Which applications are referable to the Mayor of London

7 min readBy PlanScope Editorial Team

Referral is automatic on the facts set out in the Mayor of London Order 2008. The borough still decides, but it cannot issue a decision without going through the Mayor twice.

An application in Greater London is referable to the Mayor when it falls into one of the categories of potential strategic importance set out in the Schedule to the Town and Country Planning (Mayor of London) Order 2008. The headline triggers are residential development of more than 150 homes, floorspace above thresholds that vary between central London, outer London and the City, and buildings above stated heights, with further categories for Green Belt and Metropolitan Open Land, waste and minerals. Referral is automatic on those facts. The borough still determines the application, but it cannot issue a decision without going through the Mayor twice.

Read the Schedule rather than a summary before you rely on the position, because the categories are drafted tightly and a scheme can be referable on a ground you did not expect.

The categories of potential strategic importance

The Order groups the triggers into categories. In practice four sets of facts catch most schemes.

Residential scale is the one everybody knows: development comprising or including more than 150 houses, flats, or houses and flats. Note "more than", so 150 units exactly is not referable on that ground and 151 is.

Floorspace thresholds differ by location. Outside central London and outside the City, the threshold is lower than the central London figure, and the City of London carries a much higher one. Establish which zone the site sits in before measuring, because the boundary of central London for these purposes is defined in the Order and is not the same as any borough boundary.

Height triggers bite on tall buildings and on riverside sites. Buildings adjacent to the River Thames become referable at a lower height than buildings elsewhere, and the City of London has its own much higher figure. The riverside trigger catches modest buildings that nobody thinks of as tall.

Then there are the designation and use-based categories: development on Green Belt or Metropolitan Open Land above stated floorspace or site area figures, waste development, and mineral working. A small building on Metropolitan Open Land can be referable where a much larger one on an ordinary urban site is not.

Residential thresholds and how units are counted

The count is of houses and flats in the development, and two questions follow from that.

First, what counts as a unit. Purpose-built student accommodation and large-scale shared living are not houses or flats in the ordinary sense, and whether a scheme of that kind is referable on the residential ground depends on the form of the accommodation. Schemes of that scale usually trip a floorspace trigger anyway, which makes the question academic more often than not.

Second, whether phases are aggregated. An application for a phase of a larger site is assessed on the development applied for. Splitting a site into two applications of 90 and 80 units to avoid referral is the kind of arrangement the Greater London Authority looks at closely, and a borough is unlikely to help you with it.

Trigger type What is measured Practical trap
Residential Number of houses and flats in the application "More than 150", so the count at exactly 150 is not referable on this ground
Floorspace Floorspace, with different thresholds by zone Central London for these purposes is defined in the Order
Height Building height, lower next to the Thames Riverside trigger catches buildings nobody calls tall
Green Belt and Metropolitan Open Land Floorspace or site area Small buildings on designated open land can be caught

How the stage one and stage two process runs

The mechanics are what add time to your programme, so plan for them.

  1. Before the borough determines the application, it refers the case to the Mayor. The Mayor has six weeks to provide a statement on whether the proposal complies with the London Plan and, if not, what changes would make it comply. This is the stage one report.
  2. The borough continues to process the application, usually negotiating on the points the stage one report raised.
  3. When the borough's committee or delegated officer resolves to grant or refuse, the borough refers the case back to the Mayor for stage two.
  4. The Mayor then has 14 days to decide whether to allow the borough to determine the application, to direct refusal, or to take over the application as local planning authority.
  5. If the application is not called in and refusal is not directed, the borough issues the decision.

The stage one report is a public document and it is the single most useful thing you will read about your own scheme. It states the Greater London Authority's position on housing, affordable housing, design, transport, energy, fire safety and whatever else is in issue, and it usually tells you exactly what will be negotiated for the next four months.

Mayoral direction to refuse or call in

Two powers sit at stage two and they are different in kind.

A direction to refuse ends the application. The borough must refuse, and the applicant's route is an appeal to the Secretary of State against that refusal.

Taking over the application, commonly called a call-in, is a power under section 2A of the Town and Country Planning Act 1990, inserted by the Greater London Authority Act 2007. The Mayor becomes the local planning authority for that application and determines it, normally after a public representation hearing. The borough remains a consultee and often objects. What the Mayor cannot do is direct a borough to grant permission.

A call-in is not a shortcut to consent and it is not something an applicant can require. The decision rests on whether the scheme has a significant effect on the implementation of the London Plan, and on the other tests in the Order.

Timescales and what they add

Assume the referral adds between two and four months to a scheme that would otherwise have been determined by the borough alone, and more where the stage one report asks for material change.

