What a Healthy Streets assessment has to cover
Policy T2 of the London Plan asks applicants to show how a scheme supports the ten Healthy Streets indicators. Done early, the assessment changes the layout rather than justifying it.
A Healthy Streets assessment is an indicator-based appraisal of the street environment in and around a development, submitted with the transport evidence on larger London applications. It is not a longer walking and cycling audit, and it is not a chapter of the transport assessment with a different title. Policy T2 of the London Plan 2021 asks applicants to show how a scheme will deliver improvements supporting the ten Healthy Streets indicators, and the assessment is the document that answers that in a form the Greater London Authority and Transport for London can mark.
Done late, it reads as a justification. Done early, it changes the layout.
What it is, and which schemes need it
The Healthy Streets approach sets out ten indicators describing what makes a street somewhere people will choose to walk, cycle and spend time. Policy T1 of the London Plan carries the strategic target for a large majority of trips in London to be made by walking, cycling and public transport, and Policy T2 is how that target reaches an individual application.
In practice the assessment is expected on applications referable to the Mayor, on schemes in opportunity areas and town centres, and wherever a borough's own policy asks for it. Transport for London's transport assessment guidance sets out what it wants to see, alongside an active travel zone assessment covering the routes between the site and the places people will walk and cycle to. Where a site sits in an allocation, the expectations are often set there as well, as we cover in what a London allocation changes.
Ask at pre-application which documents the borough and Transport for London want, and in what form. The answer varies more than it should.
The ten indicators and the evidence for each
| Indicator | Evidence that answers it |
|---|---|
| Pedestrians from all walks of life | Footway widths, step-free routes, dropped kerbs, tactile paving, desire lines served |
| Easy to cross | Crossing locations against desire lines, waiting times, informal crossing provision, carriageway widths |
| Shade and shelter | Tree canopy cover, planting proposals, building overhangs, orientation |
| Places to stop and rest | Seating counts and spacing, with distances between rest points |
| Not too noisy | Cross-reference to the noise assessment for the street environment |
| People choose to walk, cycle and use public transport | Public transport accessibility, cycle parking against the standards, mode share targets |
| People feel safe | Collision records, overlooking and active frontage, lighting levels, severance |
| Things to see and do | Active frontage length as a proportion of the street edge, ground floor uses |
| People feel relaxed | Pedestrian comfort levels, footway crowding, clutter audit |
| Clean air | Cross-reference to the air quality assessment and the exposure of the walking routes |
Two of these are usually weak in submitted assessments. Shade and shelter gets a sentence about street trees with no canopy figure and no acknowledgement that a newly planted tree provides nothing for fifteen years. And places to stop and rest gets a statement that benches will be provided, with no plan showing where or how far apart.
Give each indicator a measured baseline, a measured proposed condition, and a drawing reference. That structure alone puts the document ahead of most.
Drawing the study area
The site boundary is not the study area. The assessment covers the streets within the site, the streets immediately adjoining it, and the routes from the site to the places people will actually go: the nearest stations and bus stops, the local centre, the schools and the open space.
A walking catchment of around ten minutes is the usual starting point, extended along the routes to any station or interchange beyond it. Cycling catchments are larger again. Agree the extent with Transport for London before the audit work starts, because redoing a street audit over a wider area is expensive and slow.
Be honest about the parts of the route you cannot change. An assessment that scores a junction poorly and then explains what the scheme contributes towards improving it is more credible than one that quietly stops at the red line.
Baseline audit and proposed condition
The work is fieldwork before it is anything else. Walk the routes, at different times of day, and record what is there rather than what the map shows.
The baseline should include footway widths at pinch points, pedestrian comfort levels where crowding is an issue, crossing provision measured against desire lines, seating and shelter, lighting, severance caused by traffic, surface condition, clutter, and the proportion of frontage that is active.
The proposed condition then shows what the scheme changes, separating three categories: what is delivered inside the site, what is delivered on the adjoining highway through works under section 278, and what is contributed towards off-site improvements the scheme does not itself build. Marking those three differently is important, because a document that credits the scheme with improvements it is only funding a share of will be marked down.
