a safeguarding area attracts a consultation with the minerals authority and, on larger sites, a request for a minerals assessment setting out whether the resource is of economic value and whether it could be extracted first.

Prior extraction may be required or offered. Where the resource is workable, the authority may expect it to be won before the site is built over, which changes the programme and the ground conditions, and brings a separate minerals permission into the critical path.

Neither of these is a reason to avoid a site. They are a reason to check the plan's safeguarding maps before you put land under option.

Buffer zones around working sites

MTAN 1 applies buffer zones between mineral workings and sensitive development, and they work in both directions. A new quarry needs to respect the distance to existing homes, and a housing proposal near an existing or permitted working has to respect the distance to the quarry.

The guidance sets separate distances for hard rock sites where blasting takes place and for sand and gravel workings, with the larger distance applying to blasting sites. Confirm the figures in the current version of MTAN 1 rather than relying on a number quoted second hand, since the application of the zones is also affected by topography, screening and the detail of the operation.

The practical use of the buffer is defensive. Where an objector argues that a scheme is too close to a working, the buffer zone gives you an objective benchmark to measure against, and a scheme comfortably outside it is in a much stronger position than one arguing the point on mitigation alone.

Restoration, aftercare and financial guarantees

Restoration is assessed as part of the application, not left to the end of the operation, and in Wales a restoration scheme that delivers a net benefit for biodiversity and public access tends to carry real weight.

Element What the application should show
Phasing Progressive restoration alongside working, not deferred to the end
Final landform Levels, slopes, water bodies and their stability
Afteruse Agriculture, forestry, nature conservation, recreation or a mix
Aftercare The management regime and its duration, secured by condition
Soils Stripping, storage, handling and replacement depths
Financial provision Guarantee or bond where the authority requires one

Aftercare conditions can secure management for a period after restoration, and authorities in Wales commonly look for a longer commitment through a planning obligation where the afteruse is nature conservation. Financial guarantees are not available in every case, so establish early whether the authority expects one and on what basis, because it is a balance sheet item.

The landscape case for the final landform usually needs its own assessment, and a Landscape and Visual Impact Assessment prepared to the recognised methodology is the document that carries it.

Noise, dust and blasting assessment

The environmental assessment work on a minerals application is substantial and it is where most of the budget goes.

MTAN 1 sets the noise framework, with a daytime limit expressed as a margin above background subject to an absolute cap, a lower night-time limit, and a higher temporary limit for operations such as soil stripping and bund formation over a limited number of weeks. Baseline monitoring has to be done properly, at the right receptors and in representative conditions, and a Noise Impact Assessment for a quarry is a materially bigger exercise than one for a commercial unit.

Dust is assessed on a source by source basis, covering haul roads, processing plant, stockpiles, blasting and soil handling, with mitigation by water suppression, surfacing, enclosure and screening. Where there are nearby homes or sensitive habitats, an Air Quality Assessment runs alongside the dust work.

Blasting is assessed for air overpressure and ground vibration, with peak particle velocity limits set in MTAN 1 as a figure to be met in the great majority of blasts together with an absolute maximum. Trial blasts and a monitoring regime secured by condition are the normal arrangement.

Most aggregates proposals of any scale will be environmental impact assessment development under the Welsh EIA Regulations, either as Schedule 1 development or following screening under Schedule 2. The Environmental Statement must be prepared by competent experts, which is a legal requirement rather than good practice, so an Environmental Impact Assessment draft is a starting point for those experts and never a substitute for them.

Review of old mineral permissions

Many Welsh quarries operate under permissions granted decades ago, with conditions that would not be imposed today. The Environment Act 1995 introduced the review machinery, under which old permissions are reviewed and updated conditions imposed, with periodic reviews after that.

Three points matter commercially.

A review can impose modern conditions on noise, hours, restoration and aftercare without compensation in most cases, provided the conditions do not restrict working rights so severely as to amount to a taking of the permission.

An operator who fails to submit a scheme of conditions when required can find the permission suspended.

A purchaser of a quarry business needs to know where each site sits in the review cycle, because an imminent review changes the value.