The six-week stage one period runs in parallel with the borough's own consultation, so it is not wholly additive. The stage two period is short but it comes after the committee resolution, which means the time between resolution and decision notice is longer than applicants expect. Where a section 106 agreement is being completed in the same window, the practical delay is usually driven by the agreement rather than by the referral.

Build the referral into the survey and reporting programme rather than treating it as a procedural afterthought. Referable applications attract a defined set of supporting documents under the London Plan: an energy assessment following the "be lean, be clean, be green, be seen" hierarchy, a whole life carbon assessment, a circular economy statement and, for relevant buildings, a fire statement. Those are substantial pieces of work.

Preparing for a GLA case officer

Ask for a pre-application meeting with the Greater London Authority as well as with the borough, and ask for it early enough to change the scheme.

Bring the strategic case rather than the local one. The GLA case officer is testing the proposal against London Plan policy: housing delivery and affordable housing tenure and proportion, density and design quality, agent of change and noise, transport mode share and car parking, urban greening, energy and carbon, and fire safety under the London Plan's design policy on fire.

The documents to have in order before that meeting are the Energy Statement with the hierarchy set out stage by stage, the Whole Life Carbon Assessment prepared to the RICS methodology, the Circular Economy Statement and, where the building is caught, the Fire Statement prepared by someone with fire-engineering competence and submitted for Planning Gateway One.

Get the affordable housing position settled before stage one if you possibly can. A stage one report that records an unresolved affordable housing offer sets the tone for everything afterwards, and it is the point on which most referable schemes spend the longest.

This is general guidance, not legal advice. Check the current Order, the London Plan and the relevant Mayoral guidance before relying on it. Fire statements require a professional with the necessary fire-engineering competence, and PlanScope's draft is a starting point for that professional rather than a substitute. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What makes an application referable to the Mayor

Falling within a category of potential strategic importance in the Schedule to the Town and Country Planning (Mayor of London) Order 2008. The main triggers are more than 150 homes, floorspace above thresholds that differ between outer London, central London and the City, stated building heights, and development on Green Belt or Metropolitan Open Land above given figures.

Does referral mean the Mayor decides the application

Not usually. The borough determines it, but must consult the Mayor before deciding and refer the case back after resolving to grant or refuse. At that second stage the Mayor can allow the borough to determine, direct refusal, or take the application over as local planning authority. Most referable applications are decided by the borough.

Can the Mayor direct a borough to grant permission

No. The Mayor can direct refusal or take over the application and determine it, but there is no power to direct a grant. If the Mayor takes the case over under section 2A of the Town and Country Planning Act 1990, the Mayor becomes the local planning authority and normally holds a public representation hearing before deciding.

How much time does a referral add

Plan for two to four months over a comparable non-referable scheme. Stage one gives the Mayor six weeks and runs alongside the borough's consultation, so it is not wholly additive. Stage two is 14 days but falls after the committee resolution, which lengthens the gap between resolution and the decision notice.

What extra documents do referable schemes need

The London Plan expects an energy assessment following the be lean, be clean, be green, be seen hierarchy, a whole life carbon assessment, a circular economy statement and, for relevant buildings, a fire statement for Planning Gateway One. These are substantial pieces of work, so programme them before the pre-application meeting rather than after.

Sources and further reading

london planmayor of londonreferable applicationsmajor developmentplanning process

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in London

View all →
London7 min read

Play space on a London podium: making the deck work

Podium play space is judged on whether it functions, not on whether it measures 10 m2 per child. Here is how supervision, loading, drainage and wind shape the deck.

Read article →
London7 min read

Housing design standards: space, aspect and dual aspect

London residential schemes are tested against the national space standard, a tighter ceiling height, a dual aspect expectation and limits on units per core. Those four together decide whether a layout works.

Read article →
London7 min read

Fire safety and policy D12 in a London application

Policy D12 of the London Plan asks every development to meet the highest standards of fire safety and asks major schemes for a statement from a suitably qualified independent assessor. It overlaps with Planning Gateway One without replacing it.

Read article →
London6 min read

Water consumption targets and how to reach 105 litres

The 105 litre target in London is delivered through the optional requirement in Part G of the Building Regulations, imposed by planning condition. Here is how the calculator works and which fittings actually get you there.

Read article →
London7 min read

Industrial land: policy E7 and no net loss of capacity

London industrial land policy starts from retention, not release. Here is how the capacity test works, what intensification and co-location mean in practice, and the evidence a borough will expect before it accepts any loss.

Read article →
London7 min read

Small sites policy and what it supports in outer London

Policy H2 gives small residential schemes in London a presumption in their favour. Knowing which category your site falls into is most of the argument.

Read article →