Ecology, BNG and Protected Species

When a council must carry out an appropriate assessment

7 min readBy PlanScope Editorial Team

The duty to carry out an appropriate assessment under the Conservation of Habitats and Species Regulations 2017 falls on the competent authority. Applicant ecology work feeds it and cannot replace it.

An appropriate assessment planning application duty falls on the council, not the applicant. Under regulation 63 of the Conservation of Habitats and Species Regulations 2017, a competent authority must carry out an appropriate assessment before granting permission for anything likely to have a material effect on a habitats site, either alone or in combination with other plans and projects. The applicant's ecology work feeds that assessment. It cannot be the assessment.

Getting this wrong produces permissions that are vulnerable to challenge, and it is one of the few areas of development control where a procedural slip is fatal rather than curable.

The screening stage and the test it applies

Screening asks one question: is the proposal likely to have a significant effect on a habitats site, alone or in combination with other plans or projects, and is it not directly connected with the management of that site. The threshold is low. It is a likelihood test applied on a precautionary basis, and the Court of Justice made clear in Waddenzee in 2004 that the trigger is the possibility of an effect rather than proof of one.

Three consequences for practice. Distance is relevant but not decisive, because hydrological and air quality pathways reach a long way. The absence of a recorded qualifying feature on the application site proves nothing, since effects on the site's features can arise from off-site sources. And a conclusion of no likely effect has to be reasoned on the evidence rather than asserted in a single line of an officer report.

The screening output should name the habitats site, list its qualifying features, identify each impact pathway considered, and explain why each is ruled out. Where survey evidence is thin because access was refused, that limitation belongs in the screening record, and our note on ecology surveys where access to adjoining land is refused covers how to document it.

Mitigation cannot rescue the screening stage

This is the rule most often broken. In People Over Wind and Sweetman in 2018 the Court of Justice held that measures intended to avoid or reduce harmful effects cannot be taken into account at the screening stage. Screening asks whether an effect is likely in the absence of mitigation.

The practical effect is that a scheme with embedded ecological mitigation designed specifically to protect a habitats site will generally screen in, and the mitigation is then assessed at the appropriate assessment stage where it belongs. Councils that continue to screen out on the strength of mitigation are creating grounds of challenge.

Two distinctions worth holding onto. Measures that form part of the scheme for reasons unconnected with the habitats site, such as a drainage design required by the lead local flood authority, are part of the project description rather than mitigation. And avoidance through design, such as siting development outside a functionally linked area entirely, can be part of the project rather than a measure bolted on to address an effect. The line is difficult to draw, and where it is arguable the safer course is to screen in.

In-combination effects and how they are handled

The in-combination test is what catches schemes that would be harmless on their own. It requires the authority to consider the proposal alongside other plans and projects, which in practice means extant permissions not yet implemented, allocations in the development plan, and applications under consideration.

Air quality on protected heathland is the familiar example. Traffic from one small scheme adds little to nitrogen deposition on a site already at or above its critical load, and the cumulative effect of many such schemes is the problem. The High Court's decision in Wealden District Council v Secretary of State for Communities and Local Government in 2017 turned on exactly that failure to assess in combination.

Nutrient loading in affected catchments works the same way, through wastewater and surface water pathways rather than air.

Pathway Typical in-combination source Evidence usually needed
Air quality and nitrogen deposition Traffic from multiple permissions on shared routes Traffic modelling, deposition modelling against critical loads
Nutrient loading Housing across a catchment discharging to the same works Nutrient budget, treatment works permit limits
Recreational disturbance Cumulative population growth within a zone of influence Visitor surveys, mitigation strategy contributions
Water abstraction and levels Multiple developments drawing on the same resource Water resources position from the undertaker

Where a strategic solution exists, such as a mitigation strategy funded by tariff contributions, the authority can rely on it, provided the strategy itself has been assessed and the contribution is secured.

The competent authority, and Natural England's role

The council is the competent authority for a planning application. It must consult Natural England as the appropriate nature conservation body and have regard to its representations, and where Natural England objects the authority has to grapple with that objection rather than note it.

Natural England's advice is not binding. An authority can depart from it, but doing so requires the authority to have its own evidence base, since the assessment has to be capable of removing reasonable scientific doubt about adverse effects on site integrity. In practice councils rarely disagree with a clear objection, and applicants are better served by resolving the objection than by inviting the authority to overrule it.

Applicants routinely prepare a shadow habitats regulations assessment for the authority to adopt. That is normal and helpful, provided it is written as a document the authority can own, with the reasoning exposed rather than the conclusion asserted. A Preliminary Ecological Appraisal and any Protected Species Survey work sit underneath it as evidence. Protected species surveys and any licence application require a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the 2017 Regulations, and a draft report is a starting point for that professional rather than a substitute.

The assessment itself, and the standard it must reach

The appropriate assessment has to enable the authority to conclude, beyond reasonable scientific doubt, that the proposal will not adversely affect the integrity of the habitats site, taking mitigation into account.