How it sits alongside the transport assessment
The Transport Assessment deals with trip generation, capacity, access and servicing. The Healthy Streets work deals with the quality of the environment those trips take place in. They share inputs and answer different questions.
Keep them consistent on three things: the mode share assumptions, the cycle parking provision against the London Plan standards, and the car parking figure. A Healthy Streets assessment claiming a walkable scheme sitting next to a transport assessment with generous parking is a contradiction an officer will raise.
The Travel Plan should pick up the measures that need managing over time: cycle parking maintenance, wayfinding, car club provision and the monitoring regime. Where a Health Impact Assessment is also required, the two documents overlap on physical activity and air quality, and they should cite each other rather than repeat each other.
Mitigation and the street works contribution
Mitigation on a Healthy Streets assessment is physical and mostly off the balance sheet of the building.
The measures that score well are new or improved crossings on desire lines, footway widening at pinch points, decluttering, continuous footways across side road junctions, tree planting with adequate soil volume, seating at measured intervals, cycle parking at the entrances people use, and lighting improvements on the routes to transport. A Green Infrastructure Plan can carry the planting and canopy elements, which also serve the shade indicator over time.
Secure them properly. Works within the highway go through a section 278 agreement with the highway authority, which has its own design approval and timetable, and off-site contributions go through section 106. Neither happens because a report recommended it.
Reporting format and drawings
Structure the report indicator by indicator. For each one: what the policy expects, the measured baseline, the proposed condition, the change, and where in the drawings it is shown.
Four drawings do most of the work. A study area plan with the routes and destinations. A baseline constraints plan marking pinch points, crossings, severance and clutter. A proposals plan showing the changes, coded by delivery mechanism. And a desire line overlay, which is the drawing that most often changes a layout, because it shows where people will cut across whatever you have designed.
Avoid a scoring table with no narrative. The numbers matter less than the explanation of what the scheme does and does not fix.
An illustrative case: a 320 home scheme beside a four-lane road, with the main pedestrian route to the station crossing at a signalised junction 180 metres from the natural desire line. The first assessment scored the junction and moved on. The revised scheme funded a new signalised crossing on the desire line through section 278, moved the main entrance to face it, and relocated the ground floor commercial unit to give active frontage on that route. The building did not change. The relationship between the building and the street did, which is the point of the exercise.
Enter your postcode on PlanScope to see which transport and street environment reports a London scheme is likely to need.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Which applications need a Healthy Streets assessment?
In practice, applications referable to the Mayor, schemes in opportunity areas and town centres, and anywhere a borough's own policy requires it. Transport for London's transport assessment guidance sets out the expected content, usually alongside an active travel zone assessment of the routes between the site and local destinations. Confirm the scope at pre-application.
What are the ten Healthy Streets indicators?
They cover pedestrians from all walks of life, easy to cross, shade and shelter, places to stop and rest, not too noisy, people choosing to walk, cycle and use public transport, people feeling safe, things to see and do, people feeling relaxed, and clean air. Each needs a measured baseline, a measured proposed condition and a drawing reference.
How large should the study area be?
Beyond the red line. Cover the streets in and adjoining the site plus the routes to the stations, bus stops, local centre, schools and open space people will actually use, usually starting from a ten minute walking catchment and extending along routes to any interchange beyond it. Agree the extent with Transport for London before the fieldwork.
How does it differ from the transport assessment?
The transport assessment covers trip generation, junction capacity, access and servicing. The Healthy Streets assessment covers the quality of the street environment those trips happen in. They share inputs and must agree on mode share, cycle parking and car parking, because a contradiction between the two is the first thing an officer notices.
How are the improvements secured?
Works inside the site are delivered by the scheme. Works in the adjoining highway go through a section 278 agreement with the highway authority, with its own design approval and programme. Contributions towards wider off-site improvements go through section 106. Mark the three categories differently in the report rather than claiming them all as scheme benefits.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.