Check the status of each permission on the authority's register rather than relying on the operator's description of it.

Evidence to submit

For an aggregates application in Wales, the core submission is:

  1. A planning statement addressing Future Wales, the local development plan, Planning Policy Wales, MTAN 1 and the well-being duty.
  2. The need case built on the current regional technical statement apportionment and landbank position.
  3. An Environmental Statement where the proposal is EIA development, prepared by competent experts.
  4. Noise, dust, blasting, hydrology and hydrogeology assessments, with baseline monitoring data.
  5. A landscape and visual assessment covering both operation and restoration.
  6. A restoration, aftercare and afteruse scheme with phasing drawings.
  7. A transport assessment covering haul routes and any highway improvements.

Natural Resources Wales regulates the environmental permit, water abstraction and any discharge, and those applications run in parallel rather than in sequence. Browse the 66 PlanScope report types to see which of these can be drafted and where professional input is legally required. PlanScope's drafting is grounded in English national policy, so a Welsh submission needs a reviewer to check it against Planning Policy Wales and the relevant technical advice notes.

This is general guidance, not legal advice. Check the position with the planning authority, Natural Resources Wales or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is MTAN 1 and does it still apply?

Minerals Technical Advice Note 1 is the Welsh Government's guidance on aggregates, sitting beneath Planning Policy Wales. It covers landbanks, buffer zones, environmental assessment, restoration and aftercare, and it remains the document Welsh authorities apply to aggregates proposals. Check the current version on the Welsh Government site, because figures quoted second hand are often out of date.

How are mineral landbanks handled in Wales?

Supply is apportioned through regional technical statements prepared by the aggregates working parties for north and south Wales, and MTAN 1 expects a landbank of at least ten years for crushed rock and seven years for sand and gravel. Your need case should be built on the current apportionment for the authority rather than on a national figure.

What happens if my housing site sits in a mineral safeguarding area?

The application will be consulted on with the minerals authority, and on a larger site you may be asked for an assessment of whether the resource has economic value and could be extracted first. Prior extraction can be required or offered, which brings a separate minerals permission into the programme and changes the ground conditions. Check the plan's safeguarding maps before taking an option.

Are buffer zones a hard constraint?

They are guidance rather than an absolute prohibition, and their application depends on topography, screening and the detail of the operation. In practice they work in both directions, so they also give a housing proposal near an existing quarry an objective benchmark to measure against. A scheme comfortably outside the zone is in a much stronger position than one arguing mitigation.

Can old quarry permissions have new conditions imposed?

Yes. The review machinery introduced by the Environment Act 1995 allows old mineral permissions to be reviewed and modern conditions imposed on matters such as noise, hours and restoration, usually without compensation unless the restriction would effectively take away the working rights. Failing to submit a scheme when required can suspend the permission.

Sources and further reading

walesmineralsaggregatesmtan 1restorationenvironmental impact assessment

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: development in areas of natural beauty

Development in a Northern Ireland area of outstanding natural beauty is judged on siting and integration as much as principle. The landscape test is where most schemes fail.

Read article →
Wales, Scotland and Northern Ireland6 min read

Scotland: the infrastructure levy power and its status

Scotland has an enabling power for an infrastructure levy and no regulations to bring it into effect. Section 75 obligations still carry developer contributions.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: the sustainable transport hierarchy in applications

In Wales the sustainable transport hierarchy is national policy applying to site choice and layout, not just to the transport chapter. Active travel duties and maximum parking standards follow from it.

Read article →
Wales, Scotland and Northern Ireland7 min read

Scotland: open space and play provision policy

Scotland puts open space strategies and play sufficiency assessments on a statutory footing. What they mean for layout, standards and section 75 obligations.

Read article →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: the Department's call-in power explained

A call-in takes an application out of a council's hands and removes the appeal to the Planning Appeals Commission. The criteria, the process and the programme risk.

Read article →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: enforcement powers and immunity periods

Northern Ireland uses a single five year immunity period and sends enforcement appeals to the Planning Appeals Commission. What each notice does and how to respond.

Read article →