That is a demanding standard and it shapes what the document must contain:

  1. The site's conservation objectives, taken from the published objectives rather than paraphrased.
  2. Each pathway carried forward from screening, assessed against those objectives.
  3. The mitigation relied on, described precisely enough to be secured by condition or obligation.
  4. The mechanism securing it, named.
  5. Monitoring where the effectiveness of mitigation is uncertain, with a remedy if it underperforms.
  6. A reasoned conclusion on integrity, addressing residual uncertainty openly.

Uncertainty is the hard part. Where the evidence leaves genuine doubt, the correct conclusion is that an adverse effect cannot be ruled out, which moves the application into the derogation route rather than allowing a finely balanced approval.

Derogation: alternatives and overriding public interest

Where an adverse effect on integrity cannot be excluded, regulation 64 allows permission only if there are no alternative solutions and there are imperative reasons of overriding public interest. Compensatory measures must then be secured to maintain the coherence of the network of habitats sites.

This route is rare in development management and demanding in practice. The alternatives test looks at alternatives to the project in its location and form, not merely at design variants. The public interest test is judged against the interest served by the site's protection, and for sites hosting priority habitats or species the categories of interest that can qualify are narrower still.

Most applicants reach this point because the scheme was designed before the habitats position was understood. The better sequence is to screen early, then design.

Recording the assessment in the decision

The assessment must be evidenced on the file before permission is granted, not reconstructed afterwards. That means the officer report or a separate assessment document setting out the screening reasoning, the appropriate assessment where one was required, Natural England's advice and the authority's response to it, and the conditions or obligations securing mitigation.

Where a committee resolves to grant against the officer recommendation, the assessment has to be revisited before the decision notice issues. And where circumstances change between resolution and issue, such as new deposition evidence or a revised catchment position, the authority has to look again. Browse the ecology and environmental report types to see which supporting documents a site with a habitats constraint is likely to need.

PlanScope drafts ecological and planning documents structured to UK planning policy, with missing site facts flagged. Reports should be reviewed before submission, and we do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Who carries out the appropriate assessment?

The competent authority, which for a planning application is the local planning authority. Applicants commonly prepare a shadow habitats regulations assessment for the council to adopt, and that is normal practice, but the duty and the judgement remain with the authority. The document has to expose its reasoning so the authority can own the conclusion.

Can mitigation be taken into account when screening?

No. In People Over Wind and Sweetman in 2018 the Court of Justice held that measures intended to avoid or reduce harmful effects cannot be considered at the screening stage. Schemes with embedded mitigation aimed at protecting a habitats site will therefore usually screen in, with the mitigation assessed at the appropriate assessment stage.

What are in-combination effects?

Effects arising when the proposal is considered alongside other plans and projects, including extant permissions, allocations and pending applications. Nitrogen deposition on heathland from traffic across many schemes is the classic example, and the Wealden District Council case in 2017 turned on a failure to assess it. Nutrient loading works the same way.

Is Natural England's advice binding on the council?

No, but the authority must consult it and have regard to its representations. Departing from a clear objection requires the council to hold its own evidence sufficient to remove reasonable scientific doubt about adverse effects on site integrity. In practice councils rarely do, so resolving the objection is more productive than inviting the authority to overrule it.

What happens if an adverse effect cannot be ruled out?

The application can only be granted through the derogation route in regulation 64, which requires there to be no alternative solutions and imperative reasons of overriding public interest, with compensatory measures secured. This is demanding and rare in development management, and it usually reflects a scheme designed before the habitats position was understood.

Sources and further reading

habitats regulationsappropriate assessmentecologynatural englandscreening

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Ecology, BNG and Protected Species

View all →
Ecology, BNG and Protected Species7 min read

Local nature recovery strategies and the metric multiplier

A habitat identified in a local nature recovery strategy attracts a higher strategic significance multiplier. That makes the local habitat map a layout document, not a submission document.

Read article →
Ecology, BNG and Protected Species8 min read

Ancient woodland buffers and the evidence behind them

A 15 metre buffer of semi-natural habitat is the starting point, measured from the woodland edge rather than the inventory polygon. The pressures it addresses and the evidence that moves the figure.

Read article →
Ecology, BNG and Protected Species7 min read

SSSI impact risk zones and what they actually trigger

An impact risk zone is a consultation trigger, not a designation. How to check the layer on MAGIC and planning.data.gov.uk, read the development categories, and give Natural England what it needs first time.

Read article →
Ecology, BNG and Protected Species7 min read

When a preliminary appraisal becomes an impact assessment

The appraisal is a constraints document and the assessment judges effects on important features. Which triggers force escalation, how the survey calendar differs, and how to write the brief.

Read article →
Ecology, BNG and Protected Species7 min read

Programming a scheme around bat survey seasons

A preliminary roost assessment can be done in any month, but emergence and re-entry surveys are limited to the maternity season. Survey effort by roost potential, and how to keep the rest of the scheme moving.

Read article →
Ecology, BNG and Protected Species8 min read

The degradation rule and your biodiversity net gain baseline

Schedule 7A to the Town and Country Planning Act 1990 reverts the pre-development biodiversity value to its pre-clearance level where habitat was degraded after 30 January 2020.

Read